HomeMy WebLinkAboutBLD03-053i ' ~.
Waterman 8c Ka[z Building
181 Quincy SVeet, Suite 301
Port Townsend WA 98368
Phone: (360)379-3208 Fax: (360)385-7675
- CITY OF PORT TOWNSEND
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-053 Issued: 04/15/03 Parcel Number: 948 329 302
Job Address: 1209 3'~ Street Zoning: R-II Type: V-N Occupancy: R-3
Total Occupant Load: 4 Nature of Work: Construct three stow ADU/heated storage
Owners: Lisa & Charles Deen Contractor: Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: All elements of engineering require inspection prior to cover
~..
~RF.nTTTRFT) TN4PF.f'TTnN~ APPRnVFT)/nATF
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS >~~.~.,,-~ ~.--;-:~.~<~ ~°;t~ ~; ~ t~°~
Setbacks ~ ,
Footings
Forms
~
Reinforcement ,
p
Porch/Deck Piers 3
UFER~y~ S ~ ~
7
r~
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
~ -i
Permit # BLD03-053
RF,nT1TRF.n TNSPF.~'TTnN~ APPRnVF.il/11ATF
FOUNDATION
Stem Wall
Forms ~
~
Reinforcement
Anchor Bolts `'~j ,~
Engineered Holdowns S - l S - 03
FLOOR FRAMING
NOTE: Engineered BCI floor plan on-site and
available to the Inspector at inspection time
Joists
~~ .~ l ~-l~3
'
Engineered Floor Straps (
Blocking
Treated Wood to Concrete
Anchor Bolts & Washers
PLUMBING:
Rough-In (D-V-T & Clean outs)
Fas-~~3'
--previd,~-~~e~-ore-site-
O ~ ~~°3
Water Supply
Water Hammer Arrester @ clothes & dishwashers
Hose Bibs (backflow protection required) _ __ _____-__.._~F___
_ ____~~~_-__-_-----,_.-a----_-~.---~----
~'~ ~~
~'pe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
Water Heater
R-10 under if electric
Seismic Restraint -strap tank @ 1/3 points
18" A. F. F.
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
MECHANICAL -"T` ~~ ~ o ~j 3 O~
Source Specific. Exhaust Fans @ bathrooms (SOcfin),
laundry room,'(50 cfin) and kitchen (100 cfin)
Environmental Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located 3' from
openings)
Whole house fan -bathroom
i
s
Ca1148 hours before you dig for utility tine locates
1-800-424-5555
Page 2 of 4
F
T ~
RE UIRED INSPECTIONS
Permit # BLD03-053
APPROVED/DATE
FRAMING
`Walls
;_ ~
Engineered shear walls ~.~-.-,F~~rz~ o~~ szr~.~~4~" ,f :` ,~ _; ~a:?;.
`Ceilings
Roof- Engineered truss plan to be on site at inspection
Blocking
-Rafter Positive Connections
Roof Venting - cave and ridge vents
Deck - • l ~
~~ ~ t~ ` :a ~,~ .~, , ,
Windows -escape
Windows -safety glazing
Windows Ufactor - .40 or better for unlimited glazing
NFRC window sticker must be on windows, skylights &
doors at inspection time
Fresh Air Intake (Window Ports)
Doors U-Factor - .20 or betterlRated doors @ garage/house
& house/ADU
Air Seal
Fire Blocking
Weather Resistive Barrier
INSULATION i.'s Ar~l,r.,x:~-t~ f~;-f~ i,, 3~ ~,~ ~, ,,
Floor (R-30)
Walls (R-21) ~,,
~ g.,~, ~ 1 ~~ 3'° 3
Ceiling (R-38 ~ ~~~r ~ o.t
apor Barrier: paint
Bailles
DRY WALL NAILING
Walls ~, ,
` ~ ~ , r,~~.c,~,„ = .i_. _, ~.,..n
Ceiling ; ' U~- G,y 4
FINAL
Public Works Sign-Off
House Numbers - 5" minimum ~ ~ "
Plumbing ~ ~'
.,
LPG _ `'
MechanicaUHeating ~"~ '
Vapor Barrier Paint Certificate '
Insulation Certificate '
Smoke Detectors ~ { ~~
Stairs, Decks & Landings
,,.
i ~ `~
Final -Building
Call 48 hours before you dig for utility tine locates
1-800-424-5555
Page 3 of 4
~1~~°y
_ -a
~ ~
Pemut # BLD03-053
_ -- --_ 1
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number. and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall 6e permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
scheduling the Building Deuartment's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval Qrior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4
•
r
__ ~