CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD03-124 Issued: 06/13/03
Job Address: 1629 Jefferson Street Zoning: R-II Type: V-N
Occupancy: R-3
Nature of Work: Enclose ezisting porch with insulated walls, install windows.
Owner: Jane Souzon
Contractor: Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact WA State Labor & Industries @ 360-417-2702
DTi'l1TTT72Ti Tl TNCpTi !''TT(11VC
Parcel Number: 989 706 405
APPRnVF>n/11ATF
FRAMING
Walls
Window U-factor - .40 or better ,%` .
i
Window Safety Glazing -safety glazing ~,
y =.~ ~~~'~ • y f ~ -
~
required in windows located within 24" l
~
rc of either edge of door
a
_ _..
_ _
-
_
m_____
~~Weathe~r~esistlve~ai-i-ler - ----- _____.__._ ________.. -
INSULATION
Walls - R-21 ~~~ I~ I Ida I0 ~ \; "~~~-,~i' l R~~l~
+, / /
DRYWALL NAILING
Walls
FINAL
Smoke Detectors (SD) -required throughout
per 1997 Uniform Building Code (UBC): one
in each sleeping room and in arealhallway
leading to each sleeping room with minimum
one SD on each floor; battery powered OK
Building Numbers -check @ final
Final -Building
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pemut #BLD03-124
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294. Measures shalt include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.