HomeMy WebLinkAboutBLD03-060Waterman ~ KatzBuilding
I81 Quincy Street, Suite 301
Port Townund, WA 98368
Phone: (360)379-3208 Fax: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD03-~6~ Issued: 04/07/03 Parcel Number: 989704001
Job Address: 225 Tavlor Street Zoning: C-III Type: V-N Occupancy: B/M
Total Occupant Load: NC Nature of Work: Non-Structural Replacement of Storefront
Owner: Mt. Baker Block Corporation Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
i2F(1TTTRFTI TNCPFf TTC)NC APPR(IVF.iI/11ATF.
•
DEMOLITION
Materials from demolition shall be transported to areas
off-site that meet all the requirements of state and local law
and ordinances
PEDESTRIAN PROTECTION
(see attached info -inspection required)
FRAMING -barrier free access
Walls
Air Seal
Doors & Windows
Headers
U-factor - .75 or better
Safety Glazing
Threshold & Landings
Hardware
Positive Connections
Exit Signage & Illumination
Insulation
Walls - R-11
Ceiling - (if applicable) R-21 or fill exposed cavities
Vapor Barrier e.g., vapor barrier paint
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit #BLD03-060
RE UIRED INSPECTIONS APPROVED/DATE
DRYWALL
Walls
Ceiling
FINAL
Building numbers posted -min. S"numbers
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall Include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris.. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. Alt building permits ezpire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility fine locates
1-800-424-5555
Page 2 of 2