CITY OF PORT TOWNSEND
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360)344-3057 Fax: (360)385-7675
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-118 Issued: 11/10/03 Parcel Number: 974 101201
Job Address: 807 Reed Street Zoning: P-I Type: V-N Occupancy: SS=2
Nature of Work: Construct Hvdro-uneumatic Tank Building Occupant Load: N/A
Owner: City of Port Townsend Public Works Contractor: Waltenbau~h Construction Inc.
WALTE00012BA
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor and Industries @ 360-417-2702
NOTE: Special Inspection is required for concrete and bolts embedded in concrete, per the engineers
structural notes, Sheet S-1 ofplans. Special Inspector shall be ICBO certified in their specific field and
listed in the current edition of WABO Agency and Inspector Register or present credentials to the
Building Department rior to performing inspections. Required Special Inspection Reports shall indicate
compliance with the plans and specifications and shall be copied to the Building Department in a timely
manner. Permit Holder or Permit Holder's Agent shall review and oversee correction of any and all
deficiencies noted by required special inspections.
**Hours of construction are limited to 7 a.m. - 6 p.m. Monday-Friday**
RE UIRED INSPECTIONS
•
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL -
Erosion control measures to be installed during construction per
the attached details
SLAB FOUNDATION -special inspection required for high ~ !~ ~~ ~ 3 j
strength concrete t ~, ~,
Setbacks: front (Reed Street) 20'; sides and rear 10'
Forms
Slab Insulation -see detail 4, sheet S8/8
Reinforcement -grade 60 steel
UFER
Anchor Bolts - S/8 " @ 32 " o. c. per shear wall schedule;
wetsticking of anchor bolts prohibited
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
,,. .-
Pernut # BLD03-118
REQUIRED INSPF(~TInN~ spnunv~nm~m~
- - -
MECHANICAL • .LJL/ i/tai 1'J
Exhaust and Supply Fans and Terminus
Intake and Exhaust Louvers w/ backdraft dampers
FRAMING -All welding to be done by certified
Welders
Walls
Shear Wall sheathin and nailing -ins ected prior to c ~
Z Z ~~~T ~.
Posts & ea er -refer to etai 2/S7 on sheet 8 of 8
Roof -engineered truss plan shall be on-site at time of inspection
Blocking -
Hurricane Ties
Simpson A35 framing anchors
Roof Truss X-bracing
Hangers
Roof Sheathing & Nailing
Weather Resistive Barrier ;~/
Metal Roofing -manufacturer's installation instructions shall be ~/"
on-site at inspection time ~
Attic Venting -gable end and eave
Positive Connections
Air Seal J
Fireblocking .f
Weather Resistive Barrier
INSULATION
Walls (R-19)
~
Ceiling (R-38) ~-~
Baffl
es w/ 1 air above v
~ ,
Vapor Barrier / ~ I
`~~
SIDING -color selection requires approval from BCD prior to
siding installation
DRYWALL/NAILING - S/8" Type X ~
Walls ~
Ceiling
Acoustical panels shall be installed inside to address noise
impacts per land use permit LUP03-SO ~
LIGHTING -exterior lights require motion sensor devices or an
exterior switch accessible solely to authorized personnel
NREC Lighting for interior and exterior per attached NREC
compliance form
•
J
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
Permit k BLD03-118
REQUIRED INSPECTIONS APPRnVFD/DATF.
LANDSCAPING
Screening with climbing vine, Lonicera seratina; contact John
McDonagh @ 379-5085 for inspection
FINAL
Property Address Posted -minimum 5" numbers
Fire Department Approval
Electrical Approval (L & I)
Door threshold (maximum 1 ") and landing
Final -Mechanical
Acoustical Panels (see condition under Drywall)
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; .call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
. a
Permit # BLD03-118
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the
Building Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.