Loading...
HomeMy WebLinkAboutBLD03-060Waterman ~ KatzBuilding I81 Quincy Street, Suite 301 Port Townund, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-~6~ Issued: 04/07/03 Parcel Number: 989704001 Job Address: 225 Tavlor Street Zoning: C-III Type: V-N Occupancy: B/M Total Occupant Load: NC Nature of Work: Non-Structural Replacement of Storefront Owner: Mt. Baker Block Corporation Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE i2F(1TTTRFTI TNCPFf TTC)NC APPR(IVF.iI/11ATF. • DEMOLITION Materials from demolition shall be transported to areas off-site that meet all the requirements of state and local law and ordinances PEDESTRIAN PROTECTION (see attached info -inspection required) FRAMING -barrier free access Walls Air Seal Doors & Windows Headers U-factor - .75 or better Safety Glazing Threshold & Landings Hardware Positive Connections Exit Signage & Illumination Insulation Walls - R-11 Ceiling - (if applicable) R-21 or fill exposed cavities Vapor Barrier e.g., vapor barrier paint Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit #BLD03-060 RE UIRED INSPECTIONS APPROVED/DATE DRYWALL Walls Ceiling FINAL Building numbers posted -min. S"numbers Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall Include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris.. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. Alt building permits ezpire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility fine locates 1-800-424-5555 Page 2 of 2