CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO3-129 Issued: 06/05/03 Parcel Number: 989 700 611
Job Address: 635 Water Street Zoning: C-III Type: V-N Occupancy: N/C
Total Occupant Load: N/C
Nature of Work: Clean and tuckpoint masonry on lower section of west side of building.
Owner: Water Street Corporation
Contractor: Owner
(385-5467)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
Note: Pedestrian protection will be required for work that requires scaffolding on
public sidewalks. Notify the Building Department if scope of work changes.
Any change in exterior paint colors is subject to Historic District Design Review
approval PRIOR to beginning any paintwork (application required). If the new exterior
paint colors are selected from the City's Historic Paint Palette, please complete an
Exterior Paint Registration form available from BCD.
AT(1TTTRFTI TNCPFfTI(1NC
APPRnVED/DATE
1\iJ V 11 \,JY
SEDIMENT CONTROL
Sweep Concrete & Paved Surfaces during
construction as needed. Keep mortar and lime and
other construction sediment out of stormdrains.
MASONRY
Use appropriate mortar mix.
FINAL
Building Number
Final -Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit # BLD03-129
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is reauired. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Cafl for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
r
Call 48 hours before you dig for utility line locates
1-800-424-5555