Loading...
HomeMy WebLinkAboutBLD03-114Waterman & Katz Building 181 Quincy Street, Suite 30] Port Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND Permit Number: BLD03-114 Issued: 06/19/03 Parcel Number: 955 900 054 Job Address: 2467 Highland Loop Zoning: PUD Type: V-N Total Occupant Load: 5/2 Occupancy: R-3 /U-1 Nature of Work: Construct Single-Family residence with attached garage. Owner: Hamilton Heights LLC Contractor: Same as Owner - HAMILHL033LT ****All elements of engineering including holdowns, framing, nailing, sheathing and other engineered connections require inspection prior to cover**** GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF,(ITTTRFT) TNCPF.f TTnNC APPR()VFT)/nATF. TEMP EROSION & SEDIlVIENT CONTROL See General Condition No. 2 and MIP03-059 FOOTINGS ~ r , / Setbacks ~~~ Footings Forms Reinforcement _ _ _ _ . __ __ _ __..._. Interior Footings Porch Piers LIFER FOUNDATION Stem Wall Forms Reinforcement . , ,` ~ - , '~ i ;~,~- ~ F Anchor Bolts & Washers Engineered Holdowns -- ' ~ ~ - ~'~` - f, l~~c't. , r ~, ~ is t% r tr r .,~~"2 r,~f r Vents -17 reguired ~~ ~ ~ J ~ ~; , ° ~-~ti~~ _ ,~,~ ~ ,;,z- ~ ~ Crawl Access ~ ~ ~~ / `n ~ Post-to-Foundation Wall Positive Connection/Beam Pockets ~ ~ ~~ ~ ~~r~ '~ ,'<t/„~-1_ ~.~ lea ~ ~~ - -i. (:all 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 ~~ ! Pemvt # BLD03-1 ] 4 REQUIRED INSPECTIONS APPROVED/DATE FLOOR FRAMING NOTE: Engineered BCI floor joist plan shall be on-site at time of inspection Girder Joists Blocking Shield under Posts Post-to-Foundation Wall Positive Connection/Beam Pockets _ Treated Wood to Concrete Anchor Bolts and Washers ~ ~~~a3 PLUMBING: Rough-In (D-V-T & Clean outs) Water Supply Water Hammer Arrestor @ clothes and dishwasher Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL Electric Forced Air -manufacturer's installation instructions shall be on-site at time of inspection Ducts & Duct Insulation -supply/fresh air ducts in conditioned space: R-4; heating ducts in unconditioned space: R-8 Whole House Ventilation HVAC Integrated Fresh Air 7" minimum smooth duct 8" terminal element Clock timer on furnace fan Other than motorized damper requires Ietter of certification for flow rates Source Specific Fans Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from opening) ~ ~ ~~ f i i Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 Pemvt # BLD03-] 14 RF(1TTTRFn TNCPFf TTnNC APPRnVFD/DATE FRAMING: / En ineered shear walls- - g _- ° ~ { F -,,,,~ . _~,~~`~e~ `-~~=` %~'~=its ~'`-~' Posts & Beams other than 4": DF #1 l~ ~ .'- ~~~~ ~~</i~`F `' %-'~ -' "`%' Ceiling f?e.~-+~ ~°,~~~ ~ , ,~ .; v~~,~~-?~ ~~~~~{.~~~;~~~ ~~~~ a- ; Roof -engineered truss plan to be on-site at time of inspection ~~ ~;,~,, ,;;,,.f,,~ ~ ~>> ~ ~;~,~;r_a•. ;~~ Truss Positive Connection Roof Venting -ridge & eave Windows -escape Windows -safety glazing Windows U-factor - .40 or better Door U-factor - .20 or better Skylights - .58 U-factor or better NFRC window sticker must be on windows, skylights and doors at inspection time Fresh Air -integrated Air Seal Fire Blocking Weather Resistive Barrier INSULATION Floor (R-30 ) ~ ~ Walls (R-21 ).~ ,,6,+'~„f-1 ~~~ ~'~'~ ~~' ~w~`` ' ~,. ~ ~ .eiling (R-38 ) Baffles Vapor Barrier: paint & plywood with exterior glue 6 mil black poly DRY WALL NAILING f. Walls ~ ° ~/"~ .~. ... . Ceiling , ~ ~ ~ ~ , ~~~~,- ~- ~ - ~~ ,~ '~ Garage/House Occupancy Separation ~ FINAL Public Works Sign-Off ' ' House Numbers - 5" minimum `~~ , Plumbing ' i ', Mechanical Insulation Certificate Vapor Barrier Paint Certificate ; Fresh Air Certification Smoke Detectors Final -Building • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 ~` - Pem~it # BLD03-114 EN A ONDITION 1. Contractors working on this project are required to have a Labor & Industries contractor's registration • number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page4of4