Loading...
HomeMy WebLinkAboutBLD03-132Waterman & Katz Building 181 Quincy Street, Suite 301 ' Port Townsend, WA 98368 Phoce:360-379-5086 Fax360-3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-132 Issued: 07/17/03 Parcel Number: 936 901 102 Job Address: 5150 Kuhn Street Zoning: R-I Type: V-N Occupancy: R-3/iJ-1 Total Occupant Load: 2/1 Nature of Work: Construct ADU with garage below Owner: Craig Johnson Contractor: Owner GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 DL~l17TTDL'Tl TNCDTi~rT''TTl1NC A PPR f1VF,n/n ATF. 1\iJ t/ZZWY TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks ~ ~, ~~-~ ~~. , ,. ~`,~ ;~- ~ ' ~ ` Footings , . ~ ,~ + ~ - i Forms ~~ Reinforcement stn error Footings Porch footin s LIFER /^ ~° ~ ~ ~ i~ ' ' , ~ FOUNDAT ON Stem Wall / Z l'?"`~ "~ t' ~ ~ Forms , , .. , __ , Reinforcement___ , . _ __., - Anchor Bolts & Washers Post to Foundation Wall Positive Connection ~~ ~ CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 4 Building Permit #BLD03-132 ~ -.. • RE UIRED INSPECTIONS APPROVED/DATE GROUNDWORK PLUMBING Pressure Test Pipe Joints Exposed Pipe Bedding PLUMBING Rough-In (D-V-T & Clean outs) Water Supply Water Hammer Arrestors LPG Gas Supply Hose Bibbs - backflow protection required Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater R-10 under if electric Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, terminate 6" -24" above ground ECHANICAL ' ~~" LPG Stove - provide specs on-site ~ Manufacturer's installation instructions to be on-site @ time of inspection. ; L Source Specific Exhaust Fans @ bathrooms (SOcfm), ~ ~ ~ laundry room, (50 cfin) and kitchen (100 cfin) ~ - Environmental Air Exhaust ducting (w/ backdraft - dampers), insulation (R-4) and terminus (located 3' s Whole house fan - Ba • ~1 Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 V Building Permit #BLD03-] 32 REnI<1TRF.n TNSPEC'TIONS ~`~APPROVED/DATE FRAMI ___ yT=`" ~ .... ._ . Moor - ineered BCI plan to be on site at inspection _.,.._. .. e 6. - - ~== Shear walls ~ ~ ~ ~~ ~ ! ~ _~ , hear Panel Blo Ro - ngtneered truss plan'to be on site at inspection Attic venting -ridge & eave '` Posts, beams and headers Windows -escape Windows -safety glazing ~. Window U-factor - 0.40 or better Door U-factor - 0.20 or better Skylight U-factor - 0.58 or better ~~ , ~ ~ NFRC sticker must be on windows, doors & skylights at time of inspection ~% Air Seal Fresh Air Intake -window ports Fireblocking ( 1 Weather Resistive Barrier ~~ f INSULATION Floor (R-30 ) ~~~ ~~ Walls (R-21 ' Ceiling (R-38, attic; R-30, vault) ' J Baffles G Vapor Barrier -paint ` DRYWAL NAILING' ~ • ' Walls _.,% ~ i Ceiling - Garage / ADU Occupancy Separation FINAL Public Works Sign-off House Numbers - 5" numbers Plumbing LPG Mechanical/Heating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Stairs, Decks & Landings Final -building • L~ Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 .- Building Permit IiBLD03-132 ' GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures-shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including. nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public ,~, Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval rior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. °.~. Call 48 hours before you dig for utility line locates ~+ 1-800-424-5555 Page 4 of 4 Waterman & Katz Btilding 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phoce:360-379-5086 Fax 360-3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-132R-1 Issued: 08/18/03 Parcel Number: 936 901 102 Job Address: 5150 Kuhn Street Zoning: R-I Type: V-N Occupancy: R-3/LJ-1 Total Occupant Load: 2/1 Nature of Work: Revision #l: Enlarge garage and ADU Owner: Craig Johnson Contractor: Owner GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REQUIRED• Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 REQUIRED INSPF,C'TT(~N~ A UDDl1vL~i1 m ~ mrT See original inspection record for other inspections. FINAL Final -building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion. and sediment control (TESC) measures shall be installed .on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. CALL 48 hours before you dig-for Utility line locates 1-800-424-5555 Page 1 of 2 Building Petmit #BLD03-132R-1 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required Public Works approval must be rece><ved prior to scheduling the Building Department's final inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval .prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2