Loading...
HomeMy WebLinkAboutBLD03-080.~ 1 Waterman & Katz Building 181 Quincy Street Suite 301 Port Townsend, WA 98368 Phone (360) 379-3208 Fax (360) 385-7675 CITY OF PORT TOWNSEND PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE CALL 385-2626 FOR INSPECTION Permit Number: BLD03-OSO Issued: OS/ 14/03 Job Address: 824 Water Street Zoning: C-III Nature of Work: Install Automatic Fire Sprinkler System Use of Building: Upstairs to be changed from residential apartment to transient residential use. Owner: Ritch Sorgen Contractor: Innovated Fire Sprinklers - INNVOVFSO44DR 5EE BACK FOR REQUIItED INSPECTIONS Page 1 of 2 Permit #BLD03-080 Inspections & Tests Pass Fail N/A ^ ^ ^ Public Works Department Inspection Approval (Double check detector assembly prior to installation) /nspector Date ^ ^ ^ Hydrostatic Test (2 hour, 200 psi minimum OR ^ ^ ^ Pressurized Air Test (24-hour dry test to 40 psi) ^ ^ ^ Flush (with sieve) ^ ^ ^ Flow Test(s) (Water pressure gauge reading: -Drop:_) ^ ^ ^ Fire Alarm System Intertie Test, Local Waterflow Alarm Req'd. (Tamper and Flow) Seconds ^ ^ ^ Pressure reduction valve required if static water supply pressure > 80 psi ^ ^ ^ Labeling (Control Valves, Drains, etc.) ^ ^ ^ Sprinkler Box Contents (Wrench, heads, etc.) ^ ^ ^ Water Motor Alarm ^ ^ ^ Adequate heat provision for piping protection /nspector Date Pass Fail N/A ^ ^ ^ Contractor's Material & Test Certificate filed: ^ ^ ^ As-built Plans (24 x 36" maximum format) filed: ^ ^ ^ Fire Department Final Inspection Approval /nspector Date Page 2 of 2 ~O~~7SEND Fj ~ R cD~ ' ~ O~'a • General Sprinkler System Permit No. Building Permit No.: Facility Address: Facility Name: S ste C et ^ Dry Water Supply: ^ Dedicated main City of Port Townsend Fire Department OF PORT TOE ~~ y`f't~ U ~ ~9~~ WA5>i~' Fire Protection System Inspection Checklist: Automatic Sprinkler System NFPA 13, 13R, I5, 24 1st 03-08'O oZ- ~~ ~ '' i ^ Deluge f domestic Above-Ground Contractor's State License: Undersiround ^ Contractor's State License [Level U]: ^ Certicate of Competency Stamp [Level U]: ^ Preaction j~~ Plan Review 0~ lans Received [Date: Os ~ d ~ ] ~ydraulic Calculations ary Sheet j~Dletailed Work Sheet ^JGraph Sheet Qa Cross-Connection Control ~' Engineer's Stamp [Level III or U _~ Site Inspection fLocatesl ^ Fire Department Connection [Storz] ^ Vault[s] ^ Post Indicator Valve Construction Ins ection s ~Iping, Bracing, Valve Installations Cd' Check Valves ^ Drain and drip device between FDC and Check Valve ^ Approval for Cover [except @joints when prior to flow tests] Inspector Int. & D 6 OZ/~j Inspector Int. & Dt.: /~ Inspector Int. & Dt.: Inspector Int. & d ~~.~ d3 Inspector Int. & 6 ~/dam Inspector Int. b6 1> ?//03 Ins ection s & System Testfsl ~/ Inspector Int. & t.: 0'3 0 ~3 Hydrostatic Test [2-hour, 200 psi min, 13, 13R; Static ~ 13D] ~ ~~ fi ^ ressurized Air Test [24-hour dry test to 40 psi] / sh with sieve ~ `~ ~ ~~~ ~•,S ~l Flow Test -Water Pressure Gauge Reading: !/~ si static to ~' Psi flow rea g ~%% ^ ire Alarm System Inter-tie w;,tlj Spr~il~r stem Test ~ @ ~~~ ~_~~ S~~inkler head installation ~(/~" j ~s C~Piping, bracing, system installation I7~~abeling [Control Valves, drains, etc.] ,0"'Sprinkler Box Contents Water Motor Alarm [25 heads or more] [Tamper and flow): Secs ^ Fire Department Connection _ Adequate heat provision for piping protectionf~ ~ (~ ~~Qi~~~ C:\WINDOWS\Desktop\Tom's File Cabinet\Forms & Templates\Sprinkler System\Sprinkler System Inspection Checkoffdoc 6/2/03 f Contractor's Material & Test Certificate: ~ ,6,Q. Private Fire Service Main Contractor's Material & Test Certificate: ~~~ As-Built Plans/Instructions in Plan Box ~~... ~% ~_ ~Q~f..~' Maintenance Company Name: Address: Contact Number: Account Number: Fire Department Approval Inspector: Date: ~ Filed wBldg. Official: Notes Inspector Int. & Dt.: Inspector Int. & D . ~ ~ ~~ 3 Inspector Int. & .: ~i~ ~/' CJ • C:\WINDOWS\Desktop\Tom's File Cabinet\Forms & Templates\Sprinkler Sys[em\Sprinkler System Inspection Checkoffdoc 6/2/03 ~._ ~.~._ ~O~IisENp p~~ ~QORT j0~ o ,, ~ ~'o City of Port Townsend ,,~ y~~ a ~ Fire Department " _ _ o ~~~~_~`. 1310 Lawrence Street, Port Townsend, WA 98368 ~i q~wn (360) 385-2626 Email: ptfd(a~i.port-townsend.wa.us Fax: (360) 385-1122 PLAN REVIEW MEMORANDUM TO: Jan Zimmer, Plans Tech FR: Tom Aumock, Asst. Fire Chief DT: 13 May 2003 RE: BLD03-080, Sorgen, 824 Water Street, Sprinkler System This department is in receipt of the set of plans for the above-referenced proposal from your office. The above-reference proposal was reviewed by this department relative to the Uniform Fire Code [U.F.C.], 1997 Edition, and the following constitutes this department's findings and determinations based upon the plans of record submitted. Findin>;s & Determinations: 1. The proposal was reviewed as a Group R transient accommodation occupancy with a Type V-N construction classification for the second floor of the subject structure; and, • 2. The department recommends approval of a request for use of the domestic water supply which is allowed under the provisions of UFC Section 1003.1.1 Exception No.2, which reads Automatic sprinkler systems may be connected to the domestic water-supply main when approved by the building official. provided the domestic supply is of adequate pressure, capacity and sizing for the combined domestic and sprinkler requirements. In such case, the sprinkler system connection shall be made between the public water main or meter and the building shutoff valve, and there shall not be intervening valves or connections. [with the exception of the mandated DDC valve noted in item No. 6 below) 3. The automatic fire sprinkler system is found to be designed by a licensed technician (W.A.C. 212-80, Level II). The basis for design was not found on the plan set, none the less, the design provisions of Uniform Building Code Standard 9-1 and related sections shall apply, and; 4. A complete set of as-built drawings of the system shall be filed for record with this department if changes are made to the permit set, and; 5. A pressure reduction valve may be required by the UPC for the sprinkler main as it appears that the static water supply pressure exceeds 80 psi, and; 6. Back-flow prevention shall be accomplished by the following devices, unless determined otherwise by the Cityof Port Townsend Water Dept., and in the order of City preference [residential single- check valves are not allowed] - Double check-valve assembly--DCVA - Double check detector assembly-- DCDA C:\WINDOWS\Desktop\Tom's File Cabinet\Correspondence\Sorgen Sprinkler System.doc 6/2/03 # ' • 7. The backflow prevention device shall be approved for installation by the City of Port Townsend Department of Public Works, Water Division, prior to installation, and; 8. The double check-valve or other assemblies shall receive annual confidence test and recordation along with the sprinkler system, with a copy of the report provided to the City of Port Townsend Fire Department, and Water Department Any other applicable or relevant sections of said Code not covered herein shall nonetheless apply to this proposal. 1.0 hours time was consumed in the review of this proposal It is the administrative determination of this department that the proposal be approved subject to the aforesaid requirements. • • C:\WINDOWS\Desktop\Tom's File Cabinet\Correspondence\Sorgen Sprinkler System.doc 6/2/03