Loading...
HomeMy WebLinkAboutBLD03-081i Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360)3793208 Fax: (360)385-7675 CITY OF PORT TO~~NSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-081 Issued: 5/7/01 Parcel Number: 989 703 901 Job Address: 1004 Water Street Zoning: C-III Type: V-N Occupancy: RR=1 Total Occupant Load: 2 Nature of Work: Add one guest room at mezzanine Owner: Palace Prouerties, LLC Contractor: TBD GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF.(11TTRF.11 TN~PF.f TT(1N~ APPRnVED/DATE DEMOLITION Materials from construction shall be deposited in approved areas off-site in accordance with all state and local laws and ordinances FLOOR FRAMING Joists PLUMBING: Barrier-Free Compliance Required D-W-V Rough-In Water Supply Pressure Reducing Valve if> 80 psi Pipe Insulation - R-3 MECHANICAL Source Specific Bathroom Fans Relocated grill in return air FRAMING ;~<<; ~ f:,•'- ~~ ,,~ ,~ ~~~' ~, -~ ~ z_ t: ,~_ Walls Masonry opening per engineer Fire Blocking Dra$ Stop Egress window ~ ~..... -,~ ...,...., .,....,~ ., ~ .,.. .t, ..,. ... _v ____- 1-800-424-5555 Page 1 of 3 Pemtit #BLD03081 REQUIRED INSPECTIONS APPROVED/DATE INSULATION Walls DRYWALL Walls 01/_ g G1 18103 FINAL Property address posted -min. S" numbers Fire Department Sign-OfF Electrical Sign-off (L & I) Plumbing -Barrier Free Required ~ (' `~d3 Mechanical GENERAL CONDITIONS 1. Contractors working on this project are regnired to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior • to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during constriction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works annroval must be received urior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. Call 48 Lours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 Permit IIBLD03081 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. .9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. r1 ~~ Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3