Loading...
HomeMy WebLinkAboutBLD03-072q Waterman & Katz Building ! 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: 360-379-5086 Fax 360-385-7675 CITY OF PORT TOWNSEND s • CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Issued: 04/23/03 Parcel Number: 968 500 004 Zoning: R-II Type: V-N Occupancy: R_3 Nature of Work: Construct Single-family Dwelling with attached garage Owner: Tom Higgins Contractor: Terhune Custom Homes-TERHCH984MA GENERAL CONDITIONS APPLY: See last page SEPARATE .PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RFCITTTRFTI TNCPF.f TT(1NC APPR(1VF.1)/IIATF Permit Number: BLD03-072 Job Address: 4195 Holcomb St. Total Occupant Load: 5/2 TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS ~s Setbacks O ~ f'"`- Footings Ste' i S-o3 Forms Reinforcement S , Zo_ o'~ nterior Footin s Porch Piers Dec LIFER o ~ CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 5 Building Permit #03-072 ~' RF.OI TIRED iNSPF.CyTIONS APPROVED/DATE FOUNDATION Stem Wall ~ Forms Reinforcement Vents - 13 required ~~ Anchor Bolts & Washers ~- v~ Post to Foundation Wall Positive Connection $-2 Engineered Holdowns SLAB Interior footings Anchor Bolts Engineered Holdowns FLOOR FRAMING NOTE: Engineered LPI floor plan on-site and available to the Inspector at inspection time Joists ~. ~ (o/131b?j Blocking Positive Connections Treated Wood to Concrete Anchor Bolts & Washers PLUMBING Rough-In (D-V-T & Clean outs) ~~ ~--1 /Z~~3 / Water Supply Water Hammer Arrestors Gas Supply O g~ -l p 3 ose Sib-lis - ac ow protection requir Pipe Insulation (R-3) n` a ~~'^y ~~~ tcs~' ~~. ~'1" ~ l~ ` C ~ ` °~ Pressure Reduction Valve if> 80 psi Water Heater R-10 under if electric Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, terminate 6" -24" above ground Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 5 Building Permit #03-072 °• ,i' ' RF.(lT1TRF.11 TN~PF.CTI(~N~ APPROVED/DATE • MECHANICAL LPG Stove /Fireplace - provide specs on-site Electric Heat Pump Manufacturer's installation instructions to be on-site @ time of inspection. Ducts & Duct Insulation -Supply/fresh air ducts in conditioned space: R-4; heating ducts in unconditioned space: R-8 Whole House Ventilation HVAC Integrated Fresh Air 7" Smooth Duct minimum Terminal Element - 8" Clock timer on furnace fan Other than motorized damper requires letter of certification for flow rates. Whole house fan -HVAC Integrated option Source Specific Exhaust Fans @ bathrooms (SOcfm), laundry room, (50 cfm) and kitchen (100 cfm) Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) FRAMING Walls -framing per shear wall designations Engineered shear walls .- ---a ,~•X }-fir-,~ S~G•~Q~,,«; rt((S ~~~ ~'~~.., -7 ~ 1. ~''U3 Interior shear walls Shear Panel Blocki~ .__-_ ,~~-- ,_----___.__ __.__ __---__-__ Roof -Engineered truss plan to be on site at ~ , '~~r - , - , ~,, ., i ~ ` ~~ f '' inspection __ " ~` rus`s posit o nection Attic venting -ridge & cave Posts, beams and headers Windows -escape Windows -safety glazing Window U-factor - 0.40 or better _ ~ , pj r` ~ ' 1'~ ~`~~ ~ Door U-factor - 0.20 or better ~a. - ~ '- t Skylight U-factor - 0.58 or better NFRC sticker must be on windows, doors & Tights at time of inspection Air Seal Fresh Air Intake -Integrated Fireblocking Weather Resistive Barrier Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 5 REQUIRED INSPECTIONS Building Pennut #03-072 S - R tw V APPROVED/DATE INSULATION ~~ ~ 8f l~~ l Floor (R-30) Walls R-21 ~ Ceilin R-38 Baffles 1 b Vapor Barrier -paint mt ac po y ~n craw space ©~ ~'~1?~D,3 ~( DRYWALL NAILING Walls Ceiling ~ ~ ~~Z,~/per Interior braced wall panel r Garage House Occupancy Separation FINAL Public Works Sign-off LPG House Numbers - 5" numbers Plumbing ~ Mechanical/Heating Insulation Certificate ~~ Vapor Barrier Paint Certificate ~/` L Fresh Air Certification for Integrated System ~ ~ " E Smoke Detectors ~~ Stairs, Decks & Landings Final -building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration .number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, haldowns, sheathing, and alternate braced wail panels (ABWP) require inspection prior to cover. Ca1148 hours before ou di for utili line locates Y g tY 1-800-424-5555 Page 4 of 5 Building Permit #03-072 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspectio~>i per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. PO5T THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 5 of 5