Loading...
HomeMy WebLinkAboutBLD03-064Waterman & Katz Building ,„,,._ ~ 181 Quincy Street, Suite 301 i Port Townsend, WA 98368 Phone: (360) 379-3208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection ~~ • Permit Number: BLD03-064 Issued: 05/06/02 Parcel Number: 948 318 404 Job Address: 1109 Rosecrans St. Zoning: R-2 Type: V-N Total Occupant Load: 2 Occupancy: R 3 Nature of Work: Construct New ADU attached to ezisting SFR Owner: Gerald F. Moch Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 UTi l1TT772Ti T1 7NC7~Ff''TTCINC A PPR (1VFn/n A TF, TEMP EROSION & SDM'T CONTROL See General Condition No. 2 & attached SDP 02-023 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks Footings t Forms ~- ~' ~ ~~ ~ ~ ~ Reinforcement ' '~ ' ~__ - " Interior Footings _ . Porch/Deck Piers LIFER FOUNDATION Stem Wall Forms Reinforcement Holdowns__ --- - _ _ ___ _ ~ _ _ _ ___ __ _-__ _ __..-- ~, Anchor Bolts & BP washers ~ x ' s T ~ '' !!! ~ ,~ ~~ Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 1 Pem»t # BLD03-064 " _, •- ti REQUIRED INSPECTIONS APPROVED/DATF PLUMBING: Rough-In (D-V-T & Clean outs) Water Supply Gas Supply Water Hammer Arrestor @ dishwasher Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground 18" A. F. F. R-10 under MECIiANICAL Whole House Fan - @ bath Kitchen Fan Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from openings} FRAMING fz- ~'-~2~t ~ G~ O ~ Z,,, Q~ Walls -one hour wall & ceiling per plans to separate garage/ADU Joists -engineered TJI plan shall be on-site at time of Inspection Holddowns Roof Blocking Rafter Positive Connections Roof Venting - eave and ridge vents Windows -escape Windows -safety glazing Windows Ufactor - .40 or better for unlimited glazing NFRC window sticker must be on windows & doors at inspection time Fresh Air Intake (Window Ports) Doors U-Factor - .20 or better Air Seal Fire Blocking Weather Resistive Barrier Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 Permit tl BLD03064 RF.OUIRED INSPECTIONS APPROVED/DATE INSULATION Floor (R-30 ) Walls (R-21) Ceiling (R-30) Vapor Barrier: paint Baffles DRY WALL NAILING Walls Ceiling Garage/ADU Occupancy Separation FINAL House Numbers @ ADU - 5"minimum Plumbing Mechanical/Heating Deck/Stairs/Landings Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors final -Building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 Pmnit # BLD03064 - ~, . =;y r 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspeMed prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Sofls shall be permanently stabilized with seeding, plantings, sodding, etc. once constriction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call.385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates ~~ 1-800-424-5555 Page 4 of 4 Waterman & Kalz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: 360.379-5086 Fax 360.385-7675 • • • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-064R-1 Issued: 10/29/03 Parcel Number: 948 318 404 Job Address: 1109 Rosecrans Street Zoning: R II Type: V-N Occupancy: RR=3 Total Occupant Load: No Change Nature of Work:_Revision #1: Revise roof framing from vaulted 2 x 12s with beam to engineered trusses. Owner: Gerald Moch Contractor: Owner GENERAL CONDITIONS APPLY: See last cage SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 NOTE: See original permit BLD03-064 for all other inspections RFnT1TRF,TI TNCPF.f TTCINC ~ a~vn~rlcnm ~ mlc FRAMING Trusses -Engineered truss plan to be on-site at inspection Truss positive connection INSULATION Ceiling (Truss R-38) CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 2 f Building Permit #03-064R-1 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a Ci business license. Failure to provide proof of this, documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspectionsr 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required Public Works approval must be received arior to scheduling the Building Department's final inspection 7. Final Inspections are. required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2