Loading...
HomeMy WebLinkAboutBLD03-054 f Waterman ~ Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-054 Issued: 04/02/03 Parcel Number: 989 700 906 Job Address: 100 Tvler Street Zoning: C-III Type: V-N Occupancy: M Total Occupant Load: NC Nature of Work: Add new interior demising wall with door; new entry door and gate; new accessible ramp, landing and guardrails Owner: James & Karen Manier Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE • • SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 U T f1T TTl? Ti Tl TNCPF!-'TT(1NC APPR(1VF.n/nATF, DEMOLITION Materials from construction shall be deposited in approved areas off-site in accordance with all state and local laws and ordinances PLUMBING - no proposed changes MECHANICAL - no proposed changes FRAMING - barrier free required Walls Windows -safety glazing required if within 24" of door Doors - .SO or better ~ Door thresholds and hardware ~ 2~ Fireblocking (if applicable) Air Seal Weather Resistive Barrier INSULATION Fill exposed cavities ~~ Recyciing/Lobby Wall - R-11 ~ Z,$ 63 Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 REQUIRED INSPECTIONS APPROVED/DATE Permit ffBLD03A54 ~, DRYWALL NAILING Walls 6 "' ~}~ Ceiling (if applicable) ~ 8~Q3 w~~LS ~ apor arner required on warm side of lobby wal e.g., ~` vapor barrier paint, faced Batts, etc. FINAL barrier free design required Property address posted - miry S"numbers of contrasting color posted near the main entrance of the building and visible from the street per City ordinance. Fire Department Sign-Off Electrical Sign-off (L & I} Vapor Barrier Paint certificate (if applicable) Final - deck/ramp/landings/guardrails/steps Final -Building GENERAL CONDITIONS r 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior • to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. Ali elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required. inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 Permit #BLD03-054 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 • • Watennan & Katz Building ~ 181 Quincy Street Suite 301 i Port Townsend, WA 98368 (Phone) 379-3208 (Fax) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-054R-1 Issued: 06/26/03 Parcel Number: 989-700-906 Job Address: 100 Tyler Street Zoning: C-III Type: V-N Occupancy: AA=3 Total Occupant Load: 36 Nature of Work: Tenant Improvement: add sinks, non- bearing walls, counters, etc. for restaurant "Pete's Place". Owner: Karen and Jim Manier Contractor: Owner GENERAL CONDITIONS APPLY -SEE BELOW SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 Sign Permit Type 1 Hood - 1-Hour Shaft and Range Hood and Exhaust Details to be submitted as Revision NOTE: See original permit BLD03-045 for other inspections RF.(1TTTRF.T) TN~PF,f'TTnN~ APPRnVF.n/nATF. PLUMBING -Barrier Free design required Contractor to verify that existing sewer is sized to accommodate additional fixtures. Drain Waste & Vent, Traps, Clean-outs Water Supply Pressure Reduction Valve if > 80 psi Fixture & Mounting Heights Air Gaps @ food prep sinks and condensate drains. Floor Drains require trap seal protection. GREASE TRAP -Inspection and testing required for all rough-in prior to cover MECHANICAL Bath Exhaust Fans -ducting, insulation, and termination Hood Exhaust & Calculations require permit revision. FRAMING ,.,,, - Walls -New interior demising walls ~ ~' _._.._. Ce11mg _r,~ . - _ Fixture Mounting Heights & Dimensions Doors -thresholds & lever hardware Page 1 of 3 Building Pemut #BLD03-o54R-1 ~ u RE()UIRED INSPECTIONS APPROVED/DATE DRYWALL NAILING Walls Ceiling ,c~ ~ ~ ~ ~ // , /~~ / 9~ ~ - our Shaft -requires permit revision. FINAL Fire Department Sign-Off Health Department Sign-Off Electrical (L&I) Plumbing - barrier free design Mechanical Building Exit Illumination Door Signage (min. I" letters "This door to remain locked during Business hours" if locking hardware on Main Exit) Barrier-Free All Doors require lever type hardware. 'h" maximum thresholds New uni-sex restroom with grab bars and signage GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's retistration number and a City business. license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction- shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A Page 2 of 3 Building Permit #BLD03-054R-1 minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. Atl building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Page 3 of 3 ~-. f°l ~~ / 1. (f/_- _ _ ~ '" ~ ~- L! Waterman & Katz Building CG - - - ~ ~ - 181 Quincy Street Suite 301 ~ ,. ~~~ `~ ~ Port Townsend, WA 98368 - (Phone) 379-3208 (Fax) 385-7675 CITY OF PORT TOV~'NSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-054R-2 Issued: 10/14/03 Parcel Number: 989 700 906 Job Address: 100 Tyler Street Zoning: C-II Type: V-N Occupancy: AA=3 Total Occupant Load: NIC Owner: Jim & Karen Manier (360) 344-4284 Nature of Work: Install Tvpe I Kitchen Hood with Make-up A~fr• Fire Suppression to be installed under separate permit. Contractor: Northern Heating & Sheetmetal - NORTHHM006DG (360) 379-9464 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries a~ 360-417-2702 Building Permit- Required for Type 1 Hood fire suppression system. R.E UIR.ED INSPECTIONS APPR MECHANICAL -see attached UMC details for Commercial Kitchen hoods Appliance/Exhaust Interlock Exhaust Outlet Clearance - 2' above roof,• S' other Type I Duct Gage Duct Joints/Seams -continuous liquid-tight weld Grease Duct Supports - no penetration of duct walls Duct Slope - `/4:12 Duct/Enclosure Separation --3 "min.; 12"max -- - ___-- -Dint EnclosurelShaft -one-hour construction - - - --- - Cleanouts Air Velocity -1 SOOfpm - 2500 fpm Duct/Combustible Clearance -18 "; 3 "from non-combustibles Hood Flashing -less than 12 "from ceiling or walls requires flashing with 22 gage steel Make-up Air per NSM Installation calcs -Revision required for location of hood make-up air inside kitchen - 5 feet separation from exhaust - Duct insulation R-3.3 Grease Filters -see UMC 508.5, attached Canopy Hood -installed per manufacturer's instructions VED/DATE Page 1 of 2 Building Permit #BLD43-054R-2 UIRED FINAL -Building Make-up Air Vent and Exhaust Termination shall be painted a muted gray per attached HPC approval, HPC03-020 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required-prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Page 2 of 2