Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD03-102
0 • • Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: 360-379-5086 Fax 360-385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-102 Issued: 06/12/03 Parcel Number: 968 500 002 Address: 4175 Holcomb Street Zoning: PUD Type: V-N Occupancy: R-3/U-1 Total Occupant Load: 9/2 Nature of Work: Construct new house and garage Owner: Robert & Marv Weidner Contractor: Same as Owner GENERAL CONDITIONS APPLY: See Last Pale SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RF.(1TTTRF.iI TNCPFf TT(1NC APPRnVF.n/nATF. TEMP EROSION & SEDIMENT CONTROL See condition #2 and Minor Improvement Permit #03-053 GROUNDWORK PLUMBING ._, ~ ~ , ' _ , .r ~ ; ~' 3 -;~ Pressure Test ' Pipe Joints Exposed __ - _ _ _ _ ___ _ . _ -- Pipe Bedding Trap Seal Protection (if applicable) FOOTINGS Setbacks ~ Footings ~ F .r ,f ! _., ~ ~ ~ ~ ' Forms - - Reinforcement - (2) #5 UFER CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 4 Building Permit #03-102 REQUIRED INSPECTIONS APPROVED/DATE FOUNDATION Stem Wall ~ _ Forms Reinforcement -verticals @ 16"; horizontal @ 12" ~ .~' Anchor Bolts ,~ l En sneered Holdowns g ~~rf2n >;i-r` 8 lL g ~ I o3 SLAB C~~ ~ (~ ©,~ R-10 Thermal Break ---- - __ _. ~_ _ ._._~_________ _ Interior Footings 1 _ FLOOR FRAMING Engineered TJI plan shall be on-site at time of inspection Joists Blocking Treated Wood to Concrete Positive Connections Anchor Bolts & Washers PLUMBING Rough-In (D-V-T & Clean outs) Water Supply Water Hammer Arrestors Gas Supply ~ A~ !-b ~sr` d K- t ~l ~b 3 Hose Bibbs - backflow protect). n required. Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater Seismic Restraint - 2 places Pressure Relief Valve drain to exterior MECHANICAL LPG Stove -manufacturer's installation instructions shall be on-site at time of inspection Source Specific Exhaust Fans @ bathrooms (SOcfin) And laundry room, (50 cfin) Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) i Call 48 hours before you-dig for utility line locates 1-800-424-5555 Page 2 of 4 Building Permit #03-102 RF.nT1TRF.T) TNSPF.C'TTnNS APPROVED/DATE i/1~o3 • FRAMING r--,-~. ; ~ . ~;~' . ~~ _ ,_ ~..~r}~c~.e, ~.,~` Walls -engineered shear walls Ceiling/Roof -engineered truss plan to be on-site ~, Attic Venting - @ eave & ridge ~'~~ Windows -escape ((,^, ~J Window -safety glazing 40 or better Window U-Factor - ~j ~~' 43 . Door Ufactor - .20 or better ~ I `U~ Truss Positive Connection Posts, Beams & Headers Air Seal Fireblocking --~.. ~ cs-r ~' ~-~ Weather Resistive Barrier INSULATION Slab (R-10 thermal break) Walls (R-21 Ceiling (R-38 -Vapor Barrier required: paint Baffles DRYWALL NAILING '` ~~ ° ` Walls ~ ~ ! ' Ceilin s ~ r ~ ' -~ l ~ ~ l f ~ ~ ~ ` ~ Enclosed Usable Space under Stairs ~ ~ Garage/House Occupancy Separation _ , ,f _1 FINAL LPG __ : , _.~ House Numbers - 5" numbers t ~ '~ Landings • -~ Plumbing . ~ - ~ i Mechanical ' ~ . Insulation Certificate if applicable '~ Vapor Barrier Paint Certificate , ~ Smoke Detectors throughout Final -building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Building Permit #03-102 t GENERAL CONDITIONS - ~ 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass fmal inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's fmal inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been .made within six months, or if no inspections are .done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9: Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4