Loading...
HomeMy WebLinkAboutBLD03-092_. • • • Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: 360-379-5086 Faz360-385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD~3-~92 Issued: 05/23/03 Parcel Number: 984 601 402 Job Address:412 Foster Street Zoning: R-II Type: V-N Occupancy: R-3 Total Occupant Load: 9 Nature of Work: Remodel Single-family Dwelling with addition of living space and carport Owner: Glen & Peggy Staley Contractor: LD Richert LDRICL*066L0 GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REQUIItED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 Demolition Permit - MIS03-018 (issued 5/22/03) RF.()TTTRF.TI TN~PF.f'TT[1N4 APPR()VF,I)/>nATF TEMP EROSION & SEDIlVIENT CONTROL See General Condition No. 2 Silt Fence as needed Drive OffMat to restrict sediment from leaving the site FOOTINGS Setbacks //llll 1 rt V *' qG~k , , r . Footings . , ('~, u ~ t~. ~-,; ~~ . ;~ .~ ~, ~ ~' ~ ~ ~ ~~'. ~/o Forms Reinforcement Porch Piers Carport LIFER M. FOUNDATION ~ - Stem Wall ,~ (, ~~ Forms - - --~ G 1 a ;~ Reinforcement Anchor Bolts & Washers Engineered Holdowns Waterproofing CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 5 Building Pa~xit p03.09Z ` RFni1iRFD iN~PF.C''T><[)N4 APPRnvFnme'rF GROUNDWORK PLUMBING Pressure Test Pipe Joints Exposed Pipe Bedding SLAB -lower floor slab existing FLOOR FRAMING NOTE: Engineered BCI floor plan on-site and available to the Inspector at inspection time Hydronic Heat Tubing Joists Blocking Positive Connections Treated Wood to Concrete Anchor Bolts & Washers PLUMBING Rough-In (D-V-T & Clean outs) . ` Water Supply Water Hammer Arrestors Gas Supply Hose Bibbs - backflow protection required Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water HeaterBoiler -manufacturer's installation instructions shall be on-site Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, terminate 6" -24" above ground MECHANICAL Boiler Whole House Fan -new Bath Bathroom 2, (50 cfm) and kitchen (100 cfm) Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) r Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 5 • • REnUIRED INS~PECTIONS~ ,~ ~''~~ Building Permit #03-092 . ((~ i APPROVED/DATE FRAMING Walls Engineered Shear Walls Engineered Beam Roof -engineered truss plan shall be on-site at time of inspection Truss positive connection Attic venting -ridge (?) & eave Posts, beams and headers Attic Access Windows -escape Windows -safety glazing Window U-factor - 0.40 or better Door U-factor - 0.20 or better Air Seal Fresh Air Intake -wall ports Fireblocking Weather Resistive Barrier CHIMNEY Reinforcement Straps Termination above roof INSULATION --_ ~, Walls (R-2l ~, ~ ' a ~ `~O~ Ceiling (R-38 ) Baffles ~P~ ~- 1~ . lU -~ ~ Vapor Barrier -paint DRYWALL NAILING Walls ' ' ~ Ceiling ' ~ ,i % "" ~ ~ Enclosed Usable Space under Stairs ~ sE ~ ' r~ ~~ Garage House Occupancy Separation ;~` Dumbwaiter Shaft - I-hour with 20 minute, self- closing door Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 5 Building Pere~a #L'3-~T3'I RE UIRED INSPECTIONS APPROVED ATE FINAL LPG _ House Numbers - 5" numbers Plumbing MechanicallHeating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors throughout Stairs, Porch & Landings Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is reauired. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within sig months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 5 Building Permit #03-092 9. Revisions require review and approval rior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Ca1148 hours before you dig for utility line locates ' 1-800-424-5555 Page 5 of 5 '~ U .] • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-U92R-1 Issued: 08/19/03 Parcel Number: 984 601 402 Job Address: 412 Foster Street Zoning: R-II Type: V-N Occupancy: RR=3 Total Occupant Load: N/C Nature of Work: Revision #1: Engineered retaining wall. Owners: Glen & Peggy Staley Contractor: LD Richert - LDRICL*066L0 GENERAL CONDITIONS APPLY: See last Wage SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 NOTE: See original inspection record for other inspections. RFnTTTRF.T) TNCPFf TT(1NC A pUi?l1VT. i1fR A TL' FOOTINGS -per attached engineering Setbacks Footings -extend per engineering detail ~ -_ Forms Reinforce ent f ~ ~ ~ ~ ' ___ ---____. ___ _. / ~t ~ ~ ~ m ~ ; ~ _ raw Pipe ---_ FOUNDATION -all elements of engineering require inspection prior to cover ~~ Stem Wall Forms rV > ' ~~~ ~ ~ ~/~` ±-fi . j Reinforcement - #4 @ 12" o.c. horizontal and - vertical Building Pem~it #03-092R-1 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP} require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required. after inspection report corrections are completed. • 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required Public Works aaaroval must be received arior to scheduling the Building Deaartment's final inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.