HomeMy WebLinkAboutBLD03-134'~- . ',
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phoce: 360-379-5086 Fax 360-3857675
CITY OF PORT TOWNSEND
•
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-134 Issued: 07/28/03 Parcel Number: 931400 501
Job Address: 913 F Street Zoning: R-I Type: V-N Occupancy: R-3/U-1
Total Occupant Load: 5/1 Nature of Work: Construct Single-family Dwelling
with attached garage
Owner: Jill Tomasi Contractor: Craig Johnson CRAGJC992N2
GENERAL CONDITIONS APPLY: See last page
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
i?Ti t(17TT72Ti 71 TNCpFtf''TT(lNQ APPR()VFn/nATF
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS ~'
~
Setbacks ,.,,, , /`
} ~ ~ ~~ --
- ~ ,fit ; ; ~
~~~
~
'~
Footings -
_
_
Forms
Reinforcement __ _ _--._-_-_---~_________ __-_.
___ __
_ - - _-_________.~-----_.-.,-----______.,_.______
_. __ , _-
.____e
Interior Footings
Porch footings u ~ _~ , ~~~-, ~; ~ ~ ~ C j
LIFER ~ C
FOUNDATION
k ~
Stem Wall ~ "
Forms '
Reinforcement
Anchor Bolts & Washers
Post to Foundation Wall Positive Connection
Vents -13 Required
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 4
M
,.' ; ,. .
Building Permit ik03-134
REQUIRED INSPECTIONS APPROVED/DATE
GROUNDWORK PLUMBING
Pressure Test
Pipe Joints Exposed 1 ~
Pipe Bedding ~J
-
PLUMBING
~
~
Rough-In (D-V-T & Clean outs) ~
Water Supply
Water Hammer Arrestors
+~ C~
~
~ ~ (~~
LPG Gas Supply ~
l-
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pressure Reduction a ve if > 80 psi
Water Heater
R-10 under if electric
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground
MECHANICAL
LPG Stove - provide specs on-site
Manufacturer's installation instructions to be on-site
@ time of inspection.
Source Specific Exhaust Fans @ bathrooms (SOcfin),
laundry room, (50 cfin) and kitchen (100
ft
±
J ~
w~ronmen a uc mg (w/ backdra -
dampers), insulation (R-4) and terminus (located 3' ~~~ l~ , ~ ~ ~ 7 ~3
from o enin s
Whole house fan -Guest bath
i
s
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
. 1<
REQUIRED INSPECTIONS
•
C
Building Permit #03-134
APPROVED/DATE
FRAMING -~ ~~~~ _
~
'
Floor -Engineered BCI plan to be on site at inspection
ll , .__ ._ ~
~ ~ ~- .~ ~ ~ ~ ~ ~ ~,._ ~ , ~ ~
J -
,~
y4 ~ ~ /
~
Wa
s
Shear walls ~t
-~~.r_.~ ~.~ ~'~
~
~
-~a.'r~°'~ ~~ ~~~ `~-r ~_?
Shear Panel Blocking ~ ~-
Roof- Engineered truss plan to be on site at inspection
Porch Roof -Rafters
Attic venting -ridge & eave
Posts, beams and headers
Windows -escape ,~
Windows -safety glazing
Window U-factor - 0.40 or better
Door U-factor - 0.20 or better /
"(
~,
'~ \
Skylight U-factor - 0.58 or better J
r~
;~.~
NFRC sticker must be on windows, doors & skylights
at time of inspection
Air Seal ~ ~
Fresh Air Intake -window ports
Fireblocking
Weather Resistive Barrier
INSULATION
Floor R-30
W
ll
~ ~ ~
,. -
~ ~
~~
..~
a
s (R-21 __..n_.~. ~.~
R
/~~
~ 1 ~
ei irig (
-38, attic -30 vault)
~-~
-
Baffles
__ _. r_ __.. ~_._.._____M ________.. _ .
,.. ~.. _.e .._.~____~..____-___.___,__ . __.____
apor~arner -paint
DRYWALL NAILING
Walls
ili
C
~
~_
~ ~ f ~.~ ~ °~
~
ng
e • r
Garage /House Occupancy Separation `
FINAL
Public Works Sign-off
House Numbers - 5" numbers
Plumbing
LPG
MechanicaUHeating
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Stairs, Decks & Landings
Final -building
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
~.
Building Permit #03-134
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with, mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works approval
must be received prior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months,- or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4
.x,.. .,k
_ .~ ~
,~ d
_ _ ..- _.. _._ - . _._ r
!_
.. •-
~. " ~ _
-~
/ ~ _ ~_ i -
/ ',
,=
., ~ l ,.. ~, ~/
;; _ ~ ~
/ {/ ~j l
~. ;%'
r Y~ ~ r
-//
- ~.
i ,
,., _ ,~
_ /j ..
_ ,.
=~,~-
'`~' ' 6 ~. ,~,,
/y~[~ _ ~r -
~ L
L' L'~~~'-- '1. ~~'°~ ~~ .cam;, , - _ ~ r
,~~ -
~~ ~~~ ~~~~vE TNw~ ~~
~ - ~, ~~ ~
,~ ~~~n ,.
;;'Y C7F Pr`'
~i _ _. i~ ~/-i~fV!
WATERMAN & KATZ BtJi~ s~,'~'dG, 181 ~UINGY ST , .~ _ ; ~_; ~, -~, 4'dA 983fi~~ 34~t' ~;~, ;._
YOIJ ARE HEREBY NOTIFI~' :;,;, :~~ MORE: `vVORK SHALL E'- t,~'JcF ~ :.~ ,~r _ ~'i5E` ~;"~ ABOVE VIOLA"1iUNS ARE C;C;'~ ~ ~' ~r'~
`u~/HEN COF?REGTIONS HAVE BEEN F ,. i;A ~I~, F r >>~=CTI<' ~ ra?294. -
'~~U MAY APPEAL UE~ISEONS OF THE BUILDING O~-f 'Cl~,~ ~ = .;r ~ _ - LS 1~" . F'.!^~ 15 DAYS OF INSPECTION DATE.
t-C1R FURTHER lNFORMATa v :;ONTO ;:~;G ) 379 308