CITY OF PORT TOWNSEND
Permit Number: BLD03-119 Issued: 06/13/03 Parcel Number: 989 705 803
Job Address: 314 Polk Street Zoning: R-II Type: V-N Occupancy: RR=3
Total Occupant Load: No Change Nature of Work: Residential Kitchen Remodel
Owner: Bob Maeuire Contractor: Cram Johnson - CRAIGJC992N2
(379-8594)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF.O11IRF.n IN~PF,C.TinNS
APPRnVED/nATF
DEMOLITION
Materials from demolition shall be deposited in areas off-
site meeting all requirements of state and local law
PLUMBING
Rough-In (D-V-T & Clean Outs) ~__ ~,
'
Water Supply '~ -
Gas Supply ~~ ; r, ,
`
Water Hammer Arrestor @ dishwasher ~`) r`~ : -._
~~~'
`
Pipe Insulation (R-3) ' _
Pressure Reduction Valve if > 80 psi i` ~ ` ~. -'
,,
MECHANICAL
Kitchen Fan - 100 CFM ~
LPG Range
Environmental Air Exhaust ducting (with backdraft ~~
damper), insulation (R-4) and terminus (located 3'
from openings)
~r1-' 0~
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
Building Pernut #BLD03-119
RE UIRED INSPECTIONS APPROVED/DATE
FRAMING:
Window U-Factor - .40 or better
~~~
Skylight U-Factor - .58 or better
~
Air Seal ~
~
Fire Blocking
Headers -engineering may be required once roof t t ~ .3
diaphragm is opened and existing plumbing exposed
INSULATION
Fill Exposed Cavities as needed
7~1/„l~
3
`7
DRY WALL NAILING
Walls ~/~? 1p3
Ceiling `
FINAL
House Numbers -check for S" numbers
LPG "'~ -~.,~ c~ -~,s~, 4~~. ~~ G ~ I ~/~~
a~~~ 1
Plumbing 1
Mechanical
,
Vapor Barrier Paint Certificate (if applicable) ~
-~
Insulation Certificate (if applicable)
Smoke Detectors throughout existing construction: one in
each sleeping room and in each area/halhvay leading to ~' --
sleeping rooms with a minimum of one on each floor
Final -Building t
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2.. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include installation of
silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way
shall be kept free of dirt debris. Soils exposed during construction shall be temporarily
stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with
seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for
protection of adjacent properties..
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
~_
•
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
Building Permit #BLD03-119
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
~•
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294.
A minimum of twenty-four hours notice is required. Public Works approval must be received
prior to schedulin>= the Buildin>; Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
non-residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year
to keep your building permit active.
9. Revisions require review and approval by the Building Department. Contact them at 379-5086
prior to making changes in the field.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 3
r~
•
City of Port Townsend
Waterman & Katz Building
181 Quincy Street,Suite 301
PortTownsend, WA 98368
(360) 379-3208 Fax (360) 385-7675
CITY OF PORT TOV~JNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-119R-1 Issued: 08/12/03 Parcel Number: 989 705 803
Job Address: 314 Polk Street Zoning: R-II Type: V-N Occupancy: R=3
Total Occupant Load: No Chansie
Nature of Work: Revision #1: replace fixtures and refurbish bathroom and laundry room
Owner: Bob MaEUire Contractor: Craig Johnson - CRAIGJC992N2
(379-8594)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: see Original Permit BLD03-119 for other inspections.
RE UIRED INSPECTIONS
APPROVED/DATE
DEMOLITION
Materials from demolition shall be deposited in areas off-
site meeting all requirements of state and local law
PLUMBING
~
'
'
Rough-In (D-V-T & Clean Outs) ,, f ~
~
,
..~
Water Supply
i ~
~., -
. ~..,
1
;~
~
~
P
pe Insulation (R-3) ,
: -
Pressure Reduction Valve if > 80 psi ./~
Water Hammer Arrestor at clothes washer ~ <:~ 4 `' _1 ~'
MECHANICAL
Source Specific Exhaust Fans @ laundry room and ~ '~
bathroom (50 cfm), if installing new(room uses are
existing)
Environmental Air Exhaust ducting (with backdraft
~.~~ C~,
damper), insulation (R-4) and terminus (3' from
openings into building) (~ ~ ~_ > G ;~
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Building Permit #BLD03-119R-1
RE UIRED INSPECTIONS APPROVEDlDATE
FINAL /
Final -Building ~ ~ ~'~ ~
~ ~~
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment. control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include installation of
silt fencing and graveled lconstruction entrance (see attached details). Adjacent rights-of--way
shall be kept free of dirt debris. Soils exposed during construction shall be temporarily
stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with
seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for
protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294.
A minimum of twenty-four hours notice is required. Public Works approval must be received
prior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
non-residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections
are done. by the Building Department within one year. Call for at least one inspection per year
to keep your building permit active.
9. Revisions require review and approval by the Building Department. Contact them at 379-5086
prior to making changes in the field.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 2