Loading...
HomeMy WebLinkAboutBLD03-127f Waterman & Katz Building 181 Quincy Street, State 301 Port Townsend, WA 98368 Phoce: 360-379-5086 Fax360-3857675 CITY OF PORT TOWNSEND • CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-127 Issued: 07/17/03 Parcel Number: 948 305 007 Job Address: 1247 Jackman Street Zoning: R-II Type: V-N Occupancy: R-3/U-1 Total Occupant Load: 7/1 Nature of Work: Construct Single-family Dwelling with attached garage Owner: Gav Dumenil Contractor: Owner GENERAL CONDITIONS APPLY: See Page 4 and 5 SEPARATE PERMITS REQUIRED: Electrical .Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 DL~l1TTTDT', 11 7NCDTi tt''TTf1NC • A PPR (1VF,17/n A TF, TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS r =-~-~ ,, ;,..~~, f.~., f--,~~_~~~>~l ~r~i tM~:' Setbacks =, ~~ , ._:: ,-~~,e~~, Footings - ~ , . ,.~ -t ~~r ~ G r'~c c~ ~'` z Forms 6 l.= Reinforcement -per architectural design (retaining ~f~~~ wall) Interio ootin Porch Piers ~-~"""'~~-- Deck LIFER - y ~;j f~~Y a ~~~4~~ G ~ i ~ ~ ~ FOUNDATION Stem Wall ,°" rf~'_` / = cam:-~.~- t- S'~Ca°' O. ~%" / Forms ~ C • f%` p~ Reinforcement ; • ;~ _ ~, __ Anchor Bolts & Washers 3 ~ = _ ~ ~~ Post to Foundation Wall Positive Connection Holdowns -per architectural design • CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 5 k. Building Permit #BLD03-127 REQUIRED INSPECTIONS APPROVF,D/DATE GROUNDWORK PLUMBING Pressure Test Pipe Joints Exposed Pipe Bedding SLAB Interior footings ~o~~ I i F s l d` #l~ ~a,~-~.~-._~.. ~ ~ ~, at ~. FLOOR FRAMING NOTE: E eereal~£ or plan on-sate avai a to the Inspector at inspection time _ dronic Heat Tubing Joists ~ ~ ~ v' Blocking ' Positive Connections ~. Treated Wood to Concrete Anchor Bolts & Washers Foundation Vents (5 required) Crawl Access PLUMBING Rough-In (D-V-T & Clean outs) Water Supply Water Hammer Arrestors Gas Supply Hose Bibbs - backflow protection required Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater R-10 under if electric Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, terminate 6" -24" above ground MECHANICAL Boiler -manufacturer's installation instructions shall be on-site at time of inspection Whole House Fan -Laundry Source Specific Exhaust Fans @ bathroom (SOcfin), laundry room, (50 cfin) and kitchen (100 cfin) Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from o enin s into buildin CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page Z of 5 • _J • .~ C RF.()TTTRF.T) TNSPF,('TTnNS Building Permit #BLD03-127 APPROVED/DATE FRAMING Floors NOTE: Engineered BCI floor plan on-site and available to the Inspector at inspection time Holdowns -per architectural design Walls Shear bracing- per architectural design Roof Trusses -Engineered truss plan on-site and available to the Inspector at inspection time Rafter positive connection Attic venting -ridge & eave Posts, beams and headers -per architectural design Attic Access Windows -escape Windows -safety glazing Window U-factor - 0.40 or better Door U-factor - 0.20 or better Skylight U-factor - 0.58 or better NFRC sticker must be on windows, doors & skylights at time of inspection Air Seal Fresh Air Intake Fireblocking Weather Resistive Barrier INSULATION Floor (R-30 ) Walls (R-21) Ceiling (R-30 vault, R - 38 truss ) Baffles Vapor Barrier -paint 6 mil black poly in crawl space DRYWALL NAILING Walls Ceiling CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 3 of 5 A . , Building Permit #BLD03-127 APPRO FINAL Public Works Sign-off LPG House Numbers - 5" numbers Plumbing Mechanical/Heating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Stairs, decks, & landings Building Final GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works aaproval must be received arior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. • CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 4 of 5 ~ . ~. Building Permit #BLD03-127 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 5 of 5 Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone:360-379-5086 Fax 360-385-7675 :~ • • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-127R-1 Issued: 11/19/03 Parcel Number: 948 305 007 Job Address: 1247 Jackman Street Zoning: R-II Type: V-N Occupancy: R-3/LT-1 Total Occupant Load: No Change Nature of Work: Revision #1: Add 68 sg. ft. to enlarge enclosed covered porch area Owner: Gay Dumenil Contractor: Owner GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 NOTE: See also original Hermit BLD03-127 for additional insyections REQUIRED INSPECTIONS APPROVED/DATE FOOTINGS Drill and Epoxy into existing Footing Refer to Detail for Footing reinforcement S/2.1 FOUNDATION Drill and Epoxy into existing Foundation wall Refer to Detail for Foundation wall reinforcement S/2.1 FLOOR SLAB 4" concrete slab with minimum #4 reinforcement at 16" o.c. FRAMING Revision of GLB at porch to 3-1/8"x10.5" GLB See Ori final Plans INSULATION See Original Plans PLUMBING - L p~fU ~,_r ~ 'r~-t ~~ ower level future fixture placement has been moved to the stairwell wall CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 2 Building Permit #BLD03-127R-1 GENERAL CONDITIONS 1, Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public • Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduling the Building Department's final inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval rior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 ,Page 2 of 2