CONSTRUCTION PERMIT & INSPECTION RECOKD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspectioli
Issued: 5/5/03 Parcel Number: 968 500 027
Zoning: R-II Typc: ~~-N Occupancy: R-3
Nature of Work: C~~nstruct Single-family Dwelling
with attached garage
Owner: Steve & Linda Lockwood Conh•actar: TBD
GENERAL CONDITIONS APPLY: See last page
SEPARATE PERMITS REQUIItED:
Electrical Permit -Contact WA State Dept. of Labor & L~dustries 360-417-2702
RF(li TIR F.11 INCPF.f'TiONC APPR(~V F.1~/nATF.
Permit Number: BLD03-078
Job Address: 4265 Jackman St.
Total Occupant Load: 4/2
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS ®~ ~/~ ~~ ,~
°l
Setbacks
Footings
____
Forms
Reinforcement
Interior Footings
Porch footings and slab
LIFER
FOUNDATION a•.; ~~ ~.~_~ ~ -~_,~,',~#~~. ~.~ zr,Ir;-
Stem Wall
Forms
Reinforcement
Vents - 11 required
Anchor Bolts & Washers
Post to Foundation Wall Positive Connection -
_._..._
Holdowns -
4 {
,_~ t ~ r r
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 4
Building Pern~it #03-078
REQUIRED INSPECTIONS APPRnVF,n/I~ATF.
FLOOR FRAMING
NOTE: Engineered BCI f loon plan on-site and
available to the Inspector at inspection time
Joists
Blocking
Positive Connections
~ ~ ~ ~j~~} ~
Treated Wood to Concrete
Anchor Bolts & Washers
PLUMBING
Rough-In (D-V-T & Clean outs)
Water Supply ~ -l~Z7l~ 3
`7
Water Hammer Arrestors
LPGas Supply
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
R-l0 under if electric
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground
MECHANICAL
LPG Stove /Fireplace - provide specs on-site
Manufacturer's installation instructions to be on-site
@ time of inspection.
Source Specific Exhaust Fans @ bathrooms (SOcfm),
laundry room, (50 cfm) and kitchen (100 cfm)
Environmental Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and-terminus (located 3'
from openings) -
Whole house fan -bathroom
i
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
Building Permit #03-078
REQUIRED INSPECTIONS
r
•
APPROVED/DATE
FRAMING
Walls -framing per shear wall designations
Shear walls
Shear Panel Blocking
Roof -Engineered truss plan to be on site at inspection
Truss positive connection
Attic ventin able & eave r ~~
Posts, beams and headers ~ ,..
Windows -escape
Windows -safety glazing
Window U-factor - 0.40 or better
Door U-factor - 0.20 or better
Skylight U-factor - 0.58 or better
NFRC sticker must be on windows, doors & skylights
at time of inspection
Air Seal
Fresh Air Intake -window ports
Fireblocking
Weather Resistive Barrier
''
~ -
l;' ,~ .~,r,.'~~~ ,~ ~ ~~. ,,~, ~
INSULATION --~ -~
_]
oor R-30 ~~-~ ~..--~-- _~
"__a
ails (R-21) -- --- i k., `~~ °~ ~ Z S f b3
~ ~ ,
Ceiling (R-38) ~
Baffles +.
Vapor Barrier -paint --.--_.___________. ____~~--.-------~~-.~--
mi black poly in crawl space ^~,_____ ~ ~_
DRYWALL NAILING ~
Walls y, ` ~
'~~~ r'~ ;- ~
Ceiling
Interior braced wall panel
_
~arage~Iouse~ccupancy""~~ar~tion ~~-_ ___- _
FINAL
Public Works Sign-off
House Numbers - 5" numbers
Plumbing
LPG
Mechanical/Heating
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Stairs, Decks & Landings
Final - buildin
Call 48 hours before you dig for utility line locates.
1-800-424-5555
Page 3 of 4
Building Permit #03-078
GENERAL CONDITIONS
1. Contractors working on this project are required to have :~ Labor & Industries
contractor's registration number and a City business lice~lse. Failure to provide proof of
this documentation prior to work may result in job shut clown while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site,and
inspected prior to beginning construction; ca11385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mctlching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections. '
5. Re-inspection is required after inspection report corrections are completed.
~J
6, The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. Eo~• Public Works inspection call
385-2294. A minimum of twenty-four hours notice is repaired. Public Works approval
must be received prior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility lime locates
1-800-424-5555
Page 4 of 4
Waterman & Katz Building
181 Quincy Street, Snite 301
Port Townsend, WA 98368
Phone:361~379-5086 Fax3b0-3857675
•
•
CITY OF PORT TOWNSEND
' CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: 03-~7gR-1 Issued: 5/20/03 Parcel Number: 968 500 027
Job Address: 4265 Jackman St. Zoning: R-II Type: V-N Occupancy: RR=3
Total Occupant Load: 4/2 Nature of Work: Revision #1: increase size of house
69 square feet: length to 40', depth to 30'
Owner: Steve & Linda Lockwood Contractor: Steve Cooper Construction -
STEVECC120P1
GENERAL CONDITIONS APPLY: See last page
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
NOTE: See original permit for ALL inspections
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 2
Building Permit #03-078R-I
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is reauired. Public Works approval
must be received prior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Call 48 hours before you dig for utility line locates
1-800-424-5555