HomeMy WebLinkAboutBLD03-077r
t
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: 360-379-5086 Faa 360J85-7675
CITY OF PORT TO~`~NSEND
.~ ~ , t
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-077 Issued: 04/22/03 Parcel Number: 936 903 201
Job Address: 1392 Rose Street Zoning: R-II Type: V-N Occupancy: R-3
Total Occupant Load: 5 Nature of Work: Construct Single-family Dwelling
Owner: Steven and Lisa Anderson Contractor: Same as Uwner
GENERAL CONDITIONS APPLY: See last page
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RF.(1TTTRF.TI TNCPF.f'TT(1NC
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS ~
Setbacks
Footings
~'~- -°~ ~~
Forms
R i ment
Porch Piers
Deck
ER `
FOUNDATION ~'~
~r
~
' ' ~`
.~~
'
Stem Wall ~
y
- _ ~,
-
a Y,r;Sf
~~ ~J F
Forms
Reinforcement
Anchor Bolts & Washers
Engineered Holdowns
Waterproofing
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 4
RE UIRED INSPECTIONS
E .
Building Permit #03-077
APPROVED/DATE
GROUNDWORK PLUMBING
Pressure Test
Pipe Joints Exposed Q~_ i~ g14 f ~3
Pipe Bedding
SLAB
Insulation-R-IOfully insulated 7 ,/~
~ ~'~~~ ~ ~ ~ ,- '1
~
'
"
)
Hydronic Heat Tubing ~
_
.,,
~
FLOOR FRAMING
NOTE: Engineered BCI floor plan on-site and
available to the Inspector at inspection time
Hydronic Heat Tubing
Joists
Engineered Floor Beams
Blocking
Positive Connections
Treated Wood to Concrete
Anchor Bolts & Washers
PLUMBING
Rough-In (D-V-T & Clean outs)
Water Supply
Water Hammer Arrestors
Gas Supply
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
Water HeaterBoiler -manufacturer's installation
instructions shall be on-site
Drain to exterior
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground
MECHANICAL
Boiler
Whole House Fan -Bath
Laundry room, (50 cfm) and kitchen (100 cfm)
Environmental air exhaust ducting (with backdraft
dampers), insulation (R-4) and terminus (3' from
openings into, building)
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
.~
t
r
i
i
1?Ff1TTTT2FTl TNCPF.f TTf1NC
Building Permit #03-077
APPROVED/DATE
1\L V11\1I Z/ f
FRAMING
Walls ;, _-.-~~ , -_,
-~~
- _
~'
a
Engineered Shear Walls ~ ~~
Roof x
Rafter positive connection
Attic venting -ridge & eave ,
~
Engineered Posts, beams and headers `,, ~`
Attic Access
Windows -escape
Windows -safety glazing ~
Window U-factor - 0.40 or better ~.
Door U-factor - 0.20 or better
Air Seal
Fresh Air Intake -wall ports
Fireblocking
Weather Resistive Barrier r `'
a
INSULATION
i
Floor (R-30 )
Walls (R-21)
Ceiling (R-30/R-38)
_~affles
.
~.-Y...~ _ ., _ .
Vapor~arner -paint
DRYWALL NAILING
Walls ~_
Ceiling _
~~
Enclosed Usable Space under Stairs
FINAL ~ ~ ~ ;.'~ : _ `, ~
- ,,_ ,f,~ ~-°
i;;~
y
Public Works Sign-offer `` ~
5"
b
N
b
H ,~,
ers. ~
num
ers -
ouse
um
T
R
Plumbing ~=~' , f~ ~
~
,~
..~
~
-~
~
r v. ~".~~ ~ -~ _~ - ~ ~_,. ,~'--~°~ ~ ,
~,~
"
,
.
MechanicaUHeating ~ ~ {~ ,
_
-ter ~ 7~
l . ~~-
Insulation Certificate ~- f ~` ~ <
% . w ',_ - `~_. {.~-~~ ~~-~
Vapor Barrier Paint Certificate ~ ~
~```~- _
Smoke Detectors ,
~~ "~
~
Stairs, Decks & Landings =` r
y
Final -Building
-~
~ -'r"
_ '
~~
~
~.
,°
(
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
~~
,~
~- ..
Building Permit #03-077
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (1'ESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your'project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is reauired. Public Works approval
must be received prior to scheduling the Buildins Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project..
8. All building permits ezpire if no progress has been made within sia months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call'48 hours before you dig for utility line locates
1-800-424-5555
Page4of4
_ - ~~