HomeMy WebLinkAboutBLD03-127f Waterman & Katz Building
181 Quincy Street, State 301
Port Townsend, WA 98368
Phoce: 360-379-5086 Fax360-3857675
CITY OF PORT TOWNSEND
•
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-127 Issued: 07/17/03 Parcel Number: 948 305 007
Job Address: 1247 Jackman Street Zoning: R-II Type: V-N Occupancy: R-3/U-1
Total Occupant Load: 7/1 Nature of Work: Construct Single-family Dwelling
with attached garage
Owner: Gav Dumenil Contractor: Owner
GENERAL CONDITIONS APPLY: See Page 4 and 5
SEPARATE PERMITS REQUIRED:
Electrical .Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
DL~l1TTTDT', 11 7NCDTi tt''TTf1NC
•
A PPR (1VF,17/n A TF,
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS r =-~-~ ,, ;,..~~, f.~., f--,~~_~~~>~l ~r~i tM~:'
Setbacks =, ~~ , ._:: ,-~~,e~~,
Footings - ~ , . ,.~ -t ~~r ~
G r'~c c~ ~'` z
Forms 6 l.=
Reinforcement -per architectural design (retaining
~f~~~
wall)
Interio ootin
Porch Piers ~-~"""'~~--
Deck
LIFER - y ~;j f~~Y a ~~~4~~ G ~ i ~ ~ ~
FOUNDATION
Stem Wall
,°" rf~'_` / = cam:-~.~- t- S'~Ca°' O.
~%" /
Forms ~ C • f%` p~
Reinforcement ; • ;~
_ ~, __
Anchor Bolts & Washers 3
~ = _ ~ ~~
Post to Foundation Wall Positive Connection
Holdowns -per architectural design
• CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 5
k.
Building Permit #BLD03-127
REQUIRED INSPECTIONS APPROVF,D/DATE
GROUNDWORK PLUMBING
Pressure Test
Pipe Joints Exposed
Pipe Bedding
SLAB
Interior footings
~o~~ I i F s l d`
#l~ ~a,~-~.~-._~..
~
~
~,
at
~.
FLOOR FRAMING
NOTE: E eereal~£ or plan on-sate
avai a to the Inspector at inspection time _
dronic Heat Tubing
Joists ~ ~ ~ v'
Blocking '
Positive Connections ~.
Treated Wood to Concrete
Anchor Bolts & Washers
Foundation Vents (5 required)
Crawl Access
PLUMBING
Rough-In (D-V-T & Clean outs)
Water Supply
Water Hammer Arrestors
Gas Supply
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
R-10 under if electric
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground
MECHANICAL
Boiler -manufacturer's installation instructions
shall be on-site at time of inspection
Whole House Fan -Laundry
Source Specific Exhaust Fans @ bathroom (SOcfin),
laundry room, (50 cfin) and kitchen (100 cfin)
Environmental air exhaust ducting (with backdraft
dampers), insulation (R-4) and terminus (3' from
o enin s into buildin
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page Z of 5
•
_J
•
.~
C
RF.()TTTRF.T) TNSPF,('TTnNS
Building Permit #BLD03-127
APPROVED/DATE
FRAMING
Floors NOTE: Engineered BCI floor plan on-site
and available to the Inspector at inspection time
Holdowns -per architectural design
Walls
Shear bracing- per architectural design
Roof
Trusses -Engineered truss plan on-site and
available to the Inspector at inspection time
Rafter positive connection
Attic venting -ridge & eave
Posts, beams and headers -per architectural design
Attic Access
Windows -escape
Windows -safety glazing
Window U-factor - 0.40 or better
Door U-factor - 0.20 or better
Skylight U-factor - 0.58 or better
NFRC sticker must be on windows, doors &
skylights at time of inspection
Air Seal
Fresh Air Intake
Fireblocking
Weather Resistive Barrier
INSULATION
Floor (R-30 )
Walls (R-21)
Ceiling (R-30 vault, R - 38 truss )
Baffles
Vapor Barrier -paint
6 mil black poly in crawl space
DRYWALL NAILING
Walls
Ceiling
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 3 of 5
A
. ,
Building Permit #BLD03-127
APPRO
FINAL
Public Works Sign-off
LPG
House Numbers - 5" numbers
Plumbing
Mechanical/Heating
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Stairs, decks, & landings
Building Final
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's reeistration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works aaproval
must be received arior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
•
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 4 of 5
~ . ~.
Building Permit #BLD03-127
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 5 of 5
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone:360-379-5086 Fax 360-385-7675
:~
•
•
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-127R-1 Issued: 11/19/03 Parcel Number: 948 305 007
Job Address: 1247 Jackman Street Zoning: R-II Type: V-N Occupancy: R-3/LT-1
Total Occupant Load: No Change
Nature of Work: Revision #1: Add 68 sg. ft. to enlarge enclosed covered porch area
Owner: Gay Dumenil
Contractor: Owner
GENERAL CONDITIONS APPLY: See last page
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
NOTE: See also original Hermit BLD03-127 for additional insyections
REQUIRED INSPECTIONS APPROVED/DATE
FOOTINGS
Drill and Epoxy into existing Footing
Refer to Detail for Footing reinforcement S/2.1
FOUNDATION
Drill and Epoxy into existing Foundation wall
Refer to Detail for Foundation wall reinforcement S/2.1
FLOOR SLAB
4" concrete slab with minimum #4 reinforcement at 16" o.c.
FRAMING
Revision of GLB at porch to 3-1/8"x10.5" GLB
See Ori final Plans
INSULATION
See Original Plans
PLUMBING -
L p~fU ~,_r ~ 'r~-t ~~
ower level future fixture placement has been moved to the
stairwell wall
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 2
Building Permit #BLD03-127R-1
GENERAL CONDITIONS
1, Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public •
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required Public Works approval
must be received prior to scheduling the Building Department's final inspection
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval rior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
,Page 2 of 2