HomeMy WebLinkAboutBLD03-069r r;
r
•
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: 360-379-5086 Fa:360-385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD~3-069 Issued: 05/22/03 Parcel Number: 001 024 044
Job Address: 1221 Tyler St. Zoning: R-II Type: V-N Occupancy: RR=3
Total Occupant Load: 14 Nature of Work: Add basement and addition to
existing residence.
Owner: John Colbert & Itsumi Ishitani Contractor: Townsend Builders, Inc.
TOWNSBI088JA
GENERAL CONDITIONS APPLY: See last page
SEPARATE PERMITS REQUIltED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
AFf1TTTRFII TNCPF(~'TT(lNc
A PPR (1VF.n/i) A TF.
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS i `~-~`,=; . ~ ,~ {-, -'k:__ ~~~-e~.--a ~'"~F,r,~-. t c,ftr_>~,
Setbacks ~ ~: •, £~ 5 , ,,: -- ~- ~=~~-,~4r~ - ~ ~ ~~f'c~ ~*~'~-~
~.
~ .-
`
R
Footings ~
~~,, ~
,,
~
~ l
Re'rlforcement ~ r
~ ~~
G
r~'~ ~~~ ~ ~ ~ }
~
~"
~
Interior Footings ~ ~ ^
"
~ (~ ~_
Porch Piers \ ~'
Deck
LIFER ~ ~.
GROUNDWORK PLUMBING
~
Pressure Test e r
,,,~ ~ r
~ ~~ ~ .
Pipe Joints Exposed -.-, ~ , ~ffE>€--, ~ -- ~,~~ ~ ~/zZ~~;
Pipe Bedding
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 4
0
Building Permit #03-069
:G•
REQUIRED INSPECTIONS APPROVED/DATF
SLAB
Interior footings
Insulation - R-10 fully insulated ~ .1 /Z' 1,.53
l `
`'
Hydronic Heat Tubing ~
FLOOR FRAMING ---~ ~, ,
Hydro 'c Heat Tubing
Joists I .i'
Blocking
Positive Connections
Treated Wood to Concrete
Anchor Bolts & Washers
PLUMBING
Rough-In (D-V-T & Clean outs)
~Z( ~?
~ (
Water Supply '
O
Water Hammer Arrestors
as Supply
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
Water Heater
R-10 under if electric
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground
MECHANICAL
Boiler -manufacturer's installation instructions
shalt be on-site at time of inspection
Whole House Fan -Utility Room
Source Specific Exhaust Fans @ bathroom (SOcfin),
laundry room, (50 cfin) and kitchen (100 cfin)
Environmental air exhaust ducting (with backdraft
dampers), insulation (R-4) and terminus (3' from
openings into building)
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
a
,~~ RF.(~T1TRF.T) TN~PF.CTI<nN4
i
r
Building Permit #03-069
APPROVED/DATE.
FRAMING ~°-,~ , -~,~ ''~< , :~ ,~ ; -,' ~ ~
,7
Walls
Roof -Engineered truss plan to be on site at
~'
inspection
Truss positive connection
~
Rafter positive connection ,~ ~
Attic venting -ridge & eave '-
Posts, beams and headers -per architectural design
Shear walls -per architectural design
Holdowns -per architectural design ,
Attic Access
Windows -escape
Windows -safety glazing
Window U-factor - 0.40 or better
Door U-factor - 0.20 or better
Skylight U-factor - 0.58 or better
NFRC sticker must be on windows, doors &
skylights at time of inspection ~'~
Air Seal
Fresh Air Intake -window ports
Fireblocking
Weather Resistive Barrier
INSULATION
Floor (R-30 )
Walls (R-21)
Ceiling (R-38 )
Baffles
Vapor Barrier -paint
DRYWALL NAILING
Walls
Interior braced wall panels -per architectural design
Ceiling
FINAL
Public Works Sign-off
Fire lace flue to be ino erable
p p
r
LPG ~ .. , r `, .~,. f , - 4, ~,,t= , , ,. ,~..--- ~
~
House Numbers 5" numbers
Plumbing
Mechanical/Heating
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Stairs, Decks & Landings -
Final - Buildin
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
4
Building Petmit #03-069 ~ ~ ~ _
~~ ,
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down white this is accomplished.
Z. Temporary erosion and sediment control (TESL) measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works approval -~.
must be received prior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within siz months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4