CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD03-~90 Issued: 05/09/03 Parcel Number: 989 712 902
Job Address: 631 Benton Street Zoning: R-II Type: V-N Occupancy: RR=3
Total Occupant Load: 3 Nature of Work: Add second story & deck to residence
Owner: Donna Haynes Contractor: Chohrach Construction - CHOHRCC998J0
GENERAL CONDITIONS APPLY: See last ua~e
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RF.()TITRFT) TN~PF,C'.TTnN~
A PPR (1VFil/Il A TF.
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Deck
PLUMBING
Rough-In (D-V-T & Clean outs)
Water Supply
Water Hammer Arrestors
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
Water Heater -Existing
R-10 under if electric
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 4
Building Perrnit #BLD03-090
•
•
U
RFnT1TRF,1~ TN~PF("TTnNS
APPROVED/DATE
MECHANICAL
Source Specific Exhaust Fans a7 bathrooms (SOcfin),
laundry room, (50 cfin) and kitchen (100 cfm)
Environmental Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located 3'
from openings)
Whole house fan -bathroom
FRAMING -Per architectural drawing
Floor -Engineered BCI floor plan on-site and
available to the Inspector at inspection time
Walls
Shear walls
Shear Panel Blocking
Roof
Rafters
Joist positive connection
Joist venting -gable & eave
Fireplace clearance to framing
Posts, beams and headers
Deck
Windows -escape
Windows -safety glazing
Window U-factor - 0.40 or better
Door U-factor - 0.20 or better
Skylight U-factor - 0.58 or better
NFRC sticker must be on windows, doors &
skylights at time of inspection
Air Seal
Fresh Air Intake -window ports
Fireblocking
Weather Resistive Barrier
INSULATION
Floor (R-30 )
Walls (R-21)
Ceiling (R-38;-30, vault)
Baffles
Vapor Barrier -paint
6 mil black poly in crawl space
DRYWALL NAILING
Walls
Ceiling
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
Building Pernut #BLD03-090
REQUIRED INSPECTIONS APPROVED/DATE
•
FINAL
Public Works Sign-off
House Numbers - 5" numbers
Plumbing
LPG
Mechanical/Heating
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Stairs, Decks & Landings
Final -building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
• permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass fmal inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works approval
must be received prior to scheduling the Building Department's final-inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
• Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Building Permit #BLD03-090
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
S 9. Revisions require review and approval rior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•