HomeMy WebLinkAboutBLD03-046!. , ~
1
•
Waterman & Kati Buih1(ng
181 Quincy Strcet, Suite 301
Port Townsend, WA 98368
Phone: 360J79-5086 Fai 360-385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-046 Issued: 04/07/03 Parcel Number: 948 304 801
Job Address: 1679 Jackman Street Zoning: R-H Type: V-N Occupancy: RR=3
Total Occupant Load: 4 Nature of Work: Construct Single-family Dwelling
Owner: Robert Kime & Robert Harrison Contractor: Seraphim Builders-SERPHI984CH
GENERAL CONDITIONS APPLY: See last page
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
A F (1T TTT? Ti 11 TNCPF f TT(1NC
APPRnVF.n/11ATF.
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks
Footings ~ k
Forms
Reinforcement
Interior Footings ~'Z~
Porch Piers o
LIFER
CALL 48 hours before you dig-for Utility line locates
1-800-424-5555
Page 1 of 4
~ ,. ~
Building Permit #03A46
RE UIRED INSPECTIONS
APPROVED/DATE
i
FOUNDATION
Retaining Wall
Stem Wall
Forms
`
Reinforcement ~
Vents - 7 Required
Anchor Bolts & Washers (~IZ3I~
P
ost to~Foundation Wall Posrtrve Connection `
Engineered Holdowns
FLOOR FRAMING
ngineere TJI f loor plan on-site and available )
to the Ins ector at ins
s -Structural Select
Blocking
Foundation Pony Wall
Positive Connections ~ y
Treated Wood to Concrete /
Anchor Bolts & Washers
Crawl Access ~ ~/Q3
Foundation Pony Wall
PLUMBING
~''~1
Rough-In (D-V-T & Clean outs)
Water Supply ,_ (~
a mer es ors ~
Gas Supply { `
Hose Bibbs - backflow protection required
Pipe Insulation (R-3) ~,cLC fe ~-~ ~.. rd ~~~ , ~,
Pressure Reduction Valve if > 80 psi ~ i ~
~`' `~' ~
~ l
~~
Water Heater ~ ,/
~
Seismic Restraint - 2 places /
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground ~ ~~ u ~~~~~Ia u~
o
D~
MECHANICAL
LPG Stove /Fireplace -provide specs on-site
Whole house fan -Upstairs Bath
Source Specific Exhaust Fans @ F-1 bathroom (SO cfm),
laundry room, (50 cfm) and kitchen (100 cfm)
Environmental air exhaust ducting (with backdraft
dampers), insulation (R-4) and terminus (3' from
openings into building)
J
Ca1148 hours before ou di for utili lin
y g ty a locates
1-800-424-5555
Page 2 of 4
Building Permit #03-046
r
RF.(ITTTRF.T) TNCPF.f'TTnNC
APPRnVF,n/DATE
FRAMING
Walls -framing per shear wall designations
~~ I l z
En ineered shear walls
g
Shear Panel Blocking
~ 1 i~
~ (~)
Roof -Engineered truss plan to be on site at inspection ~
~
~
Truss positive connection
~
Rafters -Structural Select
Attic venting -ridge & eave
Posts, beams and headers
Windows -escape
Windows -safety glazing
Window U-factor - 0.40 or better
Door U-factor - 0.20 or better
Skylight U-factor - 0.58 or better
NFRC sticker must be on windows, .doors & skylights
Air Seal
Fresh Air Intake -Wall Ports
Fireblocking
Weather Resistive Barrier
INSULATION
Fl
R 30
~"
)
oor ( ~-
Walls (R-21)
Ceiling (R-38)
~
~
~
Baffles :
Vapor Barrier -paint v
6 mil black poly in crawl space
DRYWALL NAILING
Walls E~J ~`
.~~
~ -' ~ K.. ,~' ~ ?>
Ceiling
Enclosed Usable Space under Stairs
FINAL
Public Works Sign-off
LPG
House Numbers - 5" numbers
Plumbing
MechanicallHeating
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Stairs, Porch & Landings
Final -building
Ca1148 hours before you dig for utility line locates
1-800-424-SSSS
Page 3 of 4
~' .
Building Permk #03-046
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacentrights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is reauired. Public Works approval
must be received~rior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project,
8. All building permits ezpire if no progress has been made within sig months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: 360-379-5086 Faz360-385-7675
•
•
•
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-046R-1 Issued: 04/1703 Parcel Number: 948 304 801
Job Address: 1679 Jackman Street Zoning: R-II Type: V-N Occupancy: R-3
Total Occupant Load: No Change
Nature of Work: Revision #1: change 2900 psi concrete to 2500, lumber grade from spruce to
select. Details provided on crawl space venting and roof framing layout.
Owner: Robert Kime & Robert Harrison Contractor: Seraphim Builders-SERPHI984CH
GENERAL CONDITIONS APPLY: See below
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
NOTE: See original inspection record BLD03-046 for other inspections.
RE UIRED INSPECTIONS APPROVED/DATE
No changes to required inspections Refer to
original inspection record
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 2
Building Pemvt #03-046R-1
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works approval
must be received prior to scheduling the Building Department's final inspection
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits ezpire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2