Loading...
HomeMy WebLinkAboutBLD03-1280 Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone:36O-379-5086 Fax 360-385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-128 Issued: 07/16/03 Parcel Number: 931 400 604 Job Address: 627 Redwood Zoning: R -II Total Occupant Load: 3/1 Owner: Sakura O. Davis Type: V -N Occupancy: RR=3 Nature of Work: Construct Single-family Dwelling with attached garage & rainwater collectors Contractor: Owner GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REQUIRED: Electrical Permit — Contact WA State Dept. of Labor & Industries 360-417-2702 DTi'l17T77?Ti'Tl 7NCDTi f''T7l1NC A PPR OVFD/n A TF, TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS —per architectural details Setbacks Footings Rainwater Collector Footings Forms Reinforcement —per architectural design Interior Footings Y, Porch Piers s -, _ 3 Deck LIFER FOUNDATION —per architectural detail; all elements require inspection prior to cover Stem Wall - 'c / - 77 Forms Reinforcement —per architectural design Anchor Bolts & Washers —per architectural design Post to Foundation Wall Positive Connection Engineered Holdowns -per architectural design CALL 48 hours before you dig for Utility line locates 1-800424-5555 Page 1 of 4 REQUIRED INSPECTIONS s Building Permit #03-128 APPROVED/DATF, FLOOR FRAMING NOTE: Engineered BCI floor plan on-site and available to the Inspector at inspection time Joists Blocking Positive Connections Treated Wood to Concrete Anchor Bolts & Washers AiPA�tt5- 4;L4tz, oiCLe'q1111o13 PLUMBING-�DUS>✓' t( 03 illeating system design to be submitted prior to __7 inspection `7 Rough -In (D -V -T & Clean outs) ✓ Water Supply Zz Water Hammer Arrestors Gas Supply 1r / ose Bibbs —bac flow protectio --------______--- Insu ation R�° Pressure Reduction Valve if > 80 psi Water Heater R-10 under if electric Seismic Restraint — 2 places Pressure Relief Valve drain to exterior, terminate 6" —24" above ground MECHANICAL Boiler — manufacturer's installation instructions shall be on-site at time of inspection Whole House Fan — Integrated, heat exchanger Source Specific Exhaust Fans @ bathroom (50cfm), laundry room, (50 cfm) and kitchen (100 cfm) Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 '7 0 • f�, RF(IITIRFD INSPECTIONS Building Permit #03-128 APPROVED/DATE - FRAMING -- -- - - -- �._T,. "°-'_ CS t NOTE. Engineered BCI&loon & roof plan on-site and available to the Inspector at inspection time Walls Beams - per architectural design Roof BCI rafter positive connection Attic venting - ridge & eave Posts, beams and headers Windows - escape Windows - safety glazing Window U -factor - 0.40 or better Door U -factor - 0.20 or better Skylight U -factor - 0.58 or better NFRC sticker must be on windows, doors & skylights at time of inspection Air Seal Fresh Air Intake - integrated Fireblocking Weather Resistive Barrier INSULATION Floor (R-30 ) Walls (R-21) Ceiling (R-30 ) Baffles Vapor Barrier -paint DRYWALL NAILING Walls Gypsum board clips Ceiling Garage House Occupancy Separation FINAL Water storage fastening -per architectural design Public Works Sign -off LPG House Numbers - 5" numbers Plumbing - Solar Mechanical/Heating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Stairs, Decks & Landings Final - Building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Building Permit #03-128 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re -inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval gLj2K to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4 0 • Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: 360-379-5086 Fix 360-385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-128R-1 Issued: 07/16/03 Parcel Number: 931 400 604 Job Address: 627 Redwood Zoning: R -II Type: V -N Occupancy: R=3 Total Occupant Load: 2 Nature of Work: Revision 1: Construct Studio Owner: Sakura O. Davis Contractor: Owner GENERAL CONDITIONS APPLY: See last pate SEPARATE PERMITS REQUIRED: Electrical Permit — Contact WA State Dept. of Labor & Industries 360-417-2702 DUi n11T77?Ui'n 7NQ1D1 d"9P11 1VQ APPR nvFD/D ATF TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS —per architectural details Setbacks Footings Forms Reinforcement —per architectural design Porch Piers Deck v FOUNDATION —per architectural detail; all elements require inspection prior to cover Stem Wall Forms Reinforcement —per architectural design AnchorBolts & Washers _- per architectural design —Post to_ Foundation Wall Positive Connection Engineered Holdowns CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 4 Building Permit #03-128R-1 REQUIRED INSPECTIONS APPROVED/DATE FLOOR FRAMING NOTE: Engineered BCI floor plan on-site and available to the Inspector at inspection time Hydronic Heat Tubing Joists Blocking Positive Connections Treated Wood to Concrete Anchor Bolts & Washers PLUMBING Rough -In (D -V -T & Clean outs) Water Supply Water Hammer Arrestors Gas Supply Hose Bibbs — backflow protection required Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater R-10 under if electric Seismic Restraint — 2 places Pressure Relief Valve drain to exterior, terminate 6" —24" above ground MECHANICAL Boiler — manufacturer's installation instructions shall be on-site at time of inspection Whole House Fan — Integrated, heat exchanger Source Specific Exhaust Fans @ bathroom (50cfin), laundry room, (50 cfin) and kitchen (100 cfin) Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 J 0- RFQITIRFD INSPEC'TIQNS Building Permit #03-128R-1 APPROVED/DATE FRAMING :: yr ...tntz_ f s r- e., Walls Beams - per architectural design Roof Living roof details -per architectural design Rafter positive connection Attic venting — ridge & eave Posts, beams and headers Windows — escape Windows — safety glazing Window U -factor - 0.40 or better Door U -factor — 0.20 or better Skylight U -factor — 0.58 or better NFRC sticker must be on windows, doors & skylights at time of inspection Air Seal Fresh Air Intake Fireblocking Weather Resistive Barrier INSULATION Floor (R-30 ) Walls (R-21) Ceiling (R-30 ) Baffles Vapor Barrier —paint DRYWALL NAILING Walls Gypsum board clips Ceiling FINAL Public Works Sign -off Living roof details LPG House Numbers — 5" numbers Plumbing Mechanical/Heating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Stairs, Decks & Landings Final - Building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Building Permit #03-128R-1 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re -inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval RKj2r to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4 Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: 360-379-5086 Fax 360-385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-128R-2 Issued: 07/16/03 Parcel Number: 931 400 604 Job Address: 627 Redwood Zoning: R -H Nature of Work: Revision 2; Construct PhotoVoltaic Panel Array Owner: Sakura O. Davis Contractor: Owner GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REQUIRED: Electrical Permit — Contact WA State Dept. of Labor & Industries 360-417-2702 W "ITIPFII1NQPFCT1ONQ APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks Verify footing dimensions prior to pour POLE FOOTINGS —per architectural details Concrete — verify compressive strength per design; using slow -curing concrete; brace or strap pole only until concrete reaches strength FRAMING/FINAL Positive Connections Straps Thru-bolts Final — building CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page I of 2 Building Permit #03-128R-2 GENERAL CONDITIONS 1. Contractors working project on this 'ect are required to have a Labor & Industries • contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re -inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call . 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you di for utility line locates Y g tY 1-800-424-5555 Page 2 of 2 .7 • • Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: 360-379-5086 Fax360-385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-128R-3House Issued: 09/10/03 Parcel Number: 931 400 604 Job Address: 627 Redwood Zoning: R -H Nature of Work: Revision 3: (1) Change PV array from augered pile to slab footing; (2) change ridge beams from steel to laminated beams & post framing; (iV, house and studio; (3) chann2e comp roofing to metal (a) house and studio Owner: Sakura O. Davis Contractor: Owner GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REQUIRED: Electrical Permit — Contact WA State Dept. of Labor & Industries 360-417-2702 REQUIRED INSPECTIONS APPROVEDIDATF. See also original inspection record for required inspections FRAMING Ridge Beam — 63/4" x 15" GLB Headers @ F-2 6" x 12" DF#1 @ bedroom plant shelf 6" x 8" DF#1 @ stair landing (3)2"x6"post CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 2 Building Permit #03-128R-3 GENERAL CONDITIONS 1. Contractors workingthis project on p o�ect are required to have a Labor &Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re -inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduling the Building Department's final inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval 2ri2r to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 • r� Waterman & Katz Building 181 Quincy Street, Suite 301 PortTownsend, WA 98368 Phone: 360-379-5086 Fax360-385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-128R-3PVA Issued: 09/10/03 Parcel Number: 931 400 604 Job Address: 627 Redwood Zoning: R -H Nature of Work: Revision 3: (1) Change PV array from augered pile to slab footing; (2) change ridge beams from steel to laminated beams & post framing (a, house and studio; (3) change comp roofing to metal ar, house and studio Owner: Sakura O. Davis Contractor: Owner GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REQUIRED: Electrical Permit — Contact WA State Dept. of Labor & Industries 360-417-2702 REQUIRED INSPECTIONS See also original inspection record for required inspections FOOTINGS - PVA Setbacks 4' x 4' x 12" footing Reinforcement — (4) #4s each way Concrete plinth — 15" x 15" x 18" Reinforcement — (4) #4s vertical POLE CONNECTION 1" x 1" x 5/8" plate (4) 5/8" anchor bolts with nuts CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 2 Building Permit #03-128R-3 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re -inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is reguired Public Works approval must be received prior to scheduling the Building Department's final inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval Rliff to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 i i • • • Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: 360-379-5086 Fax 360-385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-128R-3Studio Issued: 09/10/03 Parcel Number: 931 400 604 Job Address: 627 Redwood Zoning: R -H Nature of Work: Revision 3: (1) Change PV array from augered pile to slab footing; (2) change ridge beams from steel to laminated beams & post framing na house and studio; (3) change comp roofing to metal (a), house and studio Owner: Sakura O. Davis Contractor: Owner GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REQUIRED: Electrical Permit — Contact WA State Dept. of Labor & Industries 360-417-2702 REQUIRED INSPECTIONS APPR"VFDMATF See also original inspection record for required inspections FRAMING Ridge Beam — 3 1/2" x 11.875" VLB Headers @ Studio Loft 6" x 12" DF#1 @ window seat 6" x 12" DF#2 @ opposite window (3) 2" x 6" post CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 2 Building Permit #03-128R-3 GENERAL CONDITIONS 1. Contractors workingthis project are on p ro� required to have a Labor &Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re -inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 10 385-2294. A minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduling the Building Department's final inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval Uriff to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 • F--I LJ Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: 360-379-5086 Fax 360-385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-128R-4House Issued: 12/04/03 Parcel Number:931400 604 Job Address: 627 Redwood Zoning: R -II Type: V -N Occupancy: RR=3 Total Occupant Load: 3/1 Nature of Work: Change WSEC compliance to systems analysis with use of icynene insulation Owner: Sakura O. Davis Contractor: Owner GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REQUIRED: Electrical Permit — Contact WA State Dept. of Labor & Industries 360-417-2702 RFnITIRF.D INCPVVT'FnNC A V1D1D"X71Vn/n A rVU See also original inspection record FRAMING NOTE. Systems Analysis for compliance with WA State Energy Code for use of Icynene Insulation Window U -factor - 0.36 or better Door U -factor — 0.40 or better NFRC sticker must be on windows and doors at time of inspection INSULATION Floor (R-19 icynene ) Walls (R-19 icynene) Ceiling (R-19 icynene in vault; R-19 blown in attic ) CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 2 Building Permit #03-128R4house • GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 0 5. Re -inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 • • • Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: 360-379-5086 Fax 360-385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-128R-4Studio Issued: 12/04/03 Parcel Number:931400 604 Job Address: 627 Redwood Zoning: R -II Type: V -N Occupancy: RR=3 Total Occupant Load: 3/1 Nature of Work: Change WSEC compliance to systems analysis with use of icvnene insulation Owner: Sakura O. Davis Contractor: Owner GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REQUIRED• Electrical Permit — Contact WA State Dept. of Labor & Industries 360-417-2702 REOUIRED 1NSPFCTF0NC A DDD nvTi it m A rrr, -- - - -' - See also original inspection record Al 1 1\V V JU "Luty j F -j FRAMING NOTE. Systems Analysis for compliance with WA State Energy Code for use of Icynene Insulation Window U -factor - 0.36 or better Door U -factor — 0.40 or better NFRC sticker must be on windows and doors at time of inspection INSULATION Floor (R-19 is nene ) Walls (R-19 is nene) Ceiling (R-19 icvnene in vault) CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 2 Building Permit #03-128R4studio GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. is 5. Re -inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 City of Port Townsend Development Services Department Waterman & 'Katz Building�'�'� w+ 181 Quincy Street - CITY HALL Port Townsend, WA 98368 1891 (360) 379-3208 Fax: (360) 385-7576 Owner: Address: Location: Building (or portion): Use(s) permitted: CERTIFICATE OF OCCUPANCY BLD03-128 Sakura Davis 627 Redwood Street Port Townsend, WA 98368 Single Family Residence R-3 The above -referenced building or portion complies with the applicable requirements of the Port Townsend Building Code (PTMC 16.04), has passed all required inspections and may be used and occupied in the use and manner indicated above. This certificate of occupancy shall be posted in a conspicuous place on the premises and shall not be removed except by the Building Official. Approved: Suzanne Wassmer September 21 2004 Permit Technician Date •