HomeMy WebLinkAboutBLD03-066Waterman ~ Katz Building
181 Quincy Street, Suite 301
Port Towasend, WA 98368
Phone: (360)399-3208 Fax: (360)385-7695
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD03-066 Issued: 04/17/03 Parcel Number: 997501004
Job Address: 2978 Jackman Street Zoning: R-11 Type: V-N Occupancy: R-3/U-1
Occupant Load: 4/1 Nature of Work: Construct single-family residence with garage
Owners: Kimball & Landis LLC Contractor: Same as Owner- KIMBALL996D3
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: Hours of construction shall be limited to the hours of 7:00 a.m. to 6: 00 p.m. ,Monday through
Friday, and prohibited on weekends and national holidays
•
REQUIRED INSPECTIONS
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving the site
FOOTINGS -per sheet 3.2
Setbacks
Footings
Interior Footings
Forms
Reinforcement
Porch Footings
Porch Plinth
LIFER
~.
SLAB a .w. ~ • ' t ~*6 ~'. ~, ~,+~,~,. (. { t..:'~? p~._ .. " ~~ ~ 1 ! 'f~ ~r
R-10 @ insulated slab '-
Interior Footings
Reinforcement
Engineered Holdowns for Simpson Shear Wall Panels
APPROVED/DATE
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
Permit # BLD03-066
RF n11TRFn T1V4PF.("TT(~N4 A PPR nVFn m e ~rF
FOUNDATION ~xc~'r-6~~~ O
Stem Wall
Forms
~ `2 ~- 03
Reinforcement C3) ~ ~ ~~l~b 3
Anchor Bolts & Washers
Engineered Holdowns
Foundation Vents - 7 required
FLOOR FRAMING -engineered BCI plan shall be on-site
at time of inspection
Foundation Pony Wall
Positive Connection pony wall-to-fdn. wall
Joists
Ledger per plan sheet 3.1
Blocking
Shield under Posts @ porch
Positive Connections
Treated Wood to Concrete
Anchor Bolts & Washers
Crawl Access
PLUMBING:
Rough-In (D-V-T & Clean outs}
Water Supply
Gas Supply
Water Hammer Arrestor @ clothes & dishwasher
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if > 8U psi
Water Heater
Seismic Restraint -strap tank @ 1/3 points
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
R-10 under slab per plans
MECHANICAL
LPG Stove
Whole House Fan @ bathroom
Kitchen, Bathroom 1, and Laundry Fans
Environmental Air Exhaust ducfing (w/ backdraft dampers),
insulation (R-4) and terminus (located 3' from openings)
1
J
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page2of4
Permit # BLD03-066
RF.(~TITRFT) TN~PF.(,'TTnNS APPROVED/DATE
•
FRAMING
Walls
~
;~~ -~ /"~ -,%~-
Engineered Shear Walls ~,•~~~ r~ G,~,~~_ t . , ; ~~ ~ . -
Ceiling/Roof
Engineered Posts, Beams & Headers
DF#1 members @ porch
Blocking
Rafters ~
..~,r,.
R 1` . ~~~1 ~ t~
Rafter Positive Connection
Truss Framing -engineered truss plan shall be on-site at
time of construction
Truss Positive Connection
Roof Venting -ridge and eave
Windows -escape
Windows -safety glazing
Windows Ufactor - .40 or better; .20 or better for solid doors
NFRC window sticker must be on windows & doors
Skylights U-factor - .58 or better
Fresh Air Intake (Window Ports)
Air Seal
Fire Blocking _ - _ ___
Weather Resistive Barrier
,~
INSULATION - r - r. ~~, I ~, ~~
~
-
Floor (R-30 ) . __
Walls (R-21 )
Ceiling (R-38/R-30 ~
- --- - ~ -
VaporBarrier: paint
~~_~ __ __ .._----________..__^ _.-_----- _
~a~T-es ~ I
DRY WALL NAILING
Walls
Engineered Shear Walls -, ~ ~ ~', : , ~~,
~ Fl
Ceiling ~~
Enclosed Usable Space under Stairs
Garage/House Occupancy Separation
FINAL
',,
Public Works Sign-Off ~ ,,.J
House Numbers - 5" minimum '' `
;
Plumbing ~
Mechanical
Vapor Barrier Paint Certificate
Insulation Certificate
Smoke Detectors
Final -Building •
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Permit f1 BI D03-066
1. Contractors working on this project are required to.have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to
beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall
be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum
of twenty-four hours notice is required Public Works approval must be received prior to scheduling the
Building Department's final inspection,
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done by
the Building Department within one year. Call for at least one inspection per year to keep your building
permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4
Waterman & Katz Building
181 Quincy Street. Suite 301
Port Townsend. WA 98368
Phone: (360) 3793208 Fax: (360) 385-'7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD03-066R-1 Issued: 06/05/03 Parcel Number: 997501004
Job Address: 2978 Jackman Street Zoning: R-11 Type: V-N Occupancy: R-3/U-1
Occupant Load: 4/1 Nature of Work: R-1: Move attached ~ara~e to south 4 feet; adjust ~ara~e elevation;
revise windows; add skyli~ht to F-1; revise porch and dormer roof framing to hip and shed respectively
Owners: Kimball & Landis LLC Contractor: Same as Owner - KIMBALL996D3
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: Hours of construction shall be limited to the hours of 7:00 a. m. to 6:00 p. m. ,Monday through
Friday, and prohibited on weekends and national holidays
i RE UIRED INSPECTIONS APPROVED/DATE
See new sheets 9.2 and 9.3 for additional framing details;
refer to original inspection record for required inspections
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to
beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall
be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Perntit # BLD03-066R-1
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum
of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the
Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done by
the Building Department within one year. Call for at least one inspection per year to keep your building
permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2