CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD~3-~92 Issued: 05/23/03 Parcel Number: 984 601 402
Job Address:412 Foster Street Zoning: R-II Type: V-N Occupancy: R-3
Total Occupant Load: 9 Nature of Work: Remodel Single-family Dwelling with addition
of living space and carport
Owner: Glen & Peggy Staley Contractor: LD Richert LDRICL*066L0
GENERAL CONDITIONS APPLY: See last page
SEPARATE PERMITS REQUIItED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
Demolition Permit - MIS03-018 (issued 5/22/03)
RF.()TTTRF.TI TN~PF.f'TT[1N4
APPR()VF,I)/>nATF
TEMP EROSION & SEDIlVIENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive OffMat to restrict sediment from leaving
the site
FOOTINGS
Setbacks
//llll
1 rt V
*' qG~k , , r
.
Footings .
,
('~, u ~ t~. ~-,; ~~ . ;~ .~
~, ~ ~' ~ ~ ~ ~~'. ~/o
Forms
Reinforcement
Porch Piers
Carport
LIFER
M.
FOUNDATION ~ -
Stem Wall ,~ (, ~~
Forms - - --~
G 1 a ;~
Reinforcement
Anchor Bolts & Washers
Engineered Holdowns
Waterproofing
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 5
Building Pa~xit p03.09Z `
RFni1iRFD iN~PF.C''T><[)N4 APPRnvFnme'rF
GROUNDWORK PLUMBING
Pressure Test
Pipe Joints Exposed
Pipe Bedding
SLAB -lower floor slab existing
FLOOR FRAMING
NOTE: Engineered BCI floor plan on-site and
available to the Inspector at inspection time
Hydronic Heat Tubing
Joists
Blocking
Positive Connections
Treated Wood to Concrete
Anchor Bolts & Washers
PLUMBING
Rough-In (D-V-T & Clean outs) . `
Water Supply
Water Hammer Arrestors
Gas Supply
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
Water HeaterBoiler -manufacturer's installation
instructions shall be on-site
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground
MECHANICAL
Boiler
Whole House Fan -new Bath
Bathroom 2, (50 cfm) and kitchen (100 cfm)
Environmental air exhaust ducting (with backdraft
dampers), insulation (R-4) and terminus (3' from
openings into building)
r
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 5
•
•
REnUIRED INS~PECTIONS~
,~ ~''~~ Building Permit #03-092
. ((~
i
APPROVED/DATE
FRAMING
Walls
Engineered Shear Walls
Engineered Beam
Roof -engineered truss plan shall be on-site at time
of inspection
Truss positive connection
Attic venting -ridge (?) & eave
Posts, beams and headers
Attic Access
Windows -escape
Windows -safety glazing
Window U-factor - 0.40 or better
Door U-factor - 0.20 or better
Air Seal
Fresh Air Intake -wall ports
Fireblocking
Weather Resistive Barrier
CHIMNEY
Reinforcement
Straps
Termination above roof
INSULATION --_
~,
Walls (R-2l ~, ~ ' a ~ `~O~
Ceiling (R-38 )
Baffles ~P~ ~- 1~ . lU -~ ~
Vapor Barrier -paint
DRYWALL NAILING
Walls
'
' ~
Ceiling ' ~
,i
% "" ~
~
Enclosed Usable Space under Stairs ~ sE ~ '
r~ ~~
Garage House Occupancy Separation ;~`
Dumbwaiter Shaft - I-hour with 20 minute, self-
closing door
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 5
Building Pere~a #L'3-~T3'I
RE UIRED INSPECTIONS APPROVED ATE
FINAL
LPG _
House Numbers - 5" numbers
Plumbing
MechanicallHeating
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors throughout
Stairs, Porch & Landings
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is reauired. Public Works approval
must be received prior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within sig months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 5
Building Permit #03-092
9. Revisions require review and approval rior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Ca1148 hours before you dig for utility line locates
' 1-800-424-5555
Page 5 of 5
'~
U
.]
•
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-U92R-1 Issued: 08/19/03 Parcel Number: 984 601 402
Job Address: 412 Foster Street Zoning: R-II Type: V-N Occupancy: RR=3
Total Occupant Load: N/C
Nature of Work: Revision #1: Engineered retaining wall.
Owners: Glen & Peggy Staley Contractor: LD Richert - LDRICL*066L0
GENERAL CONDITIONS APPLY: See last Wage
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
NOTE: See original inspection record for other inspections.
RFnTTTRF.T) TNCPFf TT(1NC
A pUi?l1VT. i1fR A TL'
FOOTINGS -per attached engineering
Setbacks
Footings -extend per engineering detail ~
-_
Forms
Reinforce
ent
f ~ ~ ~
~ '
___
---____. ___ _.
/
~t ~ ~ ~
m ~ ;
~ _
raw Pipe ---_
FOUNDATION -all elements of engineering
require inspection prior to cover ~~
Stem Wall
Forms
rV >
' ~~~
~
~
~/~`
±-fi
. j
Reinforcement - #4 @ 12" o.c. horizontal and -
vertical
Building Pem~it #03-092R-1
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP} require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required. after inspection report corrections are completed.
•
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required Public Works aaaroval
must be received arior to scheduling the Building Deaartment's final inspection
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.