CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-1~~ Issued: 06/04/03 Parcel Number: 101344010
Job Address: 3921 Holcomb Street Zoning: R-II Type: V-N Occupancy: R-3
Total Occupant Load: 5 Nature of Work: Construct single-family residence
Owners: Lynne Cassell~~& Michael Blackburn Contractor: Campbell Construction-CAMPBC-111LR
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: Hours of construction are limited to 8:00 a. m. to 6:00 p.m. Monday through
• Friday and prohibited on weekends and national holidays
NOTE: All elements of engineering require inspection prior to cover
•
RF.(1TTTRF.TI TNCPF.f TT(1NC
APPR(1VF.n/nATF,
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2 & approved PUDA
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks
Footings `; r tr ..~j"~ 3~ ~' ~=~%~ ~~,
Forms ~ '
Reinforcement
Interior Footings
Engineered Interior Footing
Porch/Deck Piers
UFER
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
Permit # BLD03-100
REQUIRED INSPF,(~TT(1N~
e npu nvFnm ~ m~
J
- - -
FOUNDATION 1JI Lt11 a.•
Stem Wall "
Forms
Reinforcement
Anchor Bolts & BP washers
Vents
Crawl Access
Beam Pockets
FLOOR FRAMING ~~~~~ g ,_/~tJO~
`~'
Girder l
Joists - engineered I joist plan shall be on-site at time of
Inspection
Beams -engineered beam
Blocking
Blocking for designed interior braced wall panels
Positive Connections
Girder to Concrete
Treated Wood to Concrete
Anchor Bolts & Washers
PLUMBING:
Rough-In (D-V-T & Clean outs)
Water Supply
Gas Supply I
~ ~ ~/ 2~~03
l
Water Hammer Arrester @ clothes & dishwashers
Hose Bibs backflow rotection re wired
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
Seismic Restraint -strap tank @ 1/3 points
18" A. F. F.
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
MECHANICAL
Whole house fan - F-1 Bath
LPG Stove - provide specs on-site
Source Specific Fans
Environmental Air Exhaust ducting (w/ backdraft dampers),
insulation (R-4) and terminus (located 3' from openings)
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
Pemtit t• BLD03-100
r
I2FnI~IRF,D INSPECTIONS APPROVED/DATE
I~`RAMING
~ Walls
Blocking for interior braced wall panels
Ceilings/floor -engineered 1 joist plan to be on site
Headers and Beams -also see attached beam design `'~
Roof f
~ ~ ~_ --/~ ~lc?.~ ~.-='
t
Blocking _
Truss Positive Connections ~ `~'`=~~~~"~~'~'! ~~~~'"
Roof Venting - eave and gable vents
Windows -escape
Windows -safety glazing
Windows Ufactor - .40 or better for unlimited glazing
NFRC window sticker must be on windows &
doors at inspection time
Fresh Air Intake- Window or wall ports required
Doors U-Factor - .20 or better/Rated doors @ garage/house
Air Seal - --
~~~ ~ ~~~~
Fi er Blocking ,. ~~ -~ ~ ~- ~,~, -~
Weather Resistive Barrier
INSULATION
Floor R-30 ~r
,r.
Walls (R-21 )
Cei 'n (R-38)
----____._
_
~ _.. ____
-----
' Vapor Barrier: paint - - '
~
~ ~~ U.~ ~~~`~~~'
~-~~'~
6 mil black poly -
~ ~_.
DRY WALL NAILING
Interior braced wall panels
~,
~
~
Walls ~`~~ ~ ~:_~`,'~ ~
7~
Ceiling _
FINAL
Public Works Sign-Off
LPG
House Numbers - 5" minimum
Plumbing
.1r/' `7~
~
11
j b
Mechanical/Heating l - (
u~` ~"
Vapor Barrier Paint Certificate
Insulation Certificate
Smoke Detectors
Final -Building
• Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Permit q BLD03-100
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. -Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a. non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.