HomeMy WebLinkAboutBLD03-122Waterman & Katz Building
181 Quincy Street, Suite 301
~ Port Townsend, WA 98368
~ Phone: (360)379-3208 Fax: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD~3-122 Issued: 06/13/03 Parcel Number: 988 800 106
Job Address: 739 Taylor Street Zoning: R-II Type: V-N Occupancy: R-3
Nature of Work: Install partial perimeter foundation and interior footings under ezisting residence,
demolish concrete porch and steps and replace with wood porch, steps and railing.
Occupant Load: No Change
Owner: Bryan Saul Contractor: Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF(1TTTRF.n TN4PFCT><(lN4 APPRnVF.D/DATF
DEMOLITION
Materials from demolition shall be transported to and
disposed of in off-site location meeting all qualiftcations
as set forth in state and local law.
FOOTINGS -per engineering
Setbacks '- `
~ ~
Forms ~ ~~ ~~
~ G
Perimeter Footings -see Detail A Sheet 4 of 4 ~ ` `~ ~, 1 ~` ~~: ~ ' '` ~'
Interior footings - 2' x 2' x 10" w/(3) #4 bars each wa
y ~
__ ~ _ _ _,__ __
_
__
Porch footings - 2' x 2' x 10" w/(3) #4 bars each way y
~~
' ~ x ~. ,' ~ ~ ~ il~~ _
15ostBase -~~
Treated Wood to Concrete _. `" ] ? (~ `` ~ ''~
1 .. ry Gt
,. ~ ..
k~
Y r-
FOUNDATION
Cripple Wall T _ ~ ~~> ,~ f / ,~
~ ~ --~~_ ;~4~,` ~ ~ ~
Anchor Bolts w/ 2" x 2" x 3/16" s u rs
Vents - required __._.
Crawl space access
Girder (if applicable)
Positive Connections
Post - DF#2 6 x 6
6 mil black poly
• Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
Pemvt # BLD03-122 ~
REQUIRED INSPECTIONS APPRnVFn/>nATF
FLOOR FRAMING All framing members exposed to
weather to be pressure treated wood or of natural
resistance to decay
Posts
Z~ -0~
Ledger ~,
Joists - P.T. 2 x 6 @ 16" o.c.
~ ~'
~
Blocking
Positive Connections ,.
Treated Wood to Concrete
FRAMING/FINAL -Framing and final inspections
may be done at the same time if all elements of
construction are available for inspection
Engineered Porch Header 4 x 8 DF#2 above with min
HF#2
Q ~a ~ f ~3
`
Rafter Positive Connection
Rafters- 2 x 4 HF#2
Blocking
ei
_
__
Guardrails .
Handrails
Steps
House Numbers -check for 5" numbers
Smoke Detectors throughout existing house per 1997
UBC
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
1
:7
•
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
Pemvt # BLD03-122
,5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the
Building Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Call 48 hours before ou di for utilit line locates
Y g Y
1-800-424-5555
Page 3 of 3
a