Loading...
HomeMy WebLinkAboutBLD03-122Waterman & Katz Building 181 Quincy Street, Suite 301 ~ Port Townsend, WA 98368 ~ Phone: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD~3-122 Issued: 06/13/03 Parcel Number: 988 800 106 Job Address: 739 Taylor Street Zoning: R-II Type: V-N Occupancy: R-3 Nature of Work: Install partial perimeter foundation and interior footings under ezisting residence, demolish concrete porch and steps and replace with wood porch, steps and railing. Occupant Load: No Change Owner: Bryan Saul Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE RF(1TTTRF.n TN4PFCT><(lN4 APPRnVF.D/DATF DEMOLITION Materials from demolition shall be transported to and disposed of in off-site location meeting all qualiftcations as set forth in state and local law. FOOTINGS -per engineering Setbacks '- ` ~ ~ Forms ~ ~~ ~~ ~ G Perimeter Footings -see Detail A Sheet 4 of 4 ~ ` `~ ~, 1 ~` ~~: ~ ' '` ~' Interior footings - 2' x 2' x 10" w/(3) #4 bars each wa y ~ __ ~ _ _ _,__ __ _ __ Porch footings - 2' x 2' x 10" w/(3) #4 bars each way y ~~ ' ~ x ~. ,' ~ ~ ~ il~~ _ 15ostBase -~~ Treated Wood to Concrete _. `" ] ? (~ `` ~ ''~ 1 .. ry Gt ,. ~ .. k~ Y r- FOUNDATION Cripple Wall T _ ~ ~~> ,~ f / ,~ ~ ~ --~~_ ;~4~,` ~ ~ ~ Anchor Bolts w/ 2" x 2" x 3/16" s u rs Vents - required __._. Crawl space access Girder (if applicable) Positive Connections Post - DF#2 6 x 6 6 mil black poly • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 Pemvt # BLD03-122 ~ REQUIRED INSPECTIONS APPRnVFn/>nATF FLOOR FRAMING All framing members exposed to weather to be pressure treated wood or of natural resistance to decay Posts Z~ -0~ Ledger ~, Joists - P.T. 2 x 6 @ 16" o.c. ~ ~' ~ Blocking Positive Connections ,. Treated Wood to Concrete FRAMING/FINAL -Framing and final inspections may be done at the same time if all elements of construction are available for inspection Engineered Porch Header 4 x 8 DF#2 above with min HF#2 Q ~a ~ f ~3 ` Rafter Positive Connection Rafters- 2 x 4 HF#2 Blocking ei _ __ Guardrails . Handrails Steps House Numbers -check for 5" numbers Smoke Detectors throughout existing house per 1997 UBC Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 1 :7 • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 Pemvt # BLD03-122 ,5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Call 48 hours before ou di for utilit line locates Y g Y 1-800-424-5555 Page 3 of 3 a