HomeMy WebLinkAboutBLD03-064Waterman & Katz Building
,„,,._
~ 181 Quincy Street, Suite 301
i
Port Townsend, WA 98368
Phone: (360) 379-3208 Fax: (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
~~
•
Permit Number: BLD03-064 Issued: 05/06/02 Parcel Number: 948 318 404
Job Address: 1109 Rosecrans St. Zoning: R-2 Type: V-N Total Occupant Load: 2
Occupancy: R 3 Nature of Work: Construct New ADU attached to ezisting SFR
Owner: Gerald F. Moch Contractor: Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
UTi l1TT772Ti T1 7NC7~Ff''TTCINC
A PPR (1VFn/n A TF,
TEMP EROSION & SDM'T CONTROL
See General Condition No. 2 & attached SDP 02-023
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving the
site
FOOTINGS
Setbacks
Footings
t
Forms ~-
~'
~
~~ ~ ~ ~
Reinforcement ' '~
'
~__ - "
Interior Footings _
.
Porch/Deck Piers
LIFER
FOUNDATION
Stem Wall
Forms
Reinforcement
Holdowns__ --- - _ _ ___ _ ~ _ _
_ ___ __ _-__ _ __..--
~,
Anchor Bolts & BP washers ~
x ' s T
~ '' !!! ~ ,~
~~
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 1
Pem»t # BLD03-064 " _,
•-
ti
REQUIRED INSPECTIONS
APPROVED/DATF
PLUMBING:
Rough-In (D-V-T & Clean outs)
Water Supply
Gas Supply
Water Hammer Arrestor @ dishwasher
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
Water Heater
Seismic Restraint - 2 places
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
18" A. F. F.
R-10 under
MECIiANICAL
Whole House Fan - @ bath
Kitchen Fan
Environmental Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located 3' from
openings}
FRAMING fz- ~'-~2~t ~ G~ O ~ Z,,, Q~
Walls -one hour wall & ceiling per plans to separate
garage/ADU
Joists -engineered TJI plan shall be on-site at time of
Inspection
Holddowns
Roof
Blocking
Rafter Positive Connections
Roof Venting - eave and ridge vents
Windows -escape
Windows -safety glazing
Windows Ufactor - .40 or better for unlimited glazing
NFRC window sticker must be on windows & doors at
inspection time
Fresh Air Intake (Window Ports)
Doors U-Factor - .20 or better
Air Seal
Fire Blocking
Weather Resistive Barrier
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
Permit tl BLD03064
RF.OUIRED INSPECTIONS
APPROVED/DATE
INSULATION
Floor (R-30 )
Walls (R-21)
Ceiling (R-30)
Vapor Barrier: paint
Baffles
DRY WALL NAILING
Walls
Ceiling
Garage/ADU Occupancy Separation
FINAL
House Numbers @ ADU - 5"minimum
Plumbing
Mechanical/Heating
Deck/Stairs/Landings
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
final -Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
Pmnit # BLD03064 - ~, .
=;y
r
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspeMed prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Sofls
shall be permanently stabilized with seeding, plantings, sodding, etc. once constriction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call.385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates ~~
1-800-424-5555
Page 4 of 4
Waterman & Kalz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: 360.379-5086 Fax 360.385-7675
•
•
•
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-064R-1 Issued: 10/29/03 Parcel Number: 948 318 404
Job Address: 1109 Rosecrans Street Zoning: R II Type: V-N Occupancy: RR=3
Total Occupant Load: No Change
Nature of Work:_Revision #1: Revise roof framing from vaulted 2 x 12s with beam to
engineered trusses.
Owner: Gerald Moch
Contractor: Owner
GENERAL CONDITIONS APPLY: See last cage
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
NOTE: See original permit BLD03-064 for all other inspections
RFnT1TRF,TI TNCPF.f TTCINC
~ a~vn~rlcnm ~ mlc
FRAMING
Trusses -Engineered truss plan to be on-site at
inspection
Truss positive connection
INSULATION
Ceiling (Truss R-38)
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 2
f
Building Permit #03-064R-1
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a Ci business license. Failure to provide proof of
this, documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspectionsr
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required Public Works approval
must be received arior to scheduling the Building Department's final inspection
7. Final Inspections are. required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2