Loading...
HomeMy WebLinkAboutBLD03-116 • Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TO~~UNSEND CONSTRUCTION PERMIT & INSPECTION RECORD ', THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-116 Issued: 09/19/03 Parcel Number: 957 312 803 Job Address: 635 Calhoun Street Zoning: R-II Type: V-N Occupancy: R-3 • Total Occupant Load: 2 Nature of Work: Remodel Garage to ADU with loft_a_ ccessble by ladder; work includes moving building 3" inside property line. Owners: Doug and Nancy Van Allen Contractor: Joe Thomason - THOMPC*98700 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 ***ALL ELEMENTS OF ENGINEERING REQUIRE INSPECTION PRIOR TO COVER *** NOTE: See BLD03-116 for partial perimeter foundation and interior footing permit REQUIRED INSPECTIONS APPROVFn/nATF TEMPORARY EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site and being tracked onto adjacent rights-of way; OK to use existing driveway DEMOLITION Construction debris shall be deposited in the Jefferson County landfill or other approved areas off-site Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Pen[ut # BLDQ3-116 REOUTRFT) TN~PFf'TT(1NC A uuun~~~~,m ,- mr FLOOR FRAMING First and Second Floor Joists - 2 x 8 @ 16" o.c. Beam - 4 x 8, and 6 x 8 on top of bathroom wall Blocking between joist and beam Shield under Posts -engineered post base and post cap connections // ~ ~ ~~ Z~/Q3 Positive Connections -engineered anchor connections LL (Simpson A 34 and A35) and straps (Simpson CS16) Treated Wood to Concrete Anchor Bolts PLUMBING: Rough-In (D-V-T & Clean outs) Water Supply Hose Bibs (backflow protection required) Pipe Insulation (R-3) Water Hammer Arrestor (if Dishwasher) Pressure Reduction Valve if > 80 psi Water Heater (Upstairs) Metal Pan underneath Seismic Restraint -strap tank @ 1/3 points Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL -manufacturer's appliance installation instructions shall be on-site at time of inspection Whole House Fan @ Bathroom Source Specific Fan @ Kitchen Environmental Air Exhaust ducting (w/ backdra$ dampers), insulation (R-4) and terminus (located 3' from opening) ___~ J i Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 Pemrit # BLD03-116 • C -.~~ REQUIRED INSPECTIONS APPROVED/DATE FRAMING 6 x 6 Post DF #1 per engineering -See Sheet S of plans for ~,~~ ~ ~ ~ ~= r ti._ ~, .- ,,- , ~ f •~<r;r~ ~ ~z' ~~ ~~ ~~- •~ ~ ~ ~: ~A %-~ ~ l~- ~ ~ ~ f r ~' location ~=~r_z~ ~z '~ ~,' x-~-~ `Y ~ ~r.C~~~' ~ 1 Z,/~Q-i Walls Engineered Shear Walls- block all edges Ceilings Posts, Beams & Headers -per engineering Roof - 2 x 10 rafters @ 24" o.c. Rafter Positive Connection Collar ties Roof Venting - @ 1/150 if only @ Eaves Windows -Escape Windows U-Factor - .40 or better NFRC window sticker must be an windows & doors at inspection time Skylight U-Factor - .S8 or better Fresh Air Intake (Wall Ports) Doors U-Factor - .20 or better Air Seal Fire Blocking Weather Resistive Barrier INSULATION Walls (R-21) Ceiling (R-30 ) Floors (R-30 ) Vapor Barrier: paint on walls and ceilings, backed batts on floor Baffles Crawl space - 6 mil black poly DRY WALL NAILING Walls West side Exterior Wall due to proximity to property line Ceiling FINAL House Numbers - S" minimum Plumbing MechanicaUHeating Vapor Barrier Paint Certificate Insulation, Certificate Smoke Detectors Final -Building Call 48 hours before you dig for utility line locates 1-800-424-5555 ~~ Page 3 of 4 Pemrit # BLD03-1 t6 FN AI ONDiTinN 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduling the Buildm~ Department's final inspection _ 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is re uired for anon- q residenttal project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval rior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca 1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4 Pem»t # BLD03-116 • • RFnTTTRFT) TN~PF.CTTnNS APPROVED/DATE FRAMING °~ - ' ~ ~ ~` ~ ~~'~~ ~ ~ ~ ` ~ ~ ~` 6 x 6 Post DF #1 per engineering -See Sheet S of plans for . -- _ . - _. location ~ ~ : 4 ~' ' ~~`, ~ ~, } . ~ Walls _ Engineered Shear Walls- block all edges Ceilings Posts, Beams & Headers -per engineering Roof - 2 x 10 rafters @ 24 " o. c. Rafter Positive Connection Collar ties Roof Venting - @ 1/150 if only @ Eaves Windows -Escape Windows U-Factor - .40 or better NFRC window sticker must be on windows & doors at inspection time Skylight U-Factor - .58 or better Fresh Air Intake (Wall Ports) Doors U-Factor - .20 or better Air Seal Fire Blocking Weather Resistive Barrier INSULATION ' ` ~ i ~~ ' . s' Walls (R-21) ~ Ceiling (R-30) , r .~-:~ ~ ~ ` -. ! ~_ ; %? Floors (R-30) Vapor Barrier: paint on walls and ceilings, backed batts on floor Baffles Crawl space - 6 mil black poly DRY WALL NAILING ~ ;' "r ` Walls West side Exterior Wall due to proximity to property line Ceiling FINAL House Numbers - 5" minimum Plumbing Mechanical/Heating Vapor Barrier Paint Certificate Insulation Certificate Smoke Detectors Final -Building Ca1148 hours before you dig for utility line locates 1-800-424-5555 t '~ Page 3 of 4 r Waterman 8c Katz Bu>7ding 181 Quincy Street, Suile 301 Port Townsend, WA 98368 Phorn: (360) 379-3208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-116R-1 Issued: 07/01/03 Parcel Number: 957 312 803 Job Address: 635 Calhoun Street (ADU accessory to 627 Calhoun) Zoning: R-II Type: V-N Occupancy: R-3 Occupant Load: >10 Nature of Work: Construct partial perimeter foundation and interior footing. Will convert garage into two-story ADU through BLD03-116. Owners: Doug and Nancy Van Allen Contractor: Goldenberg Construction - GOLDEC*075NC GENERAL CONDITIONS APPLY -SEE PAGE 2 and 3 NOTE: FOUNDATION PERMIT ONLY RF.(1TTTRF.TI TNCPF,f'TT(11V4 APPR(~VF.n/nATF a TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 -install on-site as needed during construction to prevent sediment from leaving the site and to eliminate tracking of soil onto the street FOOTINGS ~ Setbacks . ~. , „_ - -,j ~t~,~c'r~r~`rr~ ~ : a, / , ~ - ~ . ,,~- ,c' Forms __ t . _. _ _ _ __ Reinforcement - (2) #4 each way __ ~ _- --- --- - - - ~ ~_ Interior footings - 8" x 18" w/ (2) #4 bars each way with = ~ ~, ~ ~; ,,_; ~ ~/~ --~, ~ ~ ~ PBS 4.4 br ket. '~'` Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 RE UIRED INSPECTIONS Pemtit # BLD03-116R-1 APPROVED/DATE FOUNDATION -per engineering Stem Wall Forms Reinforcement -7~Z- `7"" 3 Anchor Bolts w/ 2" x 2" x 3/16" square washers New foundation walls: @32" o.c. with minimum of 2 per each sill plate board. Existing foundation walls: %Z" diameter @ 48" o.c.; install Simpson %2" SET adhesive anchors, concrete embedment =10 inches; set min. 1-3/4" from concrete edge. Vents Crawl space access Girder to Concrete Beam Pockets Positive Connection - Engineered Holddowns - Simpson PHD2-SDS3 with double studs. New foundation: anchored with Simpson SSTB16 each holddown. Existing foundation: Simpson 5/8" diameter SET adhesive anchors; concrete embedment 10 inches min. Anchors placed min. 1-3/4" from concrete edge. Treated Wood to Concrete Shield under Posts 6 mil black poly FINAL -See BLD03-116 Final -building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. J • 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 Permit # BLD03-116R-1 x 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A_ minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 Waterman 8c Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360) 379-3208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-116R-2 Issued: 10/07/03 Parcel Number: 957 312 803 Job Address: 635 Calhoun Street Zoning: R-II Type: V-N Occupancy: R-3 Total Occupant Load: 2 Nature of Work: Revision #2: add 2 x 3 window to second floor with two Simpson CS16 straps per engineering. Owners: Doug and Nancy Van Allen Contractor: Joe Thompson - THOMPC*98700 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 ***ALL ELEMENTS OF ENGINEERING REQUIRE INSPECTION PRIOR TO COVER *** NOTE: See BLD03-116 and BLD03-116R-1 for other inspections REQUIRED INSPECTInN~ A PPRf)VF,11/11 A TF. FRAMING -per attached engineering ~.-~~ P ~ ~ ~ ~, y - FINAL See original inspection record • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pemat # BLD03-116R-2 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may .result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed daring construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is reauired Public Works approval must be received prior to scheduling the Building Department's final inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST TffiS PERMIT ON-SITE WITH THE APPROVED PLANS. ~. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2