Loading...
HomeMy WebLinkAboutBLD03-078Waterman & Katz Building r 181 Quincy Street, Suite 301 Port Townsend, WA 96368 Phone: 360-379-5086 Fax 360-385-7675 CITY OF PORT TOWNSEND • ~1 L~ r~ CONSTRUCTION PERMIT & INSPECTION RECOKD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspectioli Issued: 5/5/03 Parcel Number: 968 500 027 Zoning: R-II Typc: ~~-N Occupancy: R-3 Nature of Work: C~~nstruct Single-family Dwelling with attached garage Owner: Steve & Linda Lockwood Conh•actar: TBD GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REQUIItED: Electrical Permit -Contact WA State Dept. of Labor & L~dustries 360-417-2702 RF(li TIR F.11 INCPF.f'TiONC APPR(~V F.1~/nATF. Permit Number: BLD03-078 Job Address: 4265 Jackman St. Total Occupant Load: 4/2 TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS ®~ ~/~ ~~ ,~ °l Setbacks Footings ____ Forms Reinforcement Interior Footings Porch footings and slab LIFER FOUNDATION a•.; ~~ ~.~_~ ~ -~_,~,',~#~~. ~.~ zr,Ir;- Stem Wall Forms Reinforcement Vents - 11 required Anchor Bolts & Washers Post to Foundation Wall Positive Connection - _._..._ Holdowns - 4 { ,_~ t ~ r r CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 4 Building Pern~it #03-078 REQUIRED INSPECTIONS APPRnVF,n/I~ATF. FLOOR FRAMING NOTE: Engineered BCI f loon plan on-site and available to the Inspector at inspection time Joists Blocking Positive Connections ~ ~ ~ ~j~~} ~ Treated Wood to Concrete Anchor Bolts & Washers PLUMBING Rough-In (D-V-T & Clean outs) Water Supply ~ -l~Z7l~ 3 `7 Water Hammer Arrestors LPGas Supply Hose Bibbs - backflow protection required Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater R-l0 under if electric Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, terminate 6" -24" above ground MECHANICAL LPG Stove /Fireplace - provide specs on-site Manufacturer's installation instructions to be on-site @ time of inspection. Source Specific Exhaust Fans @ bathrooms (SOcfm), laundry room, (50 cfm) and kitchen (100 cfm) Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and-terminus (located 3' from openings) - Whole house fan -bathroom i Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 Building Permit #03-078 REQUIRED INSPECTIONS r • APPROVED/DATE FRAMING Walls -framing per shear wall designations Shear walls Shear Panel Blocking Roof -Engineered truss plan to be on site at inspection Truss positive connection Attic ventin able & eave r ~~ Posts, beams and headers ~ ,.. Windows -escape Windows -safety glazing Window U-factor - 0.40 or better Door U-factor - 0.20 or better Skylight U-factor - 0.58 or better NFRC sticker must be on windows, doors & skylights at time of inspection Air Seal Fresh Air Intake -window ports Fireblocking Weather Resistive Barrier '' ~ - l;' ,~ .~,r,.'~~~ ,~ ~ ~~. ,,~, ~ INSULATION --~ -~ _] oor R-30 ~~-~ ~..--~-- _~ "__a ails (R-21) -- --- i k., `~~ °~ ~ Z S f b3 ~ ~ , Ceiling (R-38) ~ Baffles +. Vapor Barrier -paint --.--_.___________. ____~~--.-------~~-.~-- mi black poly in crawl space ^~,_____ ~ ~_ DRYWALL NAILING ~ Walls y, ` ~ '~~~ r'~ ;- ~ Ceiling Interior braced wall panel _ ~arage~Iouse~ccupancy""~~ar~tion ~~-_ ___- _ FINAL Public Works Sign-off House Numbers - 5" numbers Plumbing LPG Mechanical/Heating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Stairs, Decks & Landings Final - buildin Call 48 hours before you dig for utility line locates. 1-800-424-5555 Page 3 of 4 Building Permit #03-078 GENERAL CONDITIONS 1. Contractors working on this project are required to have :~ Labor & Industries contractor's registration number and a City business lice~lse. Failure to provide proof of this documentation prior to work may result in job shut clown while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site,and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mctlching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. ' 5. Re-inspection is required after inspection report corrections are completed. ~J 6, The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. Eo~• Public Works inspection call 385-2294. A minimum of twenty-four hours notice is repaired. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility lime locates 1-800-424-5555 Page 4 of 4 Waterman & Katz Building 181 Quincy Street, Snite 301 Port Townsend, WA 98368 Phone:361~379-5086 Fax3b0-3857675 • • CITY OF PORT TOWNSEND ' CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: 03-~7gR-1 Issued: 5/20/03 Parcel Number: 968 500 027 Job Address: 4265 Jackman St. Zoning: R-II Type: V-N Occupancy: RR=3 Total Occupant Load: 4/2 Nature of Work: Revision #1: increase size of house 69 square feet: length to 40', depth to 30' Owner: Steve & Linda Lockwood Contractor: Steve Cooper Construction - STEVECC120P1 GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 NOTE: See original permit for ALL inspections GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 2 Building Permit #03-078R-I 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is reauired. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2