HomeMy WebLinkAboutBLD03-143Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360)379-3208 Fax: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permft Number: BLD03-143 Issued: 08/13/03 Parcel Number: 961 200 610
Job Address: 2554 Hancock Street Zoning: R-II Type: V-N Occupancy: U-1
Nature of Work: Construct 864 square foot Pole Building for use as carport.
Owner: Jeff Durall
GENERAL CONDITIONS APPLY -SEE NEXT PAGE
•
RF,nTTTRF.T) TN~PF,CTTON~
Contractor: Town & Country - PermaBilt
TOWNCPF099LT (1-800-824-9552)
A PPR (1VF.T)/n A TF.
TEMPORARY EROSION & SEDIMENT CONTROL
See General Condition No 2, install on-site as needed
during construction -okay to use existing driveway as
construction entrance '
FOOTING - ProLine PakMix or Quikcrete #110; verify
thickness of punch pad after pour prior to post set
r
Setbacks
"
' _,^~,," ~~' ~ ~ ~~ j~,/f~ ,~
` `'
deep per engineered plans
Post Footings - 24
diameter, 4
~~ }-- :
~-
VerifyPost Hole Dimension Prior to Pour
Punch Pad
SLAB - N/A -Dirt Floor
FRAMING
Posts - 4 x 6 sidewall; 6 x 6 HF#1 endwall per engineering
Rake Beams 2 x 12 with 2 x 6 ledger
Girts - 2 x 6 P.T.
WalUGirt Connections
Purlins - 2 x 6 @ 24" o.c.
Truss/Purlin Connections
Bracing
Strapping
Trusses -pre-fabricated engineered -engineered truss plan
shall be on-site at time of inspection
Continued next a e
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit # BLD03-143
REQUIRED INSPF.C'.TTnNC ~ ~nnw~1.~., .•rT•
FRAMING (continued from page 1)
Truss Lateral Bracing
Truss Positive Connections
Seismic Anchors
Cladding - sidewall
Blocking
Bolts & Washers
Siding & Roofing
FINAL
House Numbers - At Main Entrance 5" numbers of
contrasting color posted near main entrance of house and
visible from street per City Ordinance
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration number
and a City business license. Failure to provide proof of this documentation prior to work may result in job shut
down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to
beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction
entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils ezposed during construction shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding,
plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP)
require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections-are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works requirements have
been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice
is required. Public Works an»roval must be received arior to scheduling the Building Deaartment's final
inspection.
7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for anon-residential
project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the
Building Department within one year. Call for at least one inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at
379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
~ I~TSI~I:t;'1'It)\T li.l;l't)li~'1'
NAME ,~tl- Permit No.C~~ - ~.~~
o~~~ ~ - t ~ ~ ~ ~s~~~ .
-J~ -~ ~ ~,J~~
G~_ ~2 l~ ~~.JSP~~no~J
DO NOT REMOVE THIS TAG
Date ~o ~ By
CITY OF PORT TOWNSEND, BUILDING & COMMUNITY DEVELOPMENT
WATERMAN & KATZ BUILDING, 181 QUINCY ST, SUITE 301, PORT TOWNSEND, WA 98368 (360) 379-3208
YOU ARE HEREBY NOTIFIED THAT NO MORE WORK SHALL BE COVERED UPON THESE PREMISES UNTIL THE ABOVE VIOLATIONS ARE CORRECTED.
WHEN CORRECTIONS HAVE BEEN MADE, CALL FOR REINSPECTION AT 385-2294.
YOU MAY APPEAL DECISIONS OF THE BUILDING OFFICIAL TO THE BOARD OF APPEALS WITHIN 15 DAYS OF INSPECTION DATE.
FOR FURTHER INFORMATION CONTACT BCD AT (360) 379-3208