Loading...
HomeMy WebLinkAboutBLD03-061- ~ Waterman & Katz Building I81 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone:360-379-5086 Fa:360-385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BiI,D~3-061 Issued: 4/18/03 Parcel Number: 998 803 703 Job Address: 4259 Wilson Street Zoning: R-I Type: V-N Occupancy: R-3 Total Occupant Load: 6/2 Nature of Work: Construct Single-family Dwelling with attached garage Owner: Hammerhead Custom Homes, Inc Contractor: Hammerhead Custom Homes - HAMMECH313J4 GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RF.ifIT TTR Fll TNCPF.f'Ti(1NC APPRnVF.n/nATF. TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks Footings Forms Reinforcement 2 S~ Interior Footings LIFER CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 5 Building Permit #03-061 REnI1IRF,D INSPEC'TinN~ APPRnVF.II/nATF FOUNDATION Stem Wall Forms Reinforcement Beam Pockets Vents - 17 required Anchor Bolts & Washers Post to Foundation Wall Positive Connection Engineered Holdowns ~~ ~~pC ! 2.03 FLOOR FRAMING NOTE: Engineered BCI floor plan on-site and available to the Inspector at inspection time ,~ hq ~/ Joists Blocking ~: ''° ~~7/~ ' ~~ Positive Connections ~~- Treated Woodao Concrete ~~ ~ S Anchor Bolts & Washers ~ PLUMBING Rough-In (D-V-T & Clean outs) Water Supply Water Hammer Arrestors Gas Supply Hose Bibbs - backflow protection required Pipe Insulation (I~-3) Pressure Reduction Valve if> 80 psi Water Heater R-10 under if electric ° Seismic Restraint - 2 places ~ Pressure Relief Valve drain to exterior, terminate ~ Z S,-,a3 6" -24" above ground .. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 5 Building Permit ~t03-061 RF.(~T 1TRF,n TN4PF.C'TTnNS APPRnVED/DATE MECHANICAL Ducts & Duct Insulation -Supply/fresh air ducts in conditioned space: R-4; heating ducts in ~ Z ~ ! a3 unconditioned space: R-8 Whole House Ventilation HVAC Integrated Fresh Air 7" Smooth Duct minimum Terminal Element - 8" Clock timer on furnace fan Other than motorized damper requires letter of certification for flow rates. Whole house fan -Master Bathroom Source Specific Exhaust Fans @ bathrooms (SOcfm), laundry room, (50 cfm) and kitchen (100 cfm) Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) FRAMING Walls -framing per shear wall designations Engineered shear walls Interior shear fvalls Shear Panel Blocking Roof -Engineered truss plan to be on site at ~ ~~ inspection 2 (, ' Truss positive connection Attic venting -ridge & eave Posts, beams and headers -~~~--`_ --_.___._._~_ - -- - ~- m ows -escape ~ Windows - sa e y g azmg Window U-factor - 0.40 or better Door U-factor - 0.20 or better Skylight U-factor - 0.58 or better NFRC sticke~• must be on windows, doors & skylights at time of inspection Air Seal G~•- Fresh Air Intake -Integrated ~ , Z Fireblocking Weather Resistive Barrier Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 5 REQUIRED INSPECTInNS . . Building Perntit #03-061 A ppu nvF.nm a TF INSULATION Floor (R-30) ~~ fob G ~I ~ ~ 3 Walls (R-21) Ceiling (R-38 ) Baffles `/gs p~~, ~ ~I ~ /~ 3 Vapor Barrier -~~aint . 6 mil black poly in crawl space DRYWALL NAILING Walls ' - ~ l ~ ~ ~ 3 fir, ~ ~ o S t_~( Ceiling Interior braced watt Garage House Occupancy Separation ~,~.~„~-O ,~ "1~`l~d 3 FINAL Public Works Sign-off House Numbers - 5" numbers Plumbing Mechanical/Heating ~ ~ ~l~ ~~ -z~ Insulation Certificate Vapor Barrier Paint Certificate Fresh Air Certification for Integrated System ~ Cd ~ Q. Smoke Detectors 1~~ q .~ Stairs, Decks & Landings Final -building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements. of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. Call 48 hours before you dig for utility Iine locates 1-800-424-5555 Page 4 of 5 ~ ~ ~ ~ Building Permit #03-061 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. PO5T THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 5 of 5