CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD03-099 Issued: 05/30/03 Parcel Number: 948 309 004
Job Address: 1128 19th Street Zoning: R-II Type: V-N Occupancy: U-1
Nature of Work: Construct 864 sp. ft. pole building for use as a garage, storage area and workshop.
Owner: Steven & Leigh Kennel Contractor: All Purpose Structures - ALLPUSI110NH
(800) 678-7761
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF.(1TTTRF.iI TNCPF.("TT(1NC
APPR()VFn/InATF
TEMPORARY EROSION & SEDIMENT CONTROL
See General Condition No 2, install on-site as needed
FOOTING -per engln,@trin~
r
Setbacks ~ ~~~ `' ~ ~~ ~~ ''
F
i
ngs
oot
'
~~
'1{
C
7
2~CE~i~~f'B~Tt } ~~`r ! tom. ~ 'L. ~ ~ ~~.' 1. - ~.. ~ ~ { ~ ~ '
~¢
_ ~
1 i °. 1 1 1 _
1
SLAB -non-structural
FRAMING -per engineering
(10) 6" x 6" P.T. posts HF #1
(2) 4" x 6" P.T. posts HF #2 next to overhead door
Girts 2" x 6" DF #2 @ 24" o.c. w/2" x 4" stiffeners @ 48" o.c.
2" x 12" DF #2 rafters with 2" x 6" ledger
Rafters @ End Walls: 2" x 10" DF #2 w/(8)d @ each rafter ~ ~', -~
~~,. -
,~. ~-f~'~
connection; (8) 16d @ each cleat 1
~
`
Ceiling/Roof -engineered truss plan shall be on-site at time of
inspection
Purlins 2" x 6" DF#2 @ 24" o.c. w/LU24 hangers or equiv.
Blocking
Girt-to-Post Positive Connection - (2) 16d nails
Purlin-to-Truss Positive Connection - (3) 16d nails
Post-to-Truss Positive Connection - (4) 16d nails; 3/4" M.B.
FINAL
Final -Buildin ~ _
~ ~ J' ~
g ~,,
~
~' }~ ~ ~/'
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit # BLD03-099
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration •
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during
construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Buildine Department's final inspection.
7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.