CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BiI,D~3-061 Issued: 4/18/03 Parcel Number: 998 803 703
Job Address: 4259 Wilson Street Zoning: R-I Type: V-N Occupancy: R-3
Total Occupant Load: 6/2 Nature of Work: Construct Single-family Dwelling
with attached garage
Owner: Hammerhead Custom Homes, Inc Contractor: Hammerhead Custom Homes -
HAMMECH313J4
GENERAL CONDITIONS APPLY: See last page
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RF.ifIT TTR Fll TNCPF.f'Ti(1NC
APPRnVF.n/nATF.
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks
Footings
Forms
Reinforcement 2
S~
Interior Footings
LIFER
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 5
Building Permit #03-061
REnI1IRF,D INSPEC'TinN~ APPRnVF.II/nATF
FOUNDATION
Stem Wall
Forms
Reinforcement
Beam Pockets
Vents - 17 required
Anchor Bolts & Washers
Post to Foundation Wall Positive Connection
Engineered Holdowns
~~
~~pC
! 2.03
FLOOR FRAMING
NOTE: Engineered BCI floor plan on-site and
available to the Inspector at inspection time ,~
hq
~/
Joists
Blocking ~: ''° ~~7/~ '
~~
Positive Connections ~~-
Treated Woodao Concrete ~~ ~
S
Anchor Bolts & Washers ~
PLUMBING
Rough-In (D-V-T & Clean outs)
Water Supply
Water Hammer Arrestors
Gas Supply
Hose Bibbs - backflow protection required
Pipe Insulation (I~-3)
Pressure Reduction Valve if> 80 psi
Water Heater
R-10 under if electric
°
Seismic Restraint - 2 places ~
Pressure Relief Valve drain to exterior, terminate ~ Z S,-,a3
6" -24" above ground
..
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 5
Building Permit ~t03-061
RF.(~T 1TRF,n TN4PF.C'TTnNS
APPRnVED/DATE
MECHANICAL
Ducts & Duct Insulation -Supply/fresh air ducts in
conditioned space: R-4; heating ducts in
~ Z ~ ! a3
unconditioned space: R-8
Whole House Ventilation
HVAC Integrated Fresh Air
7" Smooth Duct minimum
Terminal Element - 8"
Clock timer on furnace fan
Other than motorized damper requires letter of
certification for flow rates.
Whole house fan -Master Bathroom
Source Specific Exhaust Fans @ bathrooms (SOcfm),
laundry room, (50 cfm) and kitchen (100 cfm)
Environmental air exhaust ducting (with backdraft
dampers), insulation (R-4) and terminus (3' from
openings into building)
FRAMING
Walls -framing per shear wall designations
Engineered shear walls
Interior shear fvalls
Shear Panel Blocking
Roof -Engineered truss plan to be on site at ~ ~~
inspection 2
(, '
Truss positive connection
Attic venting -ridge & eave
Posts, beams and headers
-~~~--`_ --_.___._._~_
-
--
-
~-
m ows -escape ~
Windows - sa e y g azmg
Window U-factor - 0.40 or better
Door U-factor - 0.20 or better
Skylight U-factor - 0.58 or better
NFRC sticke~• must be on windows, doors &
skylights at time of inspection
Air Seal G~•-
Fresh Air Intake -Integrated ~ , Z
Fireblocking
Weather Resistive Barrier
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 5
REQUIRED INSPECTInNS
. .
Building Perntit #03-061
A ppu nvF.nm a TF
INSULATION
Floor (R-30) ~~ fob G ~I ~ ~ 3
Walls (R-21)
Ceiling (R-38 )
Baffles `/gs p~~, ~ ~I ~ /~ 3
Vapor Barrier -~~aint .
6 mil black poly in crawl space
DRYWALL NAILING
Walls
'
-
~
l
~
~
~ 3
fir, ~
~
o
S
t_~(
Ceiling
Interior braced watt
Garage House Occupancy Separation ~,~.~„~-O ,~ "1~`l~d 3
FINAL
Public Works Sign-off
House Numbers - 5" numbers
Plumbing
Mechanical/Heating ~ ~ ~l~ ~~ -z~
Insulation Certificate
Vapor Barrier Paint Certificate
Fresh Air Certification for Integrated System ~
Cd
~ Q.
Smoke Detectors 1~~
q .~
Stairs, Decks & Landings
Final -building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements. of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
Call 48 hours before you dig for utility Iine locates
1-800-424-5555
Page 4 of 5
~ ~ ~ ~
Building Permit #03-061
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works approval
must be received prior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. PO5T THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 5 of 5