Loading...
HomeMy WebLinkAboutBLD03-066Waterman ~ Katz Building 181 Quincy Street, Suite 301 Port Towasend, WA 98368 Phone: (360)399-3208 Fax: (360)385-7695 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-066 Issued: 04/17/03 Parcel Number: 997501004 Job Address: 2978 Jackman Street Zoning: R-11 Type: V-N Occupancy: R-3/U-1 Occupant Load: 4/1 Nature of Work: Construct single-family residence with garage Owners: Kimball & Landis LLC Contractor: Same as Owner- KIMBALL996D3 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 NOTE: Hours of construction shall be limited to the hours of 7:00 a.m. to 6: 00 p.m. ,Monday through Friday, and prohibited on weekends and national holidays • REQUIRED INSPECTIONS TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS -per sheet 3.2 Setbacks Footings Interior Footings Forms Reinforcement Porch Footings Porch Plinth LIFER ~. SLAB a .w. ~ • ' t ~*6 ~'. ~, ~,+~,~,. (. { t..:'~? p~._ .. " ~~ ~ 1 ! 'f~ ~r R-10 @ insulated slab '- Interior Footings Reinforcement Engineered Holdowns for Simpson Shear Wall Panels APPROVED/DATE Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Permit # BLD03-066 RF n11TRFn T1V4PF.("TT(~N4 A PPR nVFn m e ~rF FOUNDATION ~xc~'r-6~~~ O Stem Wall Forms ~ `2 ~- 03 Reinforcement C3) ~ ~ ~~l~b 3 Anchor Bolts & Washers Engineered Holdowns Foundation Vents - 7 required FLOOR FRAMING -engineered BCI plan shall be on-site at time of inspection Foundation Pony Wall Positive Connection pony wall-to-fdn. wall Joists Ledger per plan sheet 3.1 Blocking Shield under Posts @ porch Positive Connections Treated Wood to Concrete Anchor Bolts & Washers Crawl Access PLUMBING: Rough-In (D-V-T & Clean outs} Water Supply Gas Supply Water Hammer Arrestor @ clothes & dishwasher Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if > 8U psi Water Heater Seismic Restraint -strap tank @ 1/3 points Pressure relief valve drain to exterior, terminate 6" - 24" above ground R-10 under slab per plans MECHANICAL LPG Stove Whole House Fan @ bathroom Kitchen, Bathroom 1, and Laundry Fans Environmental Air Exhaust ducfing (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from openings) 1 J Call 48 hours before you dig for utility line locates 1-800-424-5555 Page2of4 Permit # BLD03-066 RF.(~TITRFT) TN~PF.(,'TTnNS APPROVED/DATE • FRAMING Walls ~ ;~~ -~ /"~ -,%~- Engineered Shear Walls ~,•~~~ r~ G,~,~~_ t . , ; ~~ ~ . - Ceiling/Roof Engineered Posts, Beams & Headers DF#1 members @ porch Blocking Rafters ~ ..~,r,. R 1` . ~~~1 ~ t~ Rafter Positive Connection Truss Framing -engineered truss plan shall be on-site at time of construction Truss Positive Connection Roof Venting -ridge and eave Windows -escape Windows -safety glazing Windows Ufactor - .40 or better; .20 or better for solid doors NFRC window sticker must be on windows & doors Skylights U-factor - .58 or better Fresh Air Intake (Window Ports) Air Seal Fire Blocking _ - _ ___ Weather Resistive Barrier ,~ INSULATION - r - r. ~~, I ~, ~~ ~ - Floor (R-30 ) . __ Walls (R-21 ) Ceiling (R-38/R-30 ~ - --- - ~ - VaporBarrier: paint ~~_~ __ __ .._----________..__^ _.-_----- _ ~a~T-es ~ I DRY WALL NAILING Walls Engineered Shear Walls -, ~ ~ ~', : , ~~, ~ Fl Ceiling ~~ Enclosed Usable Space under Stairs Garage/House Occupancy Separation FINAL ',, Public Works Sign-Off ~ ,,.J House Numbers - 5" minimum '' ` ; Plumbing ~ Mechanical Vapor Barrier Paint Certificate Insulation Certificate Smoke Detectors Final -Building • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Permit f1 BI D03-066 1. Contractors working on this project are required to.have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduling the Building Department's final inspection, 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4 Waterman & Katz Building 181 Quincy Street. Suite 301 Port Townsend. WA 98368 Phone: (360) 3793208 Fax: (360) 385-'7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-066R-1 Issued: 06/05/03 Parcel Number: 997501004 Job Address: 2978 Jackman Street Zoning: R-11 Type: V-N Occupancy: R-3/U-1 Occupant Load: 4/1 Nature of Work: R-1: Move attached ~ara~e to south 4 feet; adjust ~ara~e elevation; revise windows; add skyli~ht to F-1; revise porch and dormer roof framing to hip and shed respectively Owners: Kimball & Landis LLC Contractor: Same as Owner - KIMBALL996D3 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 NOTE: Hours of construction shall be limited to the hours of 7:00 a. m. to 6:00 p. m. ,Monday through Friday, and prohibited on weekends and national holidays i RE UIRED INSPECTIONS APPROVED/DATE See new sheets 9.2 and 9.3 for additional framing details; refer to original inspection record for required inspections GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Perntit # BLD03-066R-1 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2