HomeMy WebLinkAboutBLD03-087Waterman & Katz Building
181 Quincy Street. Suite 301
' Port Townsend. WA 98368
~ ~ Phone: (360)379-3208 Fax: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BZ.D~3-0g7 Issued: 06/03/03 Parcel Number: 001-044-007
Job Address: 2343 Thomas Street Zoning: R-II Type: V-N Occupancy: U-1
Nature of Work: Repair/remodel existing barn; construct new attached storage space
Owners: Andy Cochrane Contractor: Same as Owner
643-3080
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF.(ITTTRF.lI TNCPF.f'TTnN~ APPRnVED/DATE
TEMPORARY EROSION & SEDIMENT CONTROL
See General Condition No 2, install on-site as needed
during construction
GROUNDWORK PLUMBING
Pressure Test
Pipe Joints Exposed
Pipe Bedding
FOOTING
Setbacks
Forms
Footings
Reinforcement
Interior Footings
Post Footings @ covered storage
UFER
FOUNDATION WALL
Stem Wall
Forms
Reinforcement -vertical approved @ 24 "per architect
Anchor Bolts .
SLAB
Monolithic Slab @ stall perimeter
Interior Thickened Footings
Reinforcement
Anchor Bolts & Washers
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
Permit N BLD03-087
~ +
REQUIRED INSPECTIONS APPRnvFnmATF
PLUMBING
Rough-In
Water Supply
Hose Bibs (existing)
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
Water Heater (if applicable)
Seismic Straps
Pressure Relief Valve Drain to exterior, terminate 6" -24"
above ground
MECHANICAL
Bathroom Fan
Environmental Air Exhaust ducting (w/ backdraft dampers),
insulation (R-4} and terminus (located 3' from openings)
FRAMING
Walls
Roof
Rafters
Hangers
~ R1 ~ 4~
Blocking
Posts and Beams
Positive Connections
Weather Resistive Barrier
INSULATION -heater limited to one watt per square foot,
maximum, for "unheated space "; optional to verify
insulation and door and window values
Walls
Ceiling
Windows
Door
DRYWALL
Walls
Ceiling
FINAL
House Numbers - 5" numbers of contrasting color posted
near main entrance of house and visible from street per
City Ordinance
Final -Building
•
•
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
Permii # BLD03-087
.~
- ~ ~` ' GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during
construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3