Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360)379-3208 Fax: (360)385-7675
CITY OF PORT TO~~UNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
', THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-116 Issued: 09/19/03 Parcel Number: 957 312 803
Job Address: 635 Calhoun Street Zoning: R-II Type: V-N Occupancy: R-3
•
Total Occupant Load: 2
Nature of Work: Remodel Garage to ADU with loft_a_ ccessble by ladder; work includes moving building 3"
inside property line.
Owners: Doug and Nancy Van Allen Contractor: Joe Thomason - THOMPC*98700
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
***ALL ELEMENTS OF ENGINEERING REQUIRE INSPECTION PRIOR TO COVER ***
NOTE: See BLD03-116 for partial perimeter foundation and interior
footing permit
REQUIRED INSPECTIONS
APPROVFn/nATF
TEMPORARY EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site and being tracked onto adjacent rights-of
way; OK to use existing driveway
DEMOLITION
Construction debris shall be deposited in the Jefferson County
landfill or other approved areas off-site
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
Pen[ut # BLDQ3-116
REOUTRFT) TN~PFf'TT(1NC A uuun~~~~,m ,- mr
FLOOR FRAMING
First and Second Floor Joists - 2 x 8 @ 16" o.c.
Beam - 4 x 8, and 6 x 8 on top of bathroom wall
Blocking between joist and beam
Shield under Posts -engineered post base and post
cap connections //
~ ~ ~~ Z~/Q3
Positive Connections -engineered anchor connections LL
(Simpson A 34 and A35) and straps (Simpson CS16)
Treated Wood to Concrete
Anchor Bolts
PLUMBING:
Rough-In (D-V-T & Clean outs)
Water Supply
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Water Hammer Arrestor (if Dishwasher)
Pressure Reduction Valve if > 80 psi
Water Heater (Upstairs)
Metal Pan underneath
Seismic Restraint -strap tank @ 1/3 points
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
MECHANICAL -manufacturer's appliance installation
instructions shall be on-site at time of inspection
Whole House Fan @ Bathroom
Source Specific Fan @ Kitchen
Environmental Air Exhaust ducting (w/ backdra$
dampers), insulation (R-4) and terminus (located 3'
from opening)
___~
J
i
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
Pemrit # BLD03-116
•
C
-.~~
REQUIRED INSPECTIONS APPROVED/DATE
FRAMING
6 x 6 Post DF #1 per engineering -See Sheet S of plans for ~,~~ ~ ~ ~ ~= r ti._ ~, .- ,,- , ~ f •~<r;r~ ~ ~z' ~~
~~ ~~- •~ ~ ~ ~: ~A %-~ ~ l~- ~ ~ ~ f r ~'
location ~=~r_z~ ~z '~ ~,' x-~-~ `Y ~ ~r.C~~~' ~ 1 Z,/~Q-i
Walls
Engineered Shear Walls- block all edges
Ceilings
Posts, Beams & Headers -per engineering
Roof - 2 x 10 rafters @ 24" o.c.
Rafter Positive Connection
Collar ties
Roof Venting - @ 1/150 if only @ Eaves
Windows -Escape
Windows U-Factor - .40 or better
NFRC window sticker must be an windows &
doors at inspection time
Skylight U-Factor - .S8 or better
Fresh Air Intake (Wall Ports)
Doors U-Factor - .20 or better
Air Seal
Fire Blocking
Weather Resistive Barrier
INSULATION
Walls (R-21)
Ceiling (R-30 )
Floors (R-30 )
Vapor Barrier: paint on walls and ceilings, backed batts on
floor
Baffles
Crawl space - 6 mil black poly
DRY WALL NAILING
Walls
West side Exterior Wall due to proximity to property line
Ceiling
FINAL
House Numbers - S" minimum
Plumbing
MechanicaUHeating
Vapor Barrier Paint Certificate
Insulation, Certificate
Smoke Detectors
Final -Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
~~
Page 3 of 4
Pemrit # BLD03-1 t6
FN AI ONDiTinN
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required Public Works approval must be received prior to
scheduling the Buildm~ Department's final inspection _
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is re uired for anon-
q
residenttal project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval rior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca
1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4
Pem»t # BLD03-116
•
•
RFnTTTRFT) TN~PF.CTTnNS APPROVED/DATE
FRAMING
°~ -
' ~
~ ~` ~ ~~'~~ ~ ~
~
`
~ ~ ~`
6 x 6 Post DF #1 per engineering -See Sheet S of plans for .
--
_ .
-
_.
location ~ ~ : 4
~' ' ~~`, ~ ~, } . ~
Walls _
Engineered Shear Walls- block all edges
Ceilings
Posts, Beams & Headers -per engineering
Roof - 2 x 10 rafters @ 24 " o. c.
Rafter Positive Connection
Collar ties
Roof Venting - @ 1/150 if only @ Eaves
Windows -Escape
Windows U-Factor - .40 or better
NFRC window sticker must be on windows &
doors at inspection time
Skylight U-Factor - .58 or better
Fresh Air Intake (Wall Ports)
Doors U-Factor - .20 or better
Air Seal
Fire Blocking
Weather Resistive Barrier
INSULATION ' `
~ i ~~ ' . s'
Walls (R-21)
~
Ceiling (R-30) ,
r .~-:~ ~ ~ ` -. ! ~_ ; %?
Floors (R-30)
Vapor Barrier: paint on walls and ceilings, backed batts on
floor
Baffles
Crawl space - 6 mil black poly
DRY WALL NAILING ~ ;' "r `
Walls
West side Exterior Wall due to proximity to property line
Ceiling
FINAL
House Numbers - 5" minimum
Plumbing
Mechanical/Heating
Vapor Barrier Paint Certificate
Insulation Certificate
Smoke Detectors
Final -Building
Ca1148 hours before you dig for utility line locates
1-800-424-5555
t '~
Page 3 of 4
r
Waterman 8c Katz Bu>7ding
181 Quincy Street, Suile 301
Port Townsend, WA 98368
Phorn: (360) 379-3208 Fax: (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-116R-1 Issued: 07/01/03 Parcel Number: 957 312 803
Job Address: 635 Calhoun Street (ADU accessory to 627 Calhoun) Zoning: R-II
Type: V-N Occupancy: R-3 Occupant Load: >10
Nature of Work: Construct partial perimeter foundation and interior footing. Will convert garage into
two-story ADU through BLD03-116.
Owners: Doug and Nancy Van Allen Contractor: Goldenberg Construction - GOLDEC*075NC
GENERAL CONDITIONS APPLY -SEE PAGE 2 and 3
NOTE: FOUNDATION PERMIT ONLY
RF.(1TTTRF.TI TNCPF,f'TT(11V4 APPR(~VF.n/nATF
a
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2 -install on-site as needed
during construction to prevent sediment from leaving the
site and to eliminate tracking of soil onto the street
FOOTINGS ~
Setbacks
. ~.
, „_
- -,j ~t~,~c'r~r~`rr~ ~ : a, / , ~
-
~ .
,,~- ,c'
Forms __ t . _.
_ _ _ __
Reinforcement - (2) #4 each way
__ ~ _- --- --- - - -
~
~_
Interior footings - 8" x 18" w/ (2) #4 bars each way with
= ~ ~, ~ ~; ,,_; ~ ~/~ --~,
~
~
~
PBS 4.4 br ket. '~'`
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
RE UIRED INSPECTIONS
Pemtit # BLD03-116R-1
APPROVED/DATE
FOUNDATION -per engineering
Stem Wall
Forms
Reinforcement
-7~Z- `7"" 3
Anchor Bolts w/ 2" x 2" x 3/16" square washers
New foundation walls: @32" o.c. with minimum of 2 per
each sill plate board.
Existing foundation walls: %Z" diameter @ 48" o.c.;
install Simpson %2" SET adhesive anchors, concrete
embedment =10 inches; set min. 1-3/4" from
concrete edge.
Vents
Crawl space access
Girder to Concrete
Beam Pockets
Positive Connection -
Engineered Holddowns - Simpson PHD2-SDS3 with
double studs.
New foundation: anchored with Simpson SSTB16 each
holddown.
Existing foundation: Simpson 5/8" diameter SET
adhesive anchors; concrete embedment 10 inches
min.
Anchors placed min. 1-3/4" from concrete edge.
Treated Wood to Concrete
Shield under Posts
6 mil black poly
FINAL -See BLD03-116
Final -building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
J
•
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
Permit # BLD03-116R-1
x
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A_
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the
Building Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
Waterman 8c Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360) 379-3208 Fax: (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-116R-2 Issued: 10/07/03 Parcel Number: 957 312 803
Job Address: 635 Calhoun Street Zoning: R-II Type: V-N Occupancy: R-3
Total Occupant Load: 2
Nature of Work: Revision #2: add 2 x 3 window to second floor with two Simpson CS16 straps per
engineering.
Owners: Doug and Nancy Van Allen Contractor: Joe Thompson - THOMPC*98700
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
***ALL ELEMENTS OF ENGINEERING REQUIRE INSPECTION PRIOR TO COVER ***
NOTE: See BLD03-116 and BLD03-116R-1 for other inspections
REQUIRED INSPECTInN~
A PPRf)VF,11/11 A TF.
FRAMING -per attached engineering ~.-~~ P ~ ~ ~ ~, y
-
FINAL
See original inspection record
•
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pemat # BLD03-116R-2
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
.result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed daring construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is reauired Public Works approval must be received prior to
scheduling the Building Department's final inspection
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST TffiS PERMIT ON-SITE WITH THE APPROVED PLANS.
~.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2