Loading...
HomeMy WebLinkAboutBLD03-106r Waterman & Katz Building I81 Quincy Street, Suite 30] Port Townsend, WA 98368 Phone: (360)379-3208 fax: (360)385-7675 s CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-106 Issued: 06/30/03 Parcel Number: 965 702 006 Job Address: 1409 Blaine Street Zoning: R-11 Type: V-N Occupancy: R-3/U-1 Occupant Load: 2/1 Nature of Work: Construct ADU with ~ara~e Owners: Bill and Gwen Howard Contractor: Wallyworks -,Malcolm Dorn; WALLYEL979C8 385-2771 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 uFnTTTRF.TI TNCPF.f TTnNC APPRnVFII/'nATF. • TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 attached Street & Utility Development Permit Silt Fence as needed ~ Drive Off Mat to restrict sediment from leaving the site FOOTINGS -refer to Sheet A-2 of plans • Setbacks ,~ ,l ~ ~n - I t ~ ~ Interiog Footings % ' ~ / ' Forms Reinforcement LIFER _ ,~' ~ ~_ SLAB Interior Footings Reinforcement FOUNDATION Stem Wall ~ ~ . Forms Reinforcement ~ !Z Anchor Bolts & Washers - 5/8" per shear wall schedule ''-' Engineered Holdowns ~ Vents - S required `~ ~ ~ \ ~~' Crawl Access Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Permit # BLD03-106 REQUIRED INSPECTIONS APPROVED/DATE FLOOR FRAMING - engineered I joist plan shall be on-site at time of inspection Foundation Cripple Wall Joists ~ 7 ~" ~ Posts S~ ~ ~~ Blockin Shield under Posts Positive Connections `~ Treated Wood to Concrete ~~ Anchor Bolts & Washers - S/8"per engineering ~ v3 ~ ~O PLUMBING: ~ ' Rough-In (D-V-T & Clean outs) W l t S , J ~ n ~ a er y upp , Water Hammer Arrestor @ clothes & dishwasher ~6b ~/ ~ Hose Bibs (backflow protection required) ~ ~ l P'pe Insu anon Pressure Reduction Valve if > 80 psi Water Heater Seismic Restraint -strap tank @ 1/3 points Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL Whole House Fan @ bathroom -max. 75 CFM , Kitchen Fan nvironmental Air Exhaust ducting (w/ backdraft dampers), ~°b ----. _ ~ ~ ~ ~ n R-4 and terminus .located 3' from o enin s ~ 1 v3 FRAMING Walls ~of~- <, t..( s s-r2-~'s c~K~S ~? I S~O Engineered Shear Walls Engineered Nailing @ Shear Walls - 4" o.c. edge nailing @ ,~ shear wall #4 Engineered Posts, Beams & Headers Posts under Dormer Beam - DF #1 Blocking ~~~ Ceiling/Roof -engineered top plate connection: min. 4' lap lice with (8) 16d nails s ~J , (~ p Engineered Connections - CS 16 straps with 2 x 6 blocking ~ ~ @ window on S side of building per page 19/19 of structural talcs Rafter Positive Connection Roof Venting Windows -escape Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 i J L Permit # BLD03-106 r . RF.OUIRF.D INSPECTIONS APPROVED/DATE FRAMING (cont'd) ~ C ~ ~ indows -safety glazing ~ Windows Ufactor - .40 or better; .20 or better for solid doors ~~ . ~ ` S , ~ NFRC window sticker must be on windows & ~ doors at inspection time Fresh Air Intake (Wall Ports) Air Seal Fire Blocking Weather Resistive Barrier INSULATION Floor (R-30 )~-- , Walls R-21 . Ceiling (R-30 ) Vapor Barrier: paint Baffles ~ ~- ~, '(~ alp C~ 6 mil black poly in crawl space DRY WALL NAILING Walls Ceiling a -" ~' "~ ~ .- ° / f' ~-~ fi' ~ Enclosed Usable Space under Stairs ~''` ~ ~ Garage/House Occupancy Separation , / FINAL Off P bli W k Si ; ~ ~" gn- c or u s House Numbers - 5" minimum ~ , Plumbing ~~° Mechanical Vapor Barrier Paint Certificate ~.--~'~~ Insulation Certificate f • Smoke Detectors - ; : , Final -Building `- ., ---- 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Permit # BLD03-106 Z. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to. beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done b~~ the Building Department within one year. Call for at least one inspection per year to keep your buildin~ permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4 Waterman & Katz Bw7dmg 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 CITY OF .PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-106R-1 Issued: 07/25/03 Parcel Number: 965 702 006 Job Address: 1409 Blaine Street Zoning: R-11 Type: V-N Occupancy: R-3/U-1 Occupant Load: 2/1 Nature of Work: Revision #1: Revise framing and shear per engineer and architect Owners: Bill and Gwen Howard Contractor: Wallyworks -Malcolm Dorn; WALLYEL979C8 385-2771 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 NOTE: SEE ORIGINAL PERMIT FOR ALL INSPECTIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Perrtrit # ~LD03-106R-1 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST TffiS PERMIT ON-SITE WITH THE APPROVED PLANS. ~J i f r utili line locates Ca1148 hours before you d g o ty 1-800-424-5555 Page 2 of 2