Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD03-065
~ . ;~ Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-065 Issued: 04/17/03 Parcel Number: 997501001 Job Address: 2902 Jackman Street Zoning: R-11 Type: V-N Occupancy: R-3/U-1 Occupant Load: 4/I Nature of Work: Construct single-family residence with garage Owners: Kimball & Landis LLC Contractor: Same as Owner - KIMBALL996D3 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 NOTE: Hours of construction shall be limited to the hours of 7:00 a.m. to 6:00 p.m. ,Monday through Friday, and prohibited on weekends and national holidays REQUIRED INSPECTIONS APPR(IVF.n/nATF. TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS - per• sheet 3.2 Setbacks ~ ~ ~ 1~ Footings ~~; Interior Footings Forms (' j J-~ jy `~~' Reinforcement ~ Porch Footings Porch Plinth LIFER ~ ~°' ~'a_. ~ f ~ , ~ ;~. ,- ~1 ,/ f SLAB R-10 @ insulated slab Interior Footings Reinforcement - (2) #4 each way Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 REQUIRED INSPECTIONS APPRnVF,n/i)ATF. Permit # BLDCF-Od5 "^~ FOUNDATION Stem Wall ~G 5~7 fD3 Forms Reinforcement Anchor Bolts & Washers Ok ~ -'Z6-a3 AB Hol owns ~ ~ -`` g ~ --~~ a~ ~ ~ 3 FLOOR FRAMING -engineered BCI plan shall, be on-site at time of inspection Joists Beam Blocking ~! ~~~3 Shield under Posts Positive Connections Treated Wood to Concrete Anchor Bolts & Washers PLUMBING: Rough-In (D-V-T & Clean outs) Water Supply ~ ~~ ~~'l--'~ © O j Water Hammer Arrestor @ clothes & dishwasher ~ Hose Bibs ackflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater Seismic Restraint -strap tank @ 1/3 points ' Pressure relief valve drain to exterior, terminate 6" - 24" above ground R-10 under if electric MECHANICAL Whole House Fan @ bathroom -max. 75 CFM Kitchen Fan Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from openings) Call 48 hours before you dig for utility line locates 1-800-424-5555 Page2of4 ~. -9 REQUIRED INSPF.(^'TT(1NC Permit # BLD03.065 A PPi2 nv~ it m ~ rr~ FRAMING Walls Alternate Braced Wall Panels CeilinglRoof Posts, Beams & Headers Blocking Rafter Positive Connection ,~ ~, ; ~`t~ ~/~~~. ~ ~~~' µ ~ Roof Venting - -' ' Windows -escape Windows -safety glazing Windows Ufactor - .40 or better; .20 or better for solid doors NFRC window sucker must be on windows & doors at inspection time Fresh Air Intake (Window Ports) Air Seal Fire Blocking Weather Resistive Barrier INSUL.ATI.ON ~ _ loor - R-3 ,c: JG',~J ; /' .~ ~ ~fi s~r;~~c~.~ ~ c~jG/~/s/C~: ~. ~', ~ ~'~=' ~' , , Walls (R-21 , ~ E /~ / ~Ceilin 3 F/~ ,.~. ~ `~; {;,- ~' ,C'-3~~ _ t ~._ _~~ f'~?f=rte=-- VaporBarrier: paint ~~;;_, -."•~~; : r ~,.~,~ , ~ - ~' - c~ -- Baffles , .. __ . ,~ RY WALL NAILING 'Walls Ceiling Enclosed Usable Space under Stairs Garage/House Occupancy Separation FINAL Public Works Sign-Off ~,. ;: House Numbers - 5" minimum ° ~ ^ Plumbing ~ Mechanical - VaporBarrier Paint Certificate Insulation Certificate Smoke Detectors - Final -Building ~ ~ - ,~ r r Call 48 hours before you dig for utility line locates 1-800-424-5555 Page3of4 . : -., Permit # BLD03-065 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control .(TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc, once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and alI deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduling the Building Department's final inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-~ residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval rior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4