Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360) 344-3057 Fax: (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-049 Issued: 11/24/03 Parcel Number: 991400304
Job Address: 218 Sims Way Zoning: CII Type: V-N Occupancy: M
Total Occupant Load: 553 Nature of Work: Construct 4608 sp. ft. Retail Addition
Owner: Henery Hardware Contractor: Little & Little Construction
LITTLLC 15765
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Sprinkler System -Separate Permit required
One-Hour Wall -Twenty foot setback required@ west wall or submit revision for one-
hour construction
VIAQ -Revision required for Deferred Submittal for Ventilation @ .30 cfm/sq. ft.
Mechanical -Revision required for Deferred Submittal for Gas Heater Ducting &
Controls
Lighting -Revision required for Deferred Submittal for Lighting, Daylight Zones & Controls
Electrical -Contact Labor & Industries @ 360-417-2702
Street & Utility Development Permit -contact Francesca Franklin @ 379-5093
Sign - Signage must conform to City regulations; contact Jean Walat @ 360-385-0644
REQUIRED INSPF.C'.TION~
A PPU nvF.nm a TF
TEMPORARY EROSION & SEDIMENT CONTROL
Temporary erosion and sediment control measures shall be
installed on-site as needed during construction to contain dirt
and sediment on-site. Adjacent rights-of--way shall be kept clean
through sweeping of paved surfaces, tine wash, etc.
DEMOLITION
Materials from demolition shall be transported to Jefferson
County Landfill or other approved location in accordance with
all state and local laws
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 5
REQUIRED iN4PF,(''TI(1NC s nnu n ,~x n-~„~ ~.,L, Permit #BLDOS'~~++~a,,
- -
FOOTINGS it V • LJY/ L 1'I
Typical Wall Footing
Setbacks
Forms
Reinforcement
Holdowns
Column Footing `
Forms
Reinforcement
Post Base
In-Wall Column Footing
Forms l ~
Reinforcement ~~
oldowns/Anchor Bolts
Connec i n etail to Existing Foundation
Reinforcement '\
PHDS Holdowns @ openings in existing wall int
-10 insulation ~~ ~~
-Slab Footing @ front canopy
Reinforcement
UND ION
Forms _t ~ ._.-./ -D ~ c'am'
Reinforce G
Anchor olts & w hers - S/8" various spacing
P UMB N : no new plu in pro ed
MECHANICAL -ventilation compliance per VIAQ to be
deferred submittal
Gas Furnace
Factory Applied Nameplate
Operating Instructions Attached
Unit ID' ed for area served
Acc and work space for maintenance r ~
NREC T
emperature Zones
Thermostat Controls
Deadband Control
Setback with 7 different day types
Microprocessor controls with heat indicators
Dampers
Duct Insulation, Termination and Sealing
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 5
s
• J ,.
r
•
A
REQUIRED INSPECTIONS APPROVED/DATE
Permit #BLD03-049
FRAMING -letter re: non-use of high rack storage shall be
- _~submitted riorlo_ z' .ins coon
P_~_ g ~ _ ~___._
.~
_ _------- ~__~.--~--__----_.
" ~
Engineered Shear Walls -prescriptive and designed shear wall ,.------
~ ~:~~
'~
sheathing and nailingshall be inspected prior to cover
" ~ `
? -~ ~" ~
___--
design -
Posts, earns eaders =per
° ~ ~`~
~
Positive Connections :~
°~~. ~
Treated Wood to Concrete ~~
Roof -Engineered truss plan to be on-site at time of
Inspection __
- _
Roof Sheathing -nailed at 6 " o. c. , edges &~eld :~~`~'" , .1 ,_ f ~ ~ . ,
__. _ _
• - ____--
Blockmg ~'
J
'
.
Roof Drams -' ~ r , .Qti ,~ L,,. ' ~,~;.,~, ~.~~ y ~t- ~" - ~ ~ I`
~.
Window Safety Glazing ~ ~ ,
,~_-, ,
Window U-factor - .60 orbetter ~-~ ~ ~ ` ~ ~::~~~ ~~~ ~
_ ~~~ ~ ~ ~~,~ ~:'- r ---a
!~_~- ~ -
Doors - .60 or better f~
Air Seal
Rafter & Truss Positive Connections
Fire Blocking
Draft Stops
Weather Resistive Barrier
INSULATION
Wall s - R-19 ~~ ~°-- ' _' ~~f - ~4-~ ~__~ ~ g'~ > ~ f ~~ _ , f~
'~~- ~-~' ~- ~`'~"f
Roof - R-3A- j t ,~~ ' 7 ~" ~' ,'
_
_ 4
Vapor Barrier required on warm side
R-10 @ slab
DRYWALL -one-hour fire-resistive construction is required
@ west wall unless located at least 20 feet from property line
F ~ '
.~ ,~ ' ,'~ Lam. ~--~=
~` "_ _, . _.
~
- _
,
.,
Walls
Ceiling
LIGHTING -revision required to include dayli~ht zones
and controls & exterior lighting
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 5
_ ~ ~'~
Permit #BLD03'-L~1y '~ +
REQUIRED INSPF,CTION~ eppunvF.nmerrF
PARKING - (2) Barrier Free required with (1) Van Accessible
Space
BIKE RACK
Call Jean Walat @ 385-0644 for inspection
LANDSCAPING &
DUMPSTER SCREENING
Call Jean Walat @ 385-0644 for inspection
IN 'sprinkler system requires sepdrafe~p~ermil_
„
erty address posted -min. 5 "numbers
Public Works Department Sig~r-Off
Fire Department Sign-Off ~Q.
8/mil/~'~,d ~..-
~~ OB/zSt~d ~,C
-
Electrical Sign-off (L & I) ~ ~ti`~' `
Barrier Free access
Barrier Free Improvements to existing restrooms
Mechanical
Heating
WSVIAQ
Certification letter from installer stating compliance with
fresh air requirements
Restroom wall and floor covering per UBC 807
Insulation Certificate
Door panic hardware Main exit may have key locking
device with sign at exit: "THIS DOOR TO REMAIN
UNLOCKED DURING BUSINESS HOURS"
with 1" high letters on contrasting background
Exit Signage & Illumination
Revalue construction for permit fees (if applicable)
Final -Building
r
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 5
Permit #BLD03-049
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate .braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 5 of 5
a -
j
.. ' ~` ; ,
:` ,' ~ Waterman & Katz Buildin
"' ' _ ~:, - •' / ~ ~ t ' ~ '"'181 umc Stree Suite 30g
,~ ~ ~ t t,
/ Q Y
- ~ ~ i Port Townsend, WA 98368
,, Pho~: (36Q~f 344-3057 Fax: (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-049R-1 Issued: 02/04/04 Parcel Number: 991400304
Job Address: 218 Sims Way Zoning: CII Type: V-N Occupancy: M
Total Occupant Load: 553 Nature of Work: EnEineering of new steel braces and steel columns to
open existine wall to new addition; new entrance not approved and not included in this revision
Owner: Henery Hardware Contractor: Little & Little Construction
LITTLLC 15765
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Sprinkler System -Separate Permit required
One-Hour Wall -Twenty foot setback required@ west wall or submit revision for one-
hour construction
• VIAQ -Revision required for Deferred Submittal for Ventilation @ .30 cfm/sq. ft.
Mechanical -Revision required for Deferred Submittal for Gas Heater Ducting &
Controls
Lighting -Revision required for Deferred Submittal for Lighting, Daylight Zones & Controls
Electrical -Contact Labor & Industries @ 360-417-2702
Street & Utility Development Permit -contact Francesca Franklin @ 379-5093
Sign - Signage must conform to City regulations; contact Jean Walat @ 360-385-0644
RF.(1TTTRF.T) TNCPF.f TT(lNC
•
e upu nv~ n m ~ m~
See also original Inspection Record
STEEL COLUMNS
Steel Plates to Concrete
Through-rods with epoxy ;,r.-,
Steel Plates to Beam
Lags
Blocking
Nailing
STEEL BRACES -'`~
Positive Connections
~;ail_4~eui-s before you dig for utility line locates
1-500-424-5555
Page 1 of 3
~`' i~ ti
Permit #BLD03-049R-1
FRAMING
Engineered Shear Walls
Wall Framing
Through Rods
Holdowns
Anchor Bolts
0
Straps
Strap Ties/Lap Plate for positive connections
Blocking
Nailing
Treated Wood to Concrete
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut .down while this is accomplished.
•
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works auproval must be received arior to
scheduling the Building Deuartment's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
R
Permit #BLD03-049R-1
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
~ ,~ 1
CITY OF PORT TOWNSEND
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360) 344-3057 Fax: (360) 385-7675
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-049R-2 Issued: 04/06/04 Parcel Number: 991400304
Job Address: 218 Sims Way Zoning: CII Type: V-N Occupancy: M
Total Occupant Load: 553 Nature of Work: Revision #2: Install furnace, ducting and outside air
for ventilation (.30cfm/square foot) and combustion
Owner: Henery Hardware Contractor: Little & Little Construction
LITTLLC 15765
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Sprinkler System -Separate Permit required
One-Hour Wall -Twenty foot setback required@ west wall or submit revision for one-
hour construction
VIAQ -Revision required for Deferred Submittal for Ventilation @ .30 cfm/sq. ft.
• Mechanical -Revision required for Deferred Submittal for Gas Heater Ducting &
Controls
Lighting -Revision required for Deferred Submittal for Lighting, Daylight Zones & Controls
Electrical -Contact Labor & Industries @ 360-417-2702
Street & Utility Development Permit -contact Francesca Franklin @ 379-5093
Sign - Signage must conform to City regulations; contact Jean Walat @ 360-385-0644
REQUIRED INSPECTIONS
APPROVED/DATE
See also original Inspection Record
MECHANICAL
Forced Air Furnace
Heating Ducts - R-3.3 when located within conditioned space
Duct Sealing
Positive Connections
HVAC
Factory Applied Nameplate
Manufacturer's Operating Instructions Attached
Unit ID'ed for area served
Access and work space for maintenance
Disconnect
Combustion Air
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
. ,
Permit #BLD03-049R-2
RF,OiJiRED INSPECTIONS APPROVED/DATE
MECHANICAL (continued)
NREC Temperature Zones
Thermostat Controls
Deadband Control
Night Setback with 7 different day types
Microprocessor Controls with heat indicator
Dampers
Thermostat Interlock
Heat Source Equipment and Controls
Efficiency - 80% per plans okay
WSVIAQ
Fresh Air -testing & certification required prior to final
FINAL -Mechanical
Certification letter from installer stating compliance with
fresh air requirements of . 30 cfm/square foot
Commissioning Report per NREC 1416.4.2.2
•
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reEistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections. .
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is reauired. Public Works approval must be received prior to
• scheduling the Building Department's final inspection.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
i y
Permit #BLD03-049R-2
• 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
C]
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360)344-3057 Fax: (360)385-7675
•
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
CITY OF PORT TOWNSEND
Permit Number: BLD03-049R-3
Job Address: 218 Sims Way Zoning: CII
Issued: 05/21/04 Parcel Number: 991400304
Type: V-N Occupancy: M
Total Occupant Load: 553 Nature of Work: Revision #3: Revise engineering for canopy foundation and
framing and parapet wall; add new entry with automatic sliding doors
Owner: Henery Hardware Contractor: Little & Little Construction
LITTLLC 15765
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Sprinkler System -Separate Permit required
One-Hour Wall -Twenty foot setback required@ west wall or submit revision for one-
hour construction
• VIAQ -Revision required for Deferred Submittal for Ventilation @ .30 cfm/sq. ft.
Mechanical -Revision required for Deferred Submittal for Gas Heater Ducting &
Controls
Lighting -Revision required for Deferred Submittal for Lighting, Daylight Zones & Controls
Electrical -Contact Labor & Industries @ 360-417-2702
Street & Utility Development Permit -contact Francesca Franklin @ 379-5093
Sign - Signage must conform to City regulations; contact Jean Walat @ 360-385-0644
REQUIRED INSPECTIONS
APPROVED/DATE
See also original plans and Inspection Record.
DEMOLITION
Materials from demolition shall be transported to Jefferson
County Landfill or other approved location in accordance with
all state and local laws
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
Permit #BLD03-049R-3
RFOTITRF.D TNSPF,CTTONS APPROVED/DATE
FOOTINGS
New Entry/Addition Footing
Forms
Reinforcement
Holdowns/Anchor Bolts
New Opening Footing and Bolting
CANOPY SLAB
Slab Footing @ front canopy
Forms
Reinforcement
FRAMING -letter re: non-use of high rack storage shall be
submitted prior to framing inspection
Walls ``
Engineered Shear Walls -prescriptive and designed shear wall _ , f
sheathing and nailing shall be inspected prior to cover _'
Posts, Beams & Headers -per design
Floor Framing '~~
Positive Connections
Treated Wood to Concrete
Roof -Engineered truss plan to be on-site at time of '` ~
Inspection
Roof Sheathing- nailed at 6" o. c. edges & field {
Blocking
Roof Drains
~'
Window & Door Safety Glazing /~
Window U-factor - .60 or better
Doors - . 60 or better -see attached specifications; installation
instructions shall be on-site at time of inspection ~.
Air Seal
Rafter & Truss Positive Connections
Fire Blocking
Weather Resistive Barrier
CANOPY FRAMING
Posts
Post Base
Beams
Hangers
Ledger
Knee Brace
Post Cap
Rafters
Bolts/Positive Connections
Drainage
f
,-
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
Permit #BLD03-049R-3
REQUIRED INSPECTIONS APPROVED/DATE
•
•
PARAPET FRAMING
Wall
Sheathing
Nailing
Screws
Blocking
Straps
Threaded Rods
Brace Anchors
INSULATION.
Walls - R-19 --'"`
Floor - R-30
' fl '
Roof - R-30 _._
`
Vapor Barrier required on warm side
~,
=;
DRYWALL
Walls ,,~'
Ceiling ~ ;~
FINAL -see also original Inspection Record
Property address posted -min. S "numbers
Public Works Department Sign-Off
Fire Department Sign-Off
Electrical Sign-off (L & I)
Barrier Free access and parking
Barrier Free check-out aisles
Mechanical
Heating
WSVIAQ
Certification letter from installer stating compliance with
fresh air requirements
Restroom wall and floor covering per UBC 807
Insulation Certificate
Door panic hardware Main exit may have key locking
device with sign at exit: "THIS DOOR TO REMAIN
UNLOCKED DURING BUSINESS HOURS"
with 1" high letters on contrasting background
Exit Signage & Illumination
Revalue construction for permit fees (if applicable)
Final -Building
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
•.
Permit #BLD03-049R-3
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
• requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•