Loading...
HomeMy WebLinkAboutBLD03-076 • Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360) 379-3208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-076 Issued: 04/01/03 Parcel Number: 988 800 502 Job Address: 510 Lawrence Street Zoning: R-II Type: V-N Occupancy: RR=3 Nature of Work: Remove existing cedar roofing on house; install sheeting, felt and composition shingles, and provide adequate ventilation. Owner: Roby Robichaux Contractor: Hope Roofin - HOPER**043N7 (385-5653) NOTE: Roofing materials to be installed per manufacturer's specifications and UBC Chapter 15. GENERAL CONDITIONS APPLY -SEE LAST PAGE RF.(IITTRF.II TNCPF.fTT(1NC • • APPR(1VFn/nATF DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state and federal laws. SHEATHING Nailing requires 8d @ 6" o.c. edges & 12" o.c. field or 1 3/a" staples @ 6" o.c. edges and field. ROOF VENTi:NG Ridge and Soffit Venting Net free ventilation area shall not be less than 1 square foot per 150 square feet of the area of the space ventilated, unless 50% of the required vent opening area is provided in the upper portion of the roof and therefore the rate maybe reduced to 1 square foot of venting to 300 square feet of area vented. Openings shall be covered with corrosion resistant'/4" mesh. ROOFING Install all roofing material Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit #BLD03-076 FINAL Smoke detectors required per 1997 UBC (battery powered OK) House Numbers - 5" numbers of contrasting color posted near main entrance of house and visible from street per City Ordinance Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. If temporary erosion and sediment control (TESC) measures are required, they shall be installed on- site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; a Certif-cate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your buildiug permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department (a~ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2