Loading...
HomeMy WebLinkAboutBLD03-136Waterman & Katz Building 181 Quincy Street Suite 301 PoR Townsend, WA 98368 Phone (360) 379-3208 Fax (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-136 Issued: 06/27/03 Parcel Number: 949 817 502 Job Address: 809 Gaines Street Apt. #11 Zoning: C-II/MU Type: V-N Occupancy: R-1 Total Occupant Load: No Change Nature of Work: Repair/replace upper deck framing as needed. Owner: Kearney Street Apartments Contractor: Discovery Bav Construction - DISCOBC090B9 (385-4372) GENERAL CONDITIONS APPLY -SEE LAST PAGE r~r. ~>rTT~>cr~ 7NCDT~`!`TTl1NC APPRnVED/DATE l~J V 11\lJL 11 \ V l iJ ~ i i v l ~ v DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state and federal laws. - -- - - - - FLOOR FRAMING/DECK All framing members to be pressure treated or wood of natural resistance to decay Posts and Beams -replacement of posts and beams , requires a revision to this permit. - Plywood Sheathing with waterproof membrane Joists (Pressure Treated~2" x l2") Positive Connections Joist Hangers FINAL Building Numbers posted (minimum 5") , Guardrails (Existing) Deck -Final • Ca1148 hours before you dig utility line locates: 1-800-424-5555 Page 1 of 2 Pemrit # BLD03-136 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's i registration number and a City business.license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig utility line locates: 1-800-424-5555 Page 2 of 2