Loading...
HomeMy WebLinkAboutBLD03-062i '- C CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-~62 Issued: 3/20/03 Parcel Number: 988800302 Job Address: 704 Lawrence Street Zoning: R-II Type: V-N Total Occupant Load: 3 Occupancy: R-3 Nature of Work: Convert basement into living space Owner: Rvan J. Huxtable Contractor: Paradise Bav Design and Construction PARABDB141KW GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 • REQUIRED INSPECTIONS A PPR (1VTi'.1~/11 A TF. PLUMBING: Existing Rough-In Water Hammer Arrestor @ dishwasher , , , ~(~='+~ ~ ~'}'% l '~ ~' ~'~ ~ ~ "~~- ~ -y~ / Pipe Insulation (R-3) ~ ~ ~ ~ ~ ~ ~ 7 (2 l ~ ~ Pressure Reduction Valve if > 80 psi _ - f/ Water Heater Seismic Restraint - 2 places ~ L L ~. ~ ~„ w .~ - Pressure relief valve drain to exterior, terminate " " ~ }~ ~~,~ ~ ~;r-e_ S~r, ra ~ ,~ 6 - 24 above ground R-10 under / fi~ S ~~? G ('C- ~~~ o (U 3 =.P~ C ~. ~ C..a ~., Ie._ MECHANICAL Laundry & Bath Fans Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from openings) Call 48 hours before you dig for utility line locates 1-800-424-5555 Pagelof3 ~~ a s~o3 063 ''i REQUIRED INSPECTIONS APPROVED/DATE FRAMING Walls ~~ ~ vt~,. Blocking Windows -light and ventilation Windows -safety glazing Windows Ufactor - .40 or better NFRC window sticker must be on windows & doors at inspection time Fresh Air Intake (Window or Wall Ports) Doors U-Factor - .20 or better Air Seal Fire Blocking ~', ~,~ S't~ ~~ ~ INSULATION ~7a s~ ~~q10 3 Walls (R-21) . ~ -4 - C y - Go ~ ~ ~ _ r~ v Yr DRY WALL NAILING Walls Ceiling Enclosed Usable Space under Stairs FINAL House Numbers on main house - 5"minimum Plumbing ~~~ ~ ~ l~'~j MechanicallHeating Stairs/I.andings/Handrails ~ Smoke Detectors Final -Building 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 Permit # BLD03-062 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3