Loading...
HomeMy WebLinkAboutBLD03-071~* • • • Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone:360-379-3208 Fa:360385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Catl 385-2294 for Inspection Permit Number: BLD03-~71 Issued: 04/22/03 Parcel Number: 001 034 022 Job Address: 390 29th Street Zoning: R-II Type: V-N Occupancy: RR=3 Totat Occupant Load: 3 Nature of Work: Set New Manufactured Home, and build on-site deck and Harkins slab. Owner: Janet Dallett Contractor: Prestiee Properties - PRESTPI066CM ****Installer: See Attached Installer Tag**** GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RFnTTTRFT) TN4PF(~TTnN~ APPRnVF,n/DATF TEMP EROSION & SEDIMENT CONTROL See general condition #2 and attached details with Street Development Permit SDP03-O15 Silt Fence as needed Drive OffMat to prevent sediment from leaving the site FOOTINGS/SLAB Setbacks ~ Forms ~ ~~3 Reinforcement S. ~o FLOOR FRAMING (prior to skirting) Anchors ~~ ,~ ,, ~.Z ~ ~ , Steel Support Piers -Load-stamped and installed per manufacturer's installation manual; clearance of 18 "min. from lowest point of I-beam and the ground or footing for min. of 75% of area under home w/ 12 "min. elsewhere unless installation manual specifies; otherwise area around home graded to provide runoff away from home Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 Permit #BLD03-071 RF,niTIRF,n IN~PF.C'TinN4 APPRf1VF11/iIATF. PLUMBING: Water Supply -Main shut-off valve (port or ball valve) installed in water supply piping prior to connection to home, min. j/4 "diameter, same as supply pipe Pressure Reduction Valve if > 80 psi Hose Bibs (backflow protection required) Pipe Insulation -Outside & in crawl space Pressure Test -100 p.s.i. for IS minutes Pressure relief valve drain - to exterior of skirting, exhaust dowmvard between 6"and 24"above ground Drainage Piping -sloped min. '/~' per foot MECHANICAL Ducts & Duct Insulation Dryer Exhaust -vented to outside. Extension into crawl space regtcires venting through skirting with no dips; follow dryer marrufaciurer's instructions; total combined length of ducting not to exceed 14' w/ 2-90° elbows FRAMING Deck off of Utility Room ~ ~ - ~ 3 ~ c VAPOR BARRIER 6 mil black poly ground cover (not required where area under Name is concrete slab floor with a minimum thickness of 3-%2 inches) FINAL Public Works Sign-Off Electrical (L & I) Sign-Off - House Number -minimum 5" numbers f~/ Plumbing \ ~ Mechanical Final -Building h ' " oles ar gaps greater than No allowed in skirting. /. Crawl space ventilation per installation manual @ ~ ?j 1/150 (12 required); located close to corners, on at least two opposing sides for cross ventilation. /~ Crawl space access must provide access to all areas under home; minimum 18" x 24 "; covered with vinyl, pressure treated wood or metal. r C7 Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 1 Pern~it #BLD03-071 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. Z. Temporary erosion and sediment control (TE5C) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any. and all deficiencies noted ~ by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done 6y the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3