CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-094
Job Address: 420 Cass Street
Total Occupant Laad: 2
Owner: Nevitt & Carla Pugh
Issued: 07/22/03 Parcel Number: 957 308 008
Zoning: R-II Type: V-N Occupancy: R,=3
Nature of Work: Construct Detached ADU
Contractor: Greg Pelham - Greenstreet Construction
GREENC*981 DR - (385-3147)
GENERAL CONDITIONS APPLY: See last page
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RF.(ITTTRF.TI TNCPF.f TT()NC
APPRnVFn/nATF,
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS ''''
Setbacks 6F{
Footings
Forms _. ._,
Reinforcement ~
' ~~
Interior Footings .,
~'
~
Porch footings ~~
~:'~
Pier Footings -per design: F _
24" x 24" x 8" w/(3) #4 Each Way
LIFER ~~,~ "
,y"~~ - ;,
FOUNDATION
Stem Wall `
Forms
Reinforcement ~'
Anchor Bolts & Washers r
Post to Foundation Wall Positive Connection
Holdowns -per architectural design ..: ~'~ ~`/r-% ~- '"
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 4
Building Permit #BLD03-094
RFOi7iRFD TNSPFCTTnNS
A PPR (1VT.il/D A TF.
•
FLOOR FRAMING
Joists
Blocking
Positive Connections
Treated Wood to Concrete
Anchor Bolts & Washers
P.T. Posts -per design
Post Base
Post Cap
Beam/Post Connection - HUS410 inside
~°'
~ ~ ~'
`~
~~ ~'
PLUMBING
Rough-In (D-V-T & Clean outs}
Water Supply
Water Hammer Arrestors
LPG Gas Supply
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
Water Heater
R-10 under if electric
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground
MECHANICAL
LPG Furnace -provide specs on-site
Manufacturer's installation instructions to be on-site
@ time of inspection.
Source Specific Exhaust Fans @ bathrooms (SOcfin),
laundry room, (50 cfin) and kitchen (100 cfin)
Environmental Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located 3'
from openings)
Whole house fan -bathroom
s
Call 48 Lours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
Building Permit #BLD03-094
•
RF()TTTRFT) TN~PF.C'TinN~
APPROVED/DATE
FRAMING :';
~ ;'~ `_" ,~,
ll _ '~
,, ~1_
1 ~ ~J ~~'
Wa
s _
.
''
:
Shear walls -per architectural ---~ -•T-~------'-----_-e_ ...__~%
___ ___.._.__
S ear aneTSlocking
Roof ~--~"~
Attic venting -ridge & eave r~`
Engineered Beams
~
Posts, beams and headers ~- ,a
Windows -escape
Windows -safety glazing
Window U-factor - 0.40 or better A'
Door U-factor - 0.20 or better _ ~'
Skylight U-factor - 0.58 or better
~,
NFRC sticker must be on windows, doors & skylights
at time of inspection
Air Seal
Fresh Air Intake -wall ports
Fireblocking
Weather Resistive Barrier
INSULATION
Floor (R-30) ~"- ~
Walls (R-21) , - -
_ -:r'" ~ /
Ceiling (R-30) ~
.
Baffles -
~ ,
`
Vapor Barrier -paint _. `"" '`
~ ~~
DRYWALL NAILING _ _.
__, ~ ,, /' ~, ~ ~ ~ /~
Walls ~'w'~i'~'t'` ~,.
Ceiling
ADU/House Occupancy Separation -1 hour
construction
FINAL '
Public Works Sign-off
House Numbers - 5" numbers
Plumbing
LPG
MechanicaUHeating
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Stairs, Decks & Landings
Final -building
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Building Permit #BLD03-094 , ~
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call ~'
385-2294. A minimum of twenty-four hours notice is required. Public Works approval
must be received prior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility tine locates ~L
1-800-424-5555
Page 4 of 4 "
•
•
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: 360-379-50$6 Fax 360-3857675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD03-094R-1 Issued: 10/17/03 Parcel Number: 957 308 008
Job Address: 420 Cass Street Zoning: R-II Type: V-N Occupancy: RR=3
Total Occupant Load: Z Nature of Work: Revision #1: Change foundation shape and
location of back door for Detached ADU
Owner: Nevitt & Carla Pugh Contractor: Greg Pelham - Greenstreet Construction
GREENC*981DR - (385-3147)
GENERAL CONDITIONS APPLY: See last pale
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
D Ti` !17 TTi? 7+ Tl 7NCpTi !''Tlf (1NQ
A PPRnVFnlnATF.
See also original inspection record for required
inspections and original plans for red-lined
corrections
FLOOR FRAMING -see also original inspection
record
Joists -sizing per structural design
Engineered Floor to Floor Holdowns
PLUMBING -see original inspection record
MECHANICAL -see original inspection record
FRAMING -see also original inspection record
Shear walls -per structural design
Posts, beams and headers -per structural design
INSULATION -per original inspection record
DRYWALL NAILING -per original inspection
record
FINAL -per original inspection record
CALL 48 hours before you dig for Utility tine Locates
1-800-424-5555
Page 1 of 2
Building Permit #BLD03-094R-1
. GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works approval
must be received prior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Call 48 hours before you dig for utility line locates
1-800-424-5555