HomeMy WebLinkAboutBLD03-1280
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone:36O-379-5086 Fax 360-385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD03-128 Issued: 07/16/03 Parcel Number: 931 400 604
Job Address: 627 Redwood Zoning: R -II
Total Occupant Load: 3/1
Owner: Sakura O. Davis
Type: V -N Occupancy: RR=3
Nature of Work: Construct Single-family Dwelling
with attached garage & rainwater collectors
Contractor: Owner
GENERAL CONDITIONS APPLY: See last page
SEPARATE PERMITS REQUIRED:
Electrical Permit — Contact WA State Dept. of Labor & Industries 360-417-2702
DTi'l17T77?Ti'Tl 7NCDTi f''T7l1NC
A PPR OVFD/n A TF,
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS —per architectural details
Setbacks
Footings
Rainwater Collector Footings
Forms
Reinforcement —per architectural design
Interior Footings
Y,
Porch Piers
s -, _
3
Deck
LIFER
FOUNDATION —per architectural detail; all
elements require inspection prior to cover
Stem Wall
- 'c / - 77
Forms
Reinforcement —per architectural design
Anchor Bolts & Washers —per architectural design
Post to Foundation Wall Positive Connection
Engineered Holdowns -per architectural design
CALL 48 hours before you dig for Utility line locates
1-800424-5555
Page 1 of 4
REQUIRED INSPECTIONS
s
Building Permit #03-128
APPROVED/DATF,
FLOOR FRAMING
NOTE: Engineered BCI floor plan on-site and
available to the Inspector at inspection time
Joists
Blocking
Positive Connections
Treated Wood to Concrete
Anchor Bolts & Washers
AiPA�tt5- 4;L4tz, oiCLe'q1111o13
PLUMBING-�DUS>✓'
t( 03
illeating system design to be submitted prior to
__7
inspection
`7
Rough -In (D -V -T & Clean outs)
✓
Water Supply
Zz
Water Hammer Arrestors
Gas Supply
1r
/
ose Bibbs —bac flow protectio
--------______---
Insu ation R�°
Pressure Reduction Valve if > 80 psi
Water Heater
R-10 under if electric
Seismic Restraint — 2 places
Pressure Relief Valve drain to exterior, terminate
6" —24" above ground
MECHANICAL
Boiler — manufacturer's installation instructions
shall be on-site at time of inspection
Whole House Fan — Integrated, heat exchanger
Source Specific Exhaust Fans @ bathroom (50cfm),
laundry room, (50 cfm) and kitchen (100 cfm)
Environmental air exhaust ducting (with backdraft
dampers), insulation (R-4) and terminus (3' from
openings into building)
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
'7
0
•
f�,
RF(IITIRFD INSPECTIONS
Building Permit #03-128
APPROVED/DATE
-
FRAMING -- -- - - --
�._T,. "°-'_ CS t
NOTE. Engineered BCI&loon & roof plan on-site
and available to the Inspector at inspection time
Walls
Beams - per architectural design
Roof
BCI rafter positive connection
Attic venting - ridge & eave
Posts, beams and headers
Windows - escape
Windows - safety glazing
Window U -factor - 0.40 or better
Door U -factor - 0.20 or better
Skylight U -factor - 0.58 or better
NFRC sticker must be on windows, doors &
skylights at time of inspection
Air Seal
Fresh Air Intake - integrated
Fireblocking
Weather Resistive Barrier
INSULATION
Floor (R-30 )
Walls (R-21)
Ceiling (R-30 )
Baffles
Vapor Barrier -paint
DRYWALL NAILING
Walls
Gypsum board clips
Ceiling
Garage House Occupancy Separation
FINAL
Water storage fastening -per architectural design
Public Works Sign -off
LPG
House Numbers - 5" numbers
Plumbing - Solar
Mechanical/Heating
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Stairs, Decks & Landings
Final - Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Building Permit #03-128
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re -inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works approval
must be received prior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for a non-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval gLj2K to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4
0
•
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: 360-379-5086 Fix 360-385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD03-128R-1 Issued: 07/16/03 Parcel Number: 931 400 604
Job Address: 627 Redwood Zoning: R -II Type: V -N Occupancy: R=3
Total Occupant Load: 2 Nature of Work: Revision 1: Construct Studio
Owner: Sakura O. Davis Contractor: Owner
GENERAL CONDITIONS APPLY: See last pate
SEPARATE PERMITS REQUIRED:
Electrical Permit — Contact WA State Dept. of Labor & Industries 360-417-2702
DUi n11T77?Ui'n 7NQ1D1 d"9P11 1VQ
APPR nvFD/D ATF
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS —per architectural details
Setbacks
Footings
Forms
Reinforcement —per architectural design
Porch Piers
Deck
v
FOUNDATION —per architectural detail; all
elements require inspection prior to cover
Stem Wall
Forms
Reinforcement —per architectural design
AnchorBolts & Washers _- per architectural design
—Post to_ Foundation Wall Positive Connection
Engineered Holdowns
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 4
Building Permit #03-128R-1
REQUIRED INSPECTIONS APPROVED/DATE
FLOOR FRAMING
NOTE: Engineered BCI floor plan on-site and
available to the Inspector at inspection time
Hydronic Heat Tubing
Joists
Blocking
Positive Connections
Treated Wood to Concrete
Anchor Bolts & Washers
PLUMBING
Rough -In (D -V -T & Clean outs)
Water Supply
Water Hammer Arrestors
Gas Supply
Hose Bibbs — backflow protection required
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
Water Heater
R-10 under if electric
Seismic Restraint — 2 places
Pressure Relief Valve drain to exterior, terminate
6" —24" above ground
MECHANICAL
Boiler — manufacturer's installation instructions
shall be on-site at time of inspection
Whole House Fan — Integrated, heat exchanger
Source Specific Exhaust Fans @ bathroom (50cfin),
laundry room, (50 cfin) and kitchen (100 cfin)
Environmental air exhaust ducting (with backdraft
dampers), insulation (R-4) and terminus (3' from
openings into building)
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
J
0-
RFQITIRFD
INSPEC'TIQNS
Building Permit #03-128R-1
APPROVED/DATE
FRAMING
:: yr ...tntz_ f s r- e.,
Walls
Beams - per architectural design
Roof
Living roof details -per architectural design
Rafter positive connection
Attic venting — ridge & eave
Posts, beams and headers
Windows — escape
Windows — safety glazing
Window U -factor - 0.40 or better
Door U -factor — 0.20 or better
Skylight U -factor — 0.58 or better
NFRC sticker must be on windows, doors &
skylights at time of inspection
Air Seal
Fresh Air Intake
Fireblocking
Weather Resistive Barrier
INSULATION
Floor (R-30 )
Walls (R-21)
Ceiling (R-30 )
Baffles
Vapor Barrier —paint
DRYWALL NAILING
Walls
Gypsum board clips
Ceiling
FINAL
Public Works Sign -off
Living roof details
LPG
House Numbers — 5" numbers
Plumbing
Mechanical/Heating
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Stairs, Decks & Landings
Final - Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Building Permit #03-128R-1
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re -inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works approval
must be received prior to scheduling the Building Department's final inspection
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for a non-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval RKj2r to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: 360-379-5086 Fax 360-385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD03-128R-2 Issued: 07/16/03 Parcel Number: 931 400 604
Job Address: 627 Redwood Zoning: R -H
Nature of Work: Revision 2; Construct PhotoVoltaic Panel Array
Owner: Sakura O. Davis
Contractor: Owner
GENERAL CONDITIONS APPLY: See last page
SEPARATE PERMITS REQUIRED:
Electrical Permit — Contact WA State Dept. of Labor & Industries 360-417-2702
W "ITIPFII1NQPFCT1ONQ
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks
Verify footing dimensions prior to pour
POLE FOOTINGS —per architectural details
Concrete — verify compressive strength per design;
using slow -curing concrete; brace or strap pole only
until concrete reaches strength
FRAMING/FINAL
Positive Connections
Straps
Thru-bolts
Final — building
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page I of 2
Building Permit #03-128R-2
GENERAL CONDITIONS
1. Contractors working project on this 'ect are required to have a Labor & Industries •
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re -inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call .
385-2294. A minimum of twenty-four hours notice is required. Public Works approval
must be received prior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for a non-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you di for utility line locates
Y g tY
1-800-424-5555
Page 2 of 2
.7
•
•
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: 360-379-5086 Fax360-385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD03-128R-3House Issued: 09/10/03 Parcel Number: 931 400 604
Job Address: 627 Redwood Zoning: R -H
Nature of Work: Revision 3: (1) Change PV array from augered pile to slab footing; (2)
change ridge beams from steel to laminated beams & post framing; (iV, house and studio; (3)
chann2e comp roofing to metal (a) house and studio
Owner: Sakura O. Davis
Contractor: Owner
GENERAL CONDITIONS APPLY: See last page
SEPARATE PERMITS REQUIRED:
Electrical Permit — Contact WA State Dept. of Labor & Industries 360-417-2702
REQUIRED INSPECTIONS
APPROVEDIDATF.
See also original inspection record for required
inspections
FRAMING
Ridge Beam — 63/4" x 15" GLB
Headers @ F-2
6" x 12" DF#1 @ bedroom plant shelf
6" x 8" DF#1 @ stair landing
(3)2"x6"post
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 2
Building Permit #03-128R-3
GENERAL CONDITIONS
1. Contractors workingthis project on p o�ect are required to have a Labor &Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re -inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required Public Works approval
must be received prior to scheduling the Building Department's final inspection
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for a non-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval 2ri2r to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
•
r�
Waterman & Katz Building
181 Quincy Street, Suite 301
PortTownsend, WA 98368
Phone: 360-379-5086 Fax360-385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD03-128R-3PVA Issued: 09/10/03 Parcel Number: 931 400 604
Job Address: 627 Redwood Zoning: R -H
Nature of Work: Revision 3: (1) Change PV array from augered pile to slab footing; (2)
change ridge beams from steel to laminated beams & post framing (a, house and studio; (3)
change comp roofing to metal ar, house and studio
Owner: Sakura O. Davis
Contractor: Owner
GENERAL CONDITIONS APPLY: See last page
SEPARATE PERMITS REQUIRED:
Electrical Permit — Contact WA State Dept. of Labor & Industries 360-417-2702
REQUIRED INSPECTIONS
See also original inspection record for required
inspections
FOOTINGS - PVA
Setbacks
4' x 4' x 12" footing
Reinforcement — (4) #4s each way
Concrete plinth — 15" x 15" x 18"
Reinforcement — (4) #4s vertical
POLE CONNECTION
1" x 1" x 5/8" plate
(4) 5/8" anchor bolts with nuts
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 2
Building Permit #03-128R-3
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re -inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is reguired Public Works approval
must be received prior to scheduling the Building Department's final inspection
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for a non-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval Rliff to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
i
i
•
•
•
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: 360-379-5086 Fax 360-385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD03-128R-3Studio Issued: 09/10/03 Parcel Number: 931 400 604
Job Address: 627 Redwood Zoning: R -H
Nature of Work: Revision 3: (1) Change PV array from augered pile to slab footing; (2)
change ridge beams from steel to laminated beams & post framing na house and studio; (3)
change comp roofing to metal (a), house and studio
Owner: Sakura O. Davis
Contractor: Owner
GENERAL CONDITIONS APPLY: See last page
SEPARATE PERMITS REQUIRED:
Electrical Permit — Contact WA State Dept. of Labor & Industries 360-417-2702
REQUIRED INSPECTIONS
APPR"VFDMATF
See also original inspection record for required
inspections
FRAMING
Ridge Beam — 3 1/2" x 11.875" VLB
Headers @ Studio Loft
6" x 12" DF#1 @ window seat
6" x 12" DF#2 @ opposite window
(3) 2" x 6" post
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 2
Building Permit #03-128R-3
GENERAL CONDITIONS
1. Contractors workingthis project are
on p ro� required to have a Labor &Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re -inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call 10
385-2294. A minimum of twenty-four hours notice is required Public Works approval
must be received prior to scheduling the Building Department's final inspection
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for a non-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval Uriff to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
•
F--I
LJ
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: 360-379-5086 Fax 360-385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD03-128R-4House Issued: 12/04/03 Parcel Number:931400 604
Job Address: 627 Redwood Zoning: R -II Type: V -N Occupancy: RR=3
Total Occupant Load: 3/1 Nature of Work: Change WSEC compliance to systems
analysis with use of icynene insulation
Owner: Sakura O. Davis
Contractor: Owner
GENERAL CONDITIONS APPLY: See last page
SEPARATE PERMITS REQUIRED:
Electrical Permit — Contact WA State Dept. of Labor & Industries 360-417-2702
RFnITIRF.D INCPVVT'FnNC
A V1D1D"X71Vn/n A rVU
See also original inspection record
FRAMING
NOTE. Systems Analysis for compliance with WA
State Energy Code for use of Icynene Insulation
Window U -factor - 0.36 or better
Door U -factor — 0.40 or better
NFRC sticker must be on windows and doors at
time of inspection
INSULATION
Floor (R-19 icynene )
Walls (R-19 icynene)
Ceiling (R-19 icynene in vault; R-19 blown in attic )
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 2
Building Permit #03-128R4house
•
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections. 0
5. Re -inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works approval
must be received prior to scheduling the Building Department's final inspection
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for a non-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
•
•
•
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: 360-379-5086 Fax 360-385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD03-128R-4Studio Issued: 12/04/03 Parcel Number:931400 604
Job Address: 627 Redwood Zoning: R -II Type: V -N Occupancy: RR=3
Total Occupant Load: 3/1 Nature of Work: Change WSEC compliance to systems
analysis with use of icvnene insulation
Owner: Sakura O. Davis
Contractor: Owner
GENERAL CONDITIONS APPLY: See last page
SEPARATE PERMITS REQUIRED•
Electrical Permit — Contact WA State Dept. of Labor & Industries 360-417-2702
REOUIRED 1NSPFCTF0NC
A DDD nvTi it m A rrr,
-- - - -' -
See also original inspection record
Al 1 1\V V JU "Luty j F -j
FRAMING
NOTE. Systems Analysis for compliance with WA
State Energy Code for use of Icynene Insulation
Window U -factor - 0.36 or better
Door U -factor — 0.40 or better
NFRC sticker must be on windows and doors at
time of inspection
INSULATION
Floor (R-19 is nene )
Walls (R-19 is nene)
Ceiling (R-19 icvnene in vault)
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 2
Building Permit #03-128R4studio
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections. is
5. Re -inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works approval
must be received prior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for a non-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
City of Port Townsend
Development Services Department
Waterman & 'Katz Building�'�'� w+
181 Quincy Street - CITY HALL
Port Townsend, WA 98368 1891
(360) 379-3208 Fax: (360) 385-7576
Owner:
Address:
Location:
Building (or portion):
Use(s) permitted:
CERTIFICATE OF OCCUPANCY
BLD03-128
Sakura Davis
627 Redwood Street
Port Townsend, WA 98368
Single Family Residence
R-3
The above -referenced building or portion complies with the applicable requirements of the Port
Townsend Building Code (PTMC 16.04), has passed all required inspections and may be used
and occupied in the use and manner indicated above.
This certificate of occupancy shall be posted in a conspicuous place on the premises and shall not
be removed except by the Building Official.
Approved: Suzanne Wassmer September 21 2004
Permit Technician Date
•