HomeMy WebLinkAboutBLD03-132Waterman & Katz Building
181 Quincy Street, Suite 301
' Port Townsend, WA 98368
Phoce:360-379-5086 Fax360-3857675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD03-132 Issued: 07/17/03 Parcel Number: 936 901 102
Job Address: 5150 Kuhn Street Zoning: R-I Type: V-N Occupancy: R-3/iJ-1
Total Occupant Load: 2/1 Nature of Work: Construct ADU with garage below
Owner: Craig Johnson Contractor: Owner
GENERAL CONDITIONS APPLY: See last page
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
DL~l17TTDL'Tl TNCDTi~rT''TTl1NC
A PPR f1VF,n/n ATF.
1\iJ t/ZZWY
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks ~ ~, ~~-~ ~~. , ,. ~`,~ ;~-
~
'
~ `
Footings , .
~ ,~ + ~ -
i
Forms ~~
Reinforcement
stn error Footings
Porch footin s
LIFER /^ ~° ~
~ ~ i~
'
'
,
~
FOUNDAT ON
Stem Wall / Z l'?"`~
"~ t'
~
~
Forms ,
, ..
,
__ ,
Reinforcement___ , . _ __., -
Anchor Bolts & Washers
Post to Foundation Wall Positive Connection
~~ ~
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 4
Building Permit #BLD03-132 ~
-..
•
RE UIRED INSPECTIONS APPROVED/DATE
GROUNDWORK PLUMBING
Pressure Test
Pipe Joints Exposed
Pipe Bedding
PLUMBING
Rough-In (D-V-T & Clean outs)
Water Supply
Water Hammer Arrestors
LPG Gas Supply
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
Water Heater
R-10 under if electric
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground
ECHANICAL '
~~"
LPG Stove - provide specs on-site ~
Manufacturer's installation instructions to be on-site
@ time of inspection. ;
L
Source Specific Exhaust Fans @ bathrooms (SOcfm), ~
~ ~
laundry room, (50 cfin) and kitchen (100 cfin) ~
-
Environmental Air Exhaust ducting (w/ backdraft -
dampers), insulation (R-4) and terminus (located 3'
s
Whole house fan - Ba
•
~1
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
V
Building Permit #BLD03-] 32
REnI<1TRF.n TNSPEC'TIONS ~`~APPROVED/DATE
FRAMI ___ yT=`" ~
....
._
.
Moor - ineered BCI plan to be on site at inspection _.,.._.
.. e 6.
- - ~==
Shear walls ~ ~ ~ ~~ ~ ! ~ _~
,
hear Panel Blo
Ro - ngtneered truss plan'to be on site at inspection
Attic venting -ridge & eave '`
Posts, beams and headers
Windows -escape
Windows -safety glazing ~.
Window U-factor - 0.40 or better
Door U-factor - 0.20 or better
Skylight U-factor - 0.58 or better ~~ ,
~ ~
NFRC sticker must be on windows, doors & skylights
at time of inspection
~%
Air Seal
Fresh Air Intake -window ports
Fireblocking ( 1
Weather Resistive Barrier ~~
f
INSULATION
Floor (R-30 )
~~~ ~~
Walls (R-21 '
Ceiling (R-38, attic; R-30, vault) ' J
Baffles G
Vapor Barrier -paint `
DRYWAL NAILING'
~
•
'
Walls _.,% ~
i
Ceiling -
Garage / ADU Occupancy Separation
FINAL
Public Works Sign-off
House Numbers - 5" numbers
Plumbing
LPG
Mechanical/Heating
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Stairs, Decks & Landings
Final -building
•
L~
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
.-
Building Permit IiBLD03-132 '
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures-shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including. nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public ,~,
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works approval
must be received prior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval rior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
°.~.
Call 48 hours before you dig for utility line locates ~+
1-800-424-5555
Page 4 of 4
Waterman & Katz Btilding
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phoce:360-379-5086 Fax 360-3857675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-132R-1 Issued: 08/18/03 Parcel Number: 936 901 102
Job Address: 5150 Kuhn Street Zoning: R-I Type: V-N Occupancy: R-3/LJ-1
Total Occupant Load: 2/1 Nature of Work: Revision #l: Enlarge garage and ADU
Owner: Craig Johnson Contractor: Owner
GENERAL CONDITIONS APPLY: See last page
SEPARATE PERMITS REQUIRED•
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
REQUIRED INSPF,C'TT(~N~
A UDDl1vL~i1 m ~ mrT
See original inspection record for other
inspections.
FINAL
Final -building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion. and sediment control (TESC) measures shall be installed .on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
CALL 48 hours before you dig-for Utility line locates
1-800-424-5555
Page 1 of 2
Building Petmit #BLD03-132R-1
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required Public Works approval
must be rece><ved prior to scheduling the Building Department's final inspection
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval .prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2