Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD03-123
~ ~~ } • Waterman & I{afz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone:360-379-5086 Fu360-385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-123 Issued: 07/03/03 Parcel Number: 968 500 021 Job Address: 4150 Holcomb St. Zoning: R-II (PUD) Type: V-N Occupancy: RR=3 Total Occupant Load: 5/2 Nature of Work: Construct Single-family Dwelling with attached garage Owner: Robert & Rian Hossack Contractor: Tucker Construction TUCKEC*063N3 GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 12 Ti (1TTTRFTI TNCPF.f TT()NC A PPR (1VF,n/n A TF, TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS ~ ~ 11....x. Setbacks ~ , Footings ~~ ~ Forms ~ ,~ ~~ Reinforcement ~~ ~ erior Footin '1 ` orch footings LIFER ---.. __ FOUNDATION Stem Wall (~ ~~ ^'~ ~ Forms t i f R / ~ ~ ~"' ~ ~ ~' orcemen e n Anchor Bolts & W ashers ,.. ~ ~ ~ ~ ~ ~ Post to Foundation Wall Positive Connection Holdowns CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 4 Building Permit #03-123 w ~! ~ V~D6R,Sl.1AP~ ~c.uvn~ RE UIRED INSPECTIONS ©,~ ~-r BIZ s(Q3 APPROVED/DATE FLOOR FRAMING NOTE: Engineered BCI floor plan on-site and available to the Inspector at inspection time Joists Blocking Positive Connections Treated Wood to Concrete Anchor Bolts & Washers PLUMBING ~ I ~~Co~d zI Rough-In (D-V-T & Clean outs) Wat u 1 Water Hammer Arrestors LPG Gas Supply Hose Bibbs -back fired Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater R-10 under if electric Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, terminate 6" -24" above ground MECHANICAL ~.lt~-- ~,,G-~-~ p ~ p ~ ~ LPG Furnace - provide specs on-site ' r~cEa~2au~In4A~S Prp~- ~~ ~~1b3 Manufacturer s. installation instructions to be on-site @ time of inspection. Source Specific Exhaust Fans @ bathrooms (SOcfin), laundry room, (50 cfin) and kitchen (100 cfin) Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from openings) Whole house fan -hall/utility Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 ~- REQUIRED INSPECTIONS Bui]ding Permit #03-123 APPROVED/DATE FRAMING Walls Shear walls Shear Panel Blocking Roof- Engineered truss plan to be on site at inspection Attic venting -ridge & eave Posts, beams and headers Windows -escape Windows -safety glazing Window U-factor - 0.40 or better Door U-factor - 0.20 or better Skylight U-factor - 0.58 or better NFRC sticker must be on windows, doors & skylights at time of inspection Air Seal Fresh Air Intake -window ports Fireblocking Weather Resistive Barrier INSULATION 4_ Floor (R-30) - __ _ _-- - ___ -- _-- - _ __ _ ,. "~ ,~ .. f Walls (R-21) - _~ ;, ` J , __ , --- r' Ceilin 38 ~ ., _ g~-) _ _ _ _ , __ _ __.. _- .. . , _. -- Baffles -' ;,~ -,_- ,,.. ~ , ;~ Vapor Bamer -paint _. --- _ . _ _________ ______~~ DRYWALL NAILING ,,, " Walls Ceiling ~, , /~ ~'~-~Z `~- ~ Garage House Occupancy Separation ` FINAL Public Works Sign-off ,~ , ~ y House Numbers - 5" numbers ~ ~' `~~ Plumbing ~. LPG MechanicaUHeating `~` Insulation Certificate ~ Vapor Bamer Paint Certificate Smoke Detectors ..~ ~~ - ;' Stairs, Decks & Landings `' Final -building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Building Permit #03-123 ~ ~ _ GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. Z. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4