Loading...
HomeMy WebLinkAboutBLD03-056Waterman 8c Katz Building 181 Quincy SVeet, Suite 301 Port Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 • CITY OF PORT TO~`iUNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THI5 CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BI.,D~3-~~6 Issued: 04/04/03 Parcel Number: 988 710 501 Job Address: 821 Jefferson Street Zoning: C-III Type: V-N Occupancy: Not Applicable Nature of Work: Install 1/2" collar tie rods Owner: Penee D'Amico Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE R F.(li iTR FTl TNCPF.f TI(1NC APPR(1VF.1)/1)ATF. • DEMOLITION All construction debris to be deposited in approved areas in accordance with local, state and federal laws FRAMING -per engineering '/2" threaded rods Blocking ; # ,~' ,~ Steel Angle ~j' <° ~ ' Ledger !, ,. ° , ` , ` 5/8" bolts -'~ ` r'~ Venting FINAL Final -Building Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit #BLD03-056 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within sia months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2