HomeMy WebLinkAboutBLD03-111r
v
C;
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360)379-3208 Fax: (360)385-7675
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
CITY OF PORT TOWNSEND
Permit Number: BLD03-111 Issued: 7/18/03 Parcel Number: 948-333-708
Job Address: 1051 Thomas Street Zoning R-II Type: V-N Occupancy: R-3
Total Occupant Load: 5
Nature of Work: Construct Single-family Dwelling -see BLD03-111R-1 for detached garage.
Owner: Maurice Hughes
Contractor: Hughes Building Co. - HUGHEBC033CK
Cell #301=4001
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: Prior to occupancy, all Public Works improvements to be installed according to approved plans.
RFinTTTRFT) TN4PE[".TTONS
APPRnVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition #2
Silt Fence as needed
Drive Off Mat to prevent sediment from leaving
the site
FOOTINGS ,.
Setbacks ~
X
- ~
~~~"
~-' ~ ~
~~--
Footings ,
;
;
~
~~' ~
Forms
Reinforcement _ _._____ _____. __ ..___.._ ____ __
e_ _.__ -
Interior Footings
~
~
Porch Piers ~ -' "
~ ~
~' ~ ~ ~ ~~ `
LIFER -. '
~'y
~~~
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
Pemrit # BLD03-111 .F
REQUIRED INSPECTIONS APPROVED/DAT E
FOUNDATION
Stem Wall
Forms
Reinforcement
Anchor Bolts w/ 2" x 2" x 3/16" square washers ~~ G -
Engineered holdowns ~ J3
FLOOR FRAMING
NOTE: Engineered BCI joist plan shall be on-site
for the inspector at inspection time
Girders
Joists
Blocking ~ d3
Sheathed cripple walls@ crawlspace
Positive Connection
Treated Wood to Concrete
Anchor Bolts & Washers
Shield Under Posts
PLUMBING:
Underground Plumbing
Rough-In (D-V-T & Clean Outs) '
f
Water Supply `
, ~
~'
Water Hammer Arrestor @ clothes & dishwasher
Gas Supply -
Hose Bibs (backflow protection required) -~
/
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
y
Water Heater
Shall not be installed below grade
Seismic Restraint -strap @ 1/3 points '
Pressure relief valve drain to exterior ~ )
~/
MECHANICAL
LPG Fireplace
Whole House Fan -Laundry room
Source Specific Fans
Minimum 3 wraps of 3M foil tape and/or
3 metal asteners
•
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
~ Pemtit #i BLD03-111
REQUIRED INSPECTIONS APPROVED/DATE
•
FRAMING:
NOTE: Engineered nailing, strapping and
blocking require inspection prior to cover
Walls
Alternate Braced Wall Panels-Do not cover
sheathing prior to shear wall inspection ~
Roof -engineered truss plan shall be on-site at
time of inspection
Attic Venting -ridge & eave
Ceilings
Posts, beams & headers ~
Windows -egress I
Windows -safety glazing
~
Windows Ufactor - .40 or better
NFRC window sticker must be on j
windows & doors at inspection time _/
Air Seal
Fresh Air Intake (window ports)
~~
Door UFactor - .20 or better
2x10 DF #2 Rafters w/collar ties not to exceed
48" o. c. r ; ., ~`
Fire Blocking f
,
Weather Resistive Barrier
~,
r
INSULATION
Floor (R-30 ~~`
Wall (R-21 )
Ceiling (R-38) Vaulted (R-30) ~,
Baffles ;'
Vapor Barrier Paint
DRY WALL NAILING
Interior GWB shear walls- Block all joints
naiUscrew 7" o.c. throughout
Walls
Ceiling
Enclosed Space Under Stairs
~~
~ ~
t
C- \
Z~~
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Pemtit # BLD03-111 •
Y~L ~!
FINAL
LPG- Manometer gauge test for. final appliance hookup
Public Works Sign-Off
House Numbers - 5"
Plumbing
Mechanical/Heating ~,
Insulation Certificate ~ \
Vapor Barrier Paint Certificate \\
Smoke Detectors ~ '~ L 1/
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels •
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections. _
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval rior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360)379-3208 Fax: (360)379-6923
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDU3-111R-1 Issued: 07/18/03 Parcel Number: 948-333-708
Job Address: 1051 Thomas Street Zoning: R-II Type: V-N Occupancy: U-1
Nature of Work: Construct 312 sg. ft. Garage accessorv to Single-Family Residence (BLD03-111)
Owner: Maurice Hughes
Contractor: Hughes Building Co. (HiJGHEBC033CI~
Cell #301-4001
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF(ITTTRF.T) TNCPF.f TT(1NC
A PPR nVF:>n/n A TF,
TEMPORARY EROSION & SEDIMENT CONTROL
See General Condition No. 2
FOOTING
__._
Setbacks _ . _ ---- -------.~-m._--__.-
____
Footings ,~,~~ ~ ~ ~/ ~ /~
`
Forms ~
Reinforcement ;_._. _____._,____ .~._._------ -.---
~UFER
FOUNDATION
Stem Wall
Forms
Reinforcement
Anchor bolts w 2"x 2" x 3/16" washers
Holdowns
FRAMING F ~
Walls-2x4 construction @ 16" o.c. ~' `fy~ ~~' ~ -
` ~ ' ~ `~` ~ _~
Treated Wood to Concrete
Anchor Bolts J
Ceiling/Roof -engineered truss plan shall be on-site at time `-` ! ~`~ ~~,
of inspection ~ ~- %
Truss Positive Connection i
Blocking ~~ ~'
Weather Resistive Barrier
Alternate Braced Wall Panel-Sheathing not to be covered
prior to inspection
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit # BLD03-111R-t
REQUIRED INSPECTIONS APPROVED/DATE
DRYWALL NAILING
5/8" Type X GWB on garage side of house/garage wall
"overlap" (less than 6' between buildings)
FINAL
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during
construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
r
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before ou di for utilit line locates
Y g Y
1-800-424-5555
Page 2 of 2