Loading...
HomeMy WebLinkAboutBLD03-093f r u Waterman & KauBuilding I81 Quincy Street, Suite 301 Pori Townund, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-093 Issued: 05/14/03 Parcel Number: 001 023 013 Job Address: 716 Fir Street Zoning: R-II Type: V-N Occupancy: R`3 Nature of Work: Remodel/repair bath and closet; replace 2 windows Owner: Bart & Connie Mooyman-Beck Contractor: Tom Lang Residential Remodeling TOMLA1ZR994NA GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUIRED:_ Electrical -Contact Labor & Industries @ 360-417-2702 D Ti !17 T7D T`i 71 TNCDTi !''TT(1NC a PPR nvF.ntn a TF • DEMOLITION Materials from demolition shall be taken to the Jefferson County Landfill or other approved location in accordance with all state and local laws FLOOR FRAMING -inspection required prior to cover Joists o tom. Hangers ~`~ ~„ 16 ~~ Blocking MECHANICAL Bath Fan - SO cfm Environmental Air Exhaust ducting (with backdraft damper), insulation (R-4) and terminus (located 3' from openings into building) Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 w Permit #BLD03-093 ~ REQUIRED INSPECTIONS APPRnVFnInATF FRAMING - - - - - - -- - - - - Electrical inspection required prior to framing ~r ~~ D ,_Walls ____.__ ~ 1> Windows -escape Windows Window Ufactor - .40 or better NFRC window sticker must be on windows at inspection time Air Seal Fireblocking (if applicable) @ tub/shower penetrations INSULATION , Fill exposed, exterior Wall Cavities Q~ ~ /z~/6S 6 mil balck poly in crawl space Vapor Bamer required on warm side of new drywall @ exterior walls DRYWALL NAILING Walls Q C3K.. 1~ ~'Z-1~~~ FINAL ~ ,~ Smoke Detectors throughout house per 1997 Uniform Building Code (one in each sleeping room and in area(s) leading to sleeping rooms); battery powered ~'~ Y, a ~ (,~~ smoke detectors adequate in existing construction ildi ~ ~ /' Bu ng -mechanical ~ Vapor Barrier Paint certificate (if applicable) ~`/" House Numbers -check for 5" high 1 0 ,~'G Final -Building • GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shalt be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 • Permit #BLD03-093 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for a non- residential project. 8. All building permits expire if na progress has been made within six months, or if no inspections are done 6y the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 2