HomeMy WebLinkAboutBLD03-093f
r
u
Waterman & KauBuilding
I81 Quincy Street, Suite 301
Pori Townund, WA 98368
Phone: (360)379-3208 Fax: (360)385-7675
•
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD03-093 Issued: 05/14/03 Parcel Number: 001 023 013
Job Address: 716 Fir Street Zoning: R-II Type: V-N Occupancy: R`3
Nature of Work: Remodel/repair bath and closet; replace 2 windows
Owner: Bart & Connie Mooyman-Beck Contractor: Tom Lang Residential Remodeling
TOMLA1ZR994NA
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUIRED:_
Electrical -Contact Labor & Industries @ 360-417-2702
D Ti !17 T7D T`i 71 TNCDTi !''TT(1NC a PPR nvF.ntn a TF
•
DEMOLITION
Materials from demolition shall be taken to the Jefferson
County Landfill or other approved location in
accordance with all state and local laws
FLOOR FRAMING -inspection required prior
to cover
Joists o tom.
Hangers ~`~ ~„ 16 ~~
Blocking
MECHANICAL
Bath Fan - SO cfm
Environmental Air Exhaust ducting (with backdraft
damper), insulation (R-4) and terminus (located 3' from
openings into building)
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
w
Permit #BLD03-093 ~
REQUIRED INSPECTIONS APPRnVFnInATF
FRAMING - - - - - - -- - - - -
Electrical inspection required prior to framing ~r ~~ D
,_Walls ____.__ ~
1>
Windows -escape
Windows
Window Ufactor - .40 or better
NFRC window sticker must be on
windows at inspection time
Air Seal
Fireblocking (if applicable) @ tub/shower penetrations
INSULATION ,
Fill exposed, exterior Wall Cavities Q~ ~
/z~/6S
6 mil balck poly in crawl space
Vapor Bamer required on warm side of new drywall @
exterior walls
DRYWALL NAILING
Walls Q
C3K.. 1~ ~'Z-1~~~
FINAL ~ ,~
Smoke Detectors throughout house per 1997 Uniform
Building Code (one in each sleeping room and in
area(s) leading to sleeping rooms); battery powered ~'~
Y,
a ~ (,~~
smoke detectors adequate in existing construction
ildi ~
~ /'
Bu
ng -mechanical ~
Vapor Barrier Paint certificate (if applicable) ~`/"
House Numbers -check for 5" high 1 0 ,~'G
Final -Building
•
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shalt be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
•
Permit #BLD03-093
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for a non-
residential project.
8. All building permits expire if na progress has been made within six months, or if no inspections are done
6y the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 2