CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-133 Issued: 08/12/03 Parcel Number: Treehouse PUD. Lot 2/3, Unit 11
Job Address: 2311 Ebonv Street Zoning: Treehouse PUD Type: V-N Occupancy: R-3
Total Occupant Load: 4 Nature of Work: Construct single-family residence.
Owners: Madrona Village LLC Contractor: QED Builders LLC - OEDBUI*0431D1
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
Any work with equipment within the 10' buffer adjacent to San Juan Estates requires prior written
approval from BCD Director.
RFnUTRFn TN~PF.("TTnN~ APPRnVF>n/11ATF
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks o~. ,
; ~ -
!
Footings r
~~ _ ~~ ~ ;~ Z ~~~ ~`~~
Forms `
Remforceme~t ._ .__ _ ._. .
LIFER
- ,.~-.~
Porch/Deck Piers c-~-~ i~r r~~+~ <-~~ ~ x~-" t '` ' !,"
FOUNDATION
Stem Wall !
' ~
~
Forms ;r
tr
~ ~
~~ , _~
Reinforcement _
_._ . , .
----_ _ _ .~ _ ,_--~____~___ __.~.._-_
Anchor Bolts
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
Permit q BLD03-133
REOiJiRF.n TNCPFf'TT(11VC ~vunn~r~nm ~ ~r~
GROUNDWORK PLUMBING
Pressure Test
Pipe Joints Exposed
~'~ ~ f~-~
Pipe Bedding I `
SLAB
Interior Footings
R~infor - U1~ ~X~ ~
~ ~~~D ~3
hor_Bolts _ ___ _ _._.__----------- _
____ --
Electric Radiant system ----~
~, f
PL MBING:
Rough-In (D-V-T & Clean outs)
Water Supply
Gas Supply
Water Hammer Arrester @ clothes & dishwashers
Hose Bibs (backflow protection required) ~. J
~
Pipe Insulation (R-3)
1
Pressure Reduction Valve if > 80 psi
Water Heater
R-10 under if electric ,
Seismic Restraint -strap tank @ 1/3 points
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
.MECHANICAL
LPG Stove -manufacturer's installation instructions shall ~,
be on-site at time of inspection.
Whole House Fan @ @ upstairs bathroom -Max. 75 CFM
Kitchen/Bath/Laundry Fans ~
Environmental Air Exhaust ducting (w/ backdraft dampers), ~
insulation (R-4) and terminus (located 3' from openings)
Ca1148 hours before you dig for utility line locates
1-800-424-5555
`~
•
Page 2 of 4
.,
-^~~ ,.a Pemilt # BLD03-133
REQUIRED INSPFCTTnN~ a ppunv~nm ~ m~
FRAMING
._
Walls , ~ ~ ~
Shear W~1Ls ----u. ~ ~'~ $ ~ - ~~ .._..~~ ~.., .. ..
~ ~ , `~
_~_
-
._.... F
Ceilings ; `
Posts, Beams & Headers "per architectural design
Roof
Ridge Beam -per architectural design
Blocking
Rafter Positive Connection - H1
Roof Venting - eave and ridge vents (NOTE: Shed roofs) _
Windows -escape
Windows -safety glazing `
Windows Ufactor - .40 or better
NFRC window sticker must be on windows &
doors at inspection time
Fresh Air Intake (Wall Ports)
Doors U-Factor - .20 or better
Air Seal
Fire Blocking
Weather Resistive Barrier
INSULATION
y
Floor (R-30) ,'~ ~
Walls (R-21)
.-, ~ ~
Ceiling (R-30vault/R-38 attic)
Vapor Barrier: paint for walls and ceiling
Baffles
DRY WALL NAILING
Walls
Ceiling ~-~ ''
Enclosed Usable Space under Stairs ~ " ~~
k
FINAL , .-
Public Works Sign-Off .T
" a
Parking -1 space required . "• T ,
House Numbers - 5" minimum ~
~`
LPG -
Plumbing `
Mechanical/Heating
Vapor Barrier Paint Certificate
Insulation Certificate
Smoke Detectors
Final -Building
Ca1148 hours before ou di for utili line locates
Y g t3'
1-800-424-5555
Page 3 of 4
~- --.
Permit # BLD03-133 °'r- ~`'
'4
GENERAL CONDITION
1. Contractors working on this project are required to have a Labor & Industries contractor's registration •
number and a City business license. Failure to provide proof of this documentation prior to work may result in
job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to
beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP)
require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works requirements
have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four
hours notice is required. Public Works approval must be received prior to scheduling the Building
Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-resid~l
project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done by the
Building Department within one year. Call for at least one inspection per year to keep your building permit
active.
9. Revisions require submittal and approval rior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST TffiS PERMIT ON-SITE WITH THE APPROVED PLANS.