Loading...
HomeMy WebLinkAboutBLD03-063• ,~ • CITY OF PORT TOWNSEND Waterman 8c Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDU3-063 Issued: 05/21/03 Parcel Number: 989 800 001 Job Address: 602 Howard Street Zoning: P. T. Business Park PUD Type: V-N Occupancy: M Total Occupant Load: 325 Nature of Work: Construct 13,126 square foot Retail Building Owner: Tacoma Goodwill Industries Contractor: Mountain Construction MOUNTCI179N2 GENERAL CONDITIONS APPLY -SEE LAST PAGE NOTE: Special Inspection is required for all structural welding, 3, 000 psi concrete for walls and slab, A325 high strength bolting, bolts installed in concrete, etc. as required by UBC Section 1701.5. Special Inspector shall be a Washington licensed engineer or ICBO certified inspector. ICED certified inspector to either b e listed in the current edition of WABO A ency and Inspector Register or present credentials to the Building Department prior to performing inspections. Required Special Inspection Reports shall indicated compliance with the plans and specifications and shall be copied to the Building Department in a timely manner. Permit Holder or Permit Holders' Agent shall review and oversee correction of any and all deficiencies noted by required special inspections. Hours of construction shall be limited to 7 a.rr~ to 6 n.m., Monday through Friday and prohibited on weekends and national holidays RE UIRED INSPECTIONS APPROVED/DATE TEMPORARY EROSION & SEDIMENT CONTROL Temporary erosion and sediment control measures shall be installed on-site as per civil drawings during construction to contain dirt and sediment on-site. Adjacent rights-of--way shall be kept clean through sweeping of paved surfaces, tire wash, etc. SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 Street & Utility Development Permit -contact Francesca Franklin @ 379-5093 Sign -contact Jean Walat @ 360-385-0644 Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 6 REQUIRED INSPECTIONS aPPRnVF.nma'rF. Permit #BLD03-063 FOOTINGS -per structural drawings, sheets S 1.1, S2.0, SS.O & S.1 per: ~~. ~-~,,(~,S ~.i G s,4L ~ ~ ~0 Setbacks: E 20'; W 20'; N 5'; S 20' ~ 3 ~ ~, ~ ~ Forms ` ~~ ~ C s~ ~J~~ s c.s~ ~~~' og ~l ~'1 f o3 Reinforcement - #4 and larger, grade 60 GROUNDWORK PLUMBING N ~er~~riau A ~K. ~, p~ Pressure Test Pipe Joints Exposed Pipe Bedding Trap Seal Protection (if applicable) SLAB - 3, 000 psi concrete requires special inspection; refer to sheets S 1.1, 52.0 and SS. 0 Reinforcement Control Joints Dowels FOUNDATION -refer to foundation structurals Forms Reinforcement -also lap schedule, sheet Sl.l Bolts -see sheet Sl.l, detail 1 UFER PLUMBING: Barrier-Free Compliance Required ~ g /, I D Tj ' D-W-V Rough-In l Water Su 1 Water Fountains Water Hammer Arrestors (if applicable) Floor Drains -trap seal protection required Pipe Insulation - R-3 Hose Bibbs - backflow protection required -/ 3~/~-3 Pressure Reduction Valve if > 80 psi Hot Water Heater R-10 under if electric Seismic Restraint PTR Valve Drain to exterior MECHANICAL ' NREC Temperature Zones Thermostat Controls Deadband Control a ~ ~ ~ ~ J Setback with 7 different day types Microprocessor controls with heat indicators Dampers D t I s l ti li d S Q ~ ~ ( 6 n u a on an ng- uc ea 3 0 ~ © d - ~ g butt ~~, .i Ca1148~ours before you dig for utility line locates 1-800-424-5555 Page 2 of 6 r w Permit tBLD03-063 • • • RF,nT1TRF,T) TN~PF.C'TTnNS APPRnVED/DATE MECHANICAL (continued) HVAC Units & Economizers Factory Applied Nameplate Manu' s Operating Instructions Attached Unit ID' ed for area served Access and work space for maintenance Disconnect Condensate Drain Mechanical Equipment connection shall be per manufacturer's specifications; engineered curb connection details shall be on- site at time of inspection and copied to the Building Department Exhaust Fan Bathroom ducting, insulation and termination FRAMING x. ~. , : - X>:t ~-c_~a ~n ch~.:~r.~f~=~-z-, e, I 1) Landscaping plan shall be submitted for review prior '"7 f °"t C", ~ ~ l 1 ~°r to framing and shall include dumpsfer screening, bike ~ ~~ + '' rz. ~~5~*--~- F`-~'-~~-~~-~~~ rack and walkway details and locations _ ~ j ~ 2) Revisions required by Business Park Architectural ~ ^ ~ i ~ ~'''~'~~"" `` /,,~/ ~'' ~~``'~-""^ `~' K ~'~`~"~ ` ~ ~ ~~ ~ ~ ~' ~' ~~ ~' Committee shall be submitted and approved prior to ~" ' - l `7 ~' framing; approval copied to Bldg. Dept Walls -panel opening reinforcement Panel Joints Ledger Positive Connections Steel Studs -see connection detai112, sheet SI.1 Steel Columns and Girders Roof -Engineered truss plan to be on-site at time of Inspection; rooftop mechanical equipment & connection details shall be included in load calculations & copied to Building Department Truss Positive Connections Purlins -prefabricated wood truss purlins shall be designed by a WA State Engineer Parapet Awnings/Loading Dock Canopy Posts & Beams -per structurals Header -structural steel wall, detail 13, sheet SI.1 Blocking Roof Drains -detail 1, sheet A7.1 Window U-factor - .90 or better Doors - 1.2 or better Air Seal Fire Blocking Draft Stops Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 6 Permit #BLD03-063 REQUIRED INSPEC'TInN~ APPRnVF.II/iIATF INSULATION -see attached envetope calculations Walls ~ Pl°t=r'L.- o~ ~-a~~.rotz.. '`~ ~° ~ ~cr~`~r~n ~ 8' 110 Tj Roof ~ S~4~D3 DRYWALL touZt.-`F t Walls ~~U3 Ceiling LIGHTING See Approved Plan and NREC Lighting Summary Exterior Lighting per NREC Recessed, modified, shielded, cotor-corrected sodium SUSPENDED CEILING Frame and Supports ~ / / (Inspect prior to ceiling file installation) © ~ ~ O 3 l l PARKING -minimum two (2) barrier free spaces required; verify compliance per attached site/parking plan; contact Jean Walat @385-0644 for inspection Signage (1) Van Accessible Space LANDSCAPING Revisions required; contact Jean Walat @ 385-0644 for plan approval and inspection r Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 6 i • ~ Permit #BLD03-063 • K1EJ U1K1~ll11V5Y1~/C;'1'lUIV~ FINAL Property address posted -min. 5"numbers Public Works Department Sign-Off Fire Department Sign-Off Electrical Sign-off (L & I) Barrier Free access Plumbing -Barrier Free Required Mechanical Heating -W~VI^AQ___._______ _ _ __ Certification letter from installer stating compliance with ,,.~ '~ ~ ___ fresh air requirements Restroom wall and floor covering per UBC 807 Insulation Certificate Door panic hardware Main exit may have key locking device with sign at exit: "THIS DOOR TO REMAIN UNLOCKED DURING BUSINESS HOURS" with 1" high letters on contrasting background t m. 1 ~Y ~~ I. s ~',- // ~~ ~r Exit Signage & Illumination/Back-up power supply Revalue construction for permit fees (f applicable) Final -Building • GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 5 of 6 ~• -; Permit IBLD03-063 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 6 of 6