Loading...
HomeMy WebLinkAboutBLD03-089• • • Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: 360J79-5086 Faa 360-385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-~89 Issued: 05/27/03 Parcel Number: 948 002 704 Job Address: 3270 Silver Street Zoning: R-II Type: V-N Occupancy: R-3/U-1 Total Occupant Load: 8/2 Nature of Work: Construct Single-family Dwelling with attached ag rage Owner: Dobson Construction, Inc Contractor: Dobson Construction, Inc_D_OBSOCI012K7 GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RF.(ITTTRF.iI TNCPF.f TI(lNQ APPR(1VF.n/nATF. TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks ~ r l Footings ; , ; ;~~ • i l ~' ~'~ R ' ~~ `~ Forms ~ (_Y _ Reinforcement Interior Footings . . .~ --~ ___- _ ._ .._. _ .....__.__.~.__,.~~_~.._..-__-.~_. __ __-.____ __ Porch Piers D k_ . _ LIFER _.__ --r__._ __.-____ ~-~ ~_.___V__ r t.~ ti ~ `~ ~- .-. ,; FOUNDATION Stem Wall I -~ ~_ ; ~ ~~ - r > - ~'-~- Forms Reinforcement Anchor Bolts-& Washers _ __ __ _ ._ .. Post to Foundation Wall Positive Connection ~ ~ _ 5 ,`i, y . . . _ ~~Ioldo~wns __~er architectural design _. __ -i_ CALL 48 hours before you.dig for Utility line locates 1-800-424-5555 Page 1 of 4 Building Permit #03-089 REQUIRED INSPECTIONS APPRnVF.n/1nATF. ... GROUNDWORK PLUMBING Pressure Test Pipe Joints Exposed Pipe Bedding SLAB Interior 'n Insulation - R-10 ull insulated ~,~ '1 03 Hy romc Heat Tubing FLOOR FRAMING ~~- s~ 6c-t o K ~(.zE~d3 NOTE: Engineered BCI floor plan on-site and available to the Inspector at inspection time Hydronic Heat Tubing Joists. Blocking Positive Connections Treated Wood to Concrete Anchor Bolts & Washers Foundation Vents Crawl Access ' PLUMBING Rough-In (D-V-T & Clean outs) Y u L vv~, Water S l ~ r7Y' ~~ '~`''~`~"` d'k` ~~~' ~ ~ y upp ~ ~ j~ ~ l ~ ~ Water Hammer Arrestors / Gas Supply Hose Bibbs - backflow protection required Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater R-10 under if electric Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, terminate 6" -24" above ground MECHANICAL Boiler -manufacturer's installation instructions ;7 . shall be on-site at time of inspection ,~~ Whole House Fan -Utility Room ~~• Source Specific Exhaust Fans @ bathroom (SOcfin), ~ laundry room, (50 cfin) and kitchen (100 cfin) ~ ~ ~1 Environmental air exhaust ducting (with backdraft ~ ~ ~J dampers), insulation (R-4) and terminus (3' from ~, o enin s into buildin Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 • • • RF.nTTTRET) TN~PF.f'TT(1N~ Building Pemvt #03-089 APPRnVED/DATE FRAMING Walls Roof Rafter positive connection - Attic venting -ridge & eave Posts, beams and headers Holdowns -per architectural design Attic Access Windows -escape Windows -safety glazing Window U-factor - 0.40 or better Door U-factor - 0.20 or better Skylight U-factor - 0.58 or better NFRC sticker must be on windows, doors & skylights at time of inspection ' Air Seal Fresh Air Intake -window ports Fireblocking Weather Resistive Barrier INSULATION Floor (R-30 ) Walls (R-21) Ceiling (R-30 ) Baffles Vapor Barrier -paint 6 mil black poly in crawl space . i DRYWALL NAILING :.~ ~ Walls Interior braced wall panels ` `' Garage House Occupancy Separation Ceiling FINAL Public Works Sign-ofI' LPG House Numbers - 5" numbers Plumbing MechanicaUHeating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Stairs, Decks & Landings ,, Final -Building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Building Permit #03-089 ~ " GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call _ 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within siz months; or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval rior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4