HomeMy WebLinkAboutBLD03-112W atertnan & Katz
181 Quincy Street Suite 30]
Port Townsend, WA 98368
Phone (360) 379-3208 Fax (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11 385-2294 for Inspection
Permit Number: $I,D~3-112 Issued: 06/05/03 Parcel Number: 988 801 901
Job Address: 1006 Monroe Street Zoning: R-II Type: V-N Occupancy: R-3
Total Occupant Load: No Change Nature of Work: Add cover to front porch and enlarge deck.
Owners: Jerry & Nancy Noloboff Contractor: Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF(1TTTRFTI TNCPF(~'T>(f1NC APPRnVFn/I~ATF.
•
•
FLOOR FRAMING -All framing members exposed to
weather to be pressure treated wood or of natural resistance
to decay ,,
~
~s
Joists ,
<'`~l~ ~ ~~~ Cam
Cp f ~`
Blocking ;
Posts
Positive Connections
Treated Wood to Concrete
FRAMING
NOTE: All framing members exposed to weather to be
pressure treated wood or of natural resistance to decay
Posts & Beams
Ledger
Rafters
Joists ~ ~~- ~ ~ l
Hangers _
~ ~ _ ~~ ~_ ~~'`~~~~ ~~~ 2~=~ -` j
Rafter Positive Connection ', t- `
Positive Connection Post-to-Beam
Post Base/Positive Connection
Seismic Ties
Blocking
Stairs
Guardrails
Handrails
Call 48 hours before you dig for utility line locates:
1-800-424-5555
Page 1 of 2
Pemvt # BLD03-172
FINAL -Framing and final inspections may be done at the
same time if all elements of construction are available for
inspection
House Numbers posted (min. 5") O ~/ 6~
Smoke Detectors throughout existing construction per 1997 `~
UBC; battery powered okay
Porch- Final
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
r
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates:
1-800-424-5555
Page 2 of 2