HomeMy WebLinkAboutBLD03-120Waterman 8c Katz Building
181 Quincy Street, Suite 30]
Port Townsend, WA 98368
Phone:360-379-3208 Fax 360-385-7675
•
•
•
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD '
'I THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD03-12~ Issued: 05/30/03 Parcel Number: 948 303 001
Job Address: 1235 Landes Street Zoning: R-III Construction Type: V-N
Occupancy: R-I Total Occupant Load: NC Use of Building: Claridge Court Apartments
Nature of Work: Unit 122: replace gvpcrete with plywood underlayment, install new floor
and window coverings.
Owner: Quantum Management Systems
Contractor: Discovery Bay Construction - DI5COBC090B9
SEPARATE PERMITS REQUIItED:
Electrical -Contact Labor and Industries @ 417-2702
GENERAL CONDITIONS APPLY -SEE LAST PAGE
NOTE: Permit Revision required for work beyond the attached scope of work e.g.,
repair/replacement of structural floor members
APPROVED/DATE
DEMOLITION
Materials from demolition shall be transported to
and disposed of in off-site location meeting all
qualifications as set forth in state and local law.
FLOOR FRAMING /FINAL `y,%
Underlayment _ - ~-_ ~ __
RE UIRED INSPECTIONS
Call 48 hours before you dig for Utility line locates
1-800 424-5555
Page 1 of 2
Pemut # BLD03-120
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
Contractor's Registration Number and a City Business License. Failure to provide proof of
this documentation PRIOR to work may result in job shutdown while this is accomplished.
2. TESC -Temporary erosion and sediment control measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include installation of
silt fencing and graveled construction entrance (see attached details). Soils exposed during
construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc., once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All engineered elements including sheathing, nailing, holdowns, ABWP's (alternate braced
wall panels), etc., requires inspection PRIOR to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after Inspection Report corrections are completed.
6. The Building Department is unable to pass Final Inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of 24 hours notice is reauired. Public Works approval must be received
prior to scheduling the Building Department's Final Inspection or issuing a Temporary
Certificate of Occupancy.
7. Final Inspection and Certificate of Occupancy (nonresidential only) required PRIOR to
occupancy.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
~:
Ca1148 hours before you dig for Utility line locates
1-800 424-5555
Page 2 of 2