HomeMy WebLinkAboutBLD03-138r
~_
Watem~an & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360)379-3208 Fax: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BL- D03-138 Issued: 08/12/03 Parcel Number: Treehouse PUD. Lot 2/3. Unit 10
Job Address: 1502 W Street Zoning: Treehouse PUD Type: V-N Occupancy: R-3
Total Occupant Load: 4 Nature of Work: Construct single-family residence.
Owners: Madrona Village LLC Contractor: QED Builders LLC - OEDBUI*0431D1
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
Any work with equipment within the 10' buffer adjacent to San Juan Estates requires rior written
approval from BCD Director.
REniTTRF.n TN~PF,C'TT~N~
•
APPRnVEn/nATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
__ _ __ _
Setbacks ------ --- -_ .._.___._._ .: _
_ -__ _ _
Footings _
_
Interior Footings ~
` '
` ~
`
' ~
~
Forms ~
~ '/ ~
`>
"~~ r ~
-
Reinforcement -
Porch/Deck Piers ~- / ~ ~ -• ~ ~
~_ ,.~
~
~,~
GROUNDWORK PLUMBING
Pressure Test
Pipe Joints Exposed
Pipe Bedding
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page i of 4
Pemilt # BLD03-138 ~
REQUIRED INSPF(''TTnN~
e ppunvFnm ~ m~
- - - - - -
FOUNDATION ~v . ia~i yc~ i i~•
d~ ~,~ g~~ A~~t ~
Stem Wall
Forms
SK-Ib - t ~ ~l z~~o3
Reinforcement
Anchor o is - -per architects s ear wa l schedule --
Holdowns -per architectural design Q
~ l~~Z~1 D ?j-
SLAB
Setbacks
Forms
Interior Footings
Anchor Bolts - -per architects shear wall schedule
Reinforcement - #3 @ 24" o.c. each way @ slab
oldowns architectur des n /
.. ~--~
PLUMBI G:
Rough-In (D-V-T & Clean outs)
Water Supply
Gas Supply
Water Hammer Arrester @ clothes & dishwashers
Hose Bibs (backflow protection required)
Pipe Insulation ~-3)
Pressure Reduction Valve if > 80 psi
Water Heater
R-10 under if electric
Seismic Restraint -strap tank @ 1/3 points
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
MECHANICAL
LPG Stove -manufacturer's installation instructions shall
be on-site at time of inspection.
Whole House Fan @ @ upstairs bathroom -Max. 75 CFM
Kitchen/Bath/Laundry Fans
Environmental Air Exhaust ducting (w/ backdraft dampers),
insulation (R-4) and terminus (located 3' from openings)
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
..
,l-=
., Pemil[ # BLD03-138
REQUIRED INSPF,(''TTnN~ s unun~r~nm ~ m~
~_
,~ `. J
- -- - - - - -
FRAMING 11 1 1_V • .i7L/ LL's 1 1J
~ .._
-_ _ , ,
--
'
Walls v
,
~
. A ;. , ~ ~ ~, ; ~ } -~..
Shear Walls -per architectural design
Ceilings
Posts, Beams & Headers -per architectural design
Roof
Ridge Beam -per architectural design
Blocking
Rafter Positive Connection - H1
Roof Venting - eave and ridge vents (NOTE: Shed roofs)
Windows -escape
Windows -safety glazing
Windows Ufactor - .40 or better
NFRC window sticker must be on windows &
doors at inspection time
Fresh Air Intake (Window Ports)
Doors U-Factor - .20 or better
Air Seal
Fire Blocking
Weather Resistive Barrier
INSULATION
Floor (R-30) ~ ' ~ ~, ,`"
Walls (R-21 )
}.
Ceiling (R-34vault/R-38 attic )
Vapor,Barrier:-paint for walls and ceiling +
Baffles
DRY WALL NAILING l` -
Walls
.,
Ceiling '-' '. w _..-~'"
Enclosed Usable Space under Stairs
FINAL
Public Works Sign-Off
Parking -1 space required ~~~,r JJ
~ Cc'
~
House Numbers - 5" minimum
LPG ~
01" ~
~~
ti ~ ~ 5
~0
~
/~
~
Plumbing /
p
G 5 ~ ~l
MechanicaUHeating
Vapor Barrier Paint Certificate
Insulation Certificate
Smoke Detectors
Final -Building
Call 48 hours before you di for utili .line locates
g tY
1-800-424-5555
Page 3 of 4
ti_~
Pemut # BLD03-138
GENERAL C NDITIONS
•
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a Citv business license. Failure to provide proof of this documentation prior to work may result in
job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to
beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP)
require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works requirements
have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four
hours notice is required Public Works approval must be received prior to scheduling the $uilding
Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is.required for anon-residential
project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done by the
Building Department within one year. Call for at least one inspection per year to keep your building permit
active.
9. Revisions require submittal and approval rior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST TffiS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before ou di
y g for utility line locates
1-800-424-5555
Page 4 of 4