Loading...
HomeMy WebLinkAboutBLD03-135Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: 360-379-3208 Fax 360-385-7675 u n U • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-135 Issued: 08/06/03 Parcel Number: 989 710 503 Job Address: 928 Franklin Street Zoning: R-II Type: V-N Occupancy: UU=1 Total Occupant Load: 1 Nature of Work: Construct Detached Caruort for Single Family Residence Owners: William Miller & Karen Knowlton Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 REOUTRED TNSPEC.TTONS APPROVFn/DATF. TEMP EROSION & SEDIMENT CONTROL Silt Fence & Drive Off Mat as needed during construction to prevent erosion and prohibit tracking of dirt and debris onto Cityrights-of--way. Okay to use existing driveway as construction entrance. See General Condition #2 FOOTINGS -Per attached engineering Setbacks T 10 feet from rear; 5 feet from side property lines. Measurements shall be from outside of posts. Eaves may go into setback maximum 2 feet. Footings Forms Reinforcement - (2) #4s each way under post , Concrete Pier Footings - (4) 24" x 18" x 4' Verify post hole dimension prior to pour Pak Mix Proline or Quikcrete #1101 Verify thickness of punch pad after pour prior to post set Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Building Permit #BLD03-135 RE UIRED INSPECTIONS APPROVED/DATE FRAMING: Walls - (8) PT posts Ceiling/Roof -site built engineered truss plan -Sheet A-6 Bracing Blocking Post-to-Truss Positive Connection - (3) each member Post-to-Beam Connection FINAL Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's. registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut. down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP} require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. S. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's fmal inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLAN5. 10. Revisions require review and approval prior to making changes to the approved plans. Contact the Building Department at 379-3208 prior to making changes to the approved plans. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page Z of 2