Loading...
HomeMy WebLinkAboutBLD03-046!. , ~ 1 • Waterman & Kati Buih1(ng 181 Quincy Strcet, Suite 301 Port Townsend, WA 98368 Phone: 360J79-5086 Fai 360-385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-046 Issued: 04/07/03 Parcel Number: 948 304 801 Job Address: 1679 Jackman Street Zoning: R-H Type: V-N Occupancy: RR=3 Total Occupant Load: 4 Nature of Work: Construct Single-family Dwelling Owner: Robert Kime & Robert Harrison Contractor: Seraphim Builders-SERPHI984CH GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 A F (1T TTT? Ti 11 TNCPF f TT(1NC APPRnVF.n/11ATF. TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks Footings ~ k Forms Reinforcement Interior Footings ~'Z~ Porch Piers o LIFER CALL 48 hours before you dig-for Utility line locates 1-800-424-5555 Page 1 of 4 ~ ,. ~ Building Permit #03A46 RE UIRED INSPECTIONS APPROVED/DATE i FOUNDATION Retaining Wall Stem Wall Forms ` Reinforcement ~ Vents - 7 Required Anchor Bolts & Washers (~IZ3I~ P ost to~Foundation Wall Posrtrve Connection ` Engineered Holdowns FLOOR FRAMING ngineere TJI f loor plan on-site and available ) to the Ins ector at ins s -Structural Select Blocking Foundation Pony Wall Positive Connections ~ y Treated Wood to Concrete / Anchor Bolts & Washers Crawl Access ~ ~/Q3 Foundation Pony Wall PLUMBING ~''~1 Rough-In (D-V-T & Clean outs) Water Supply ,_ (~ a mer es ors ~ Gas Supply { ` Hose Bibbs - backflow protection required Pipe Insulation (R-3) ~,cLC fe ~-~ ~.. rd ~~~ , ~, Pressure Reduction Valve if > 80 psi ~ i ~ ~`' `~' ~ ~ l ~~ Water Heater ~ ,/ ~ Seismic Restraint - 2 places / Pressure Relief Valve drain to exterior, terminate 6" -24" above ground ~ ~~ u ~~~~~Ia u~ o D~ MECHANICAL LPG Stove /Fireplace -provide specs on-site Whole house fan -Upstairs Bath Source Specific Exhaust Fans @ F-1 bathroom (SO cfm), laundry room, (50 cfm) and kitchen (100 cfm) Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) J Ca1148 hours before ou di for utili lin y g ty a locates 1-800-424-5555 Page 2 of 4 Building Permit #03-046 r RF.(ITTTRF.T) TNCPF.f'TTnNC APPRnVF,n/DATE FRAMING Walls -framing per shear wall designations ~~ I l z En ineered shear walls g Shear Panel Blocking ~ 1 i~ ~ (~) Roof -Engineered truss plan to be on site at inspection ~ ~ ~ Truss positive connection ~ Rafters -Structural Select Attic venting -ridge & eave Posts, beams and headers Windows -escape Windows -safety glazing Window U-factor - 0.40 or better Door U-factor - 0.20 or better Skylight U-factor - 0.58 or better NFRC sticker must be on windows, .doors & skylights Air Seal Fresh Air Intake -Wall Ports Fireblocking Weather Resistive Barrier INSULATION Fl R 30 ~" ) oor ( ~- Walls (R-21) Ceiling (R-38) ~ ~ ~ Baffles : Vapor Barrier -paint v 6 mil black poly in crawl space DRYWALL NAILING Walls E~J ~` .~~ ~ -' ~ K.. ,~' ~ ?> Ceiling Enclosed Usable Space under Stairs FINAL Public Works Sign-off LPG House Numbers - 5" numbers Plumbing MechanicallHeating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Stairs, Porch & Landings Final -building Ca1148 hours before you dig for utility line locates 1-800-424-SSSS Page 3 of 4 ~' . Building Permk #03-046 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacentrights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is reauired. Public Works approval must be received~rior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project, 8. All building permits ezpire if no progress has been made within sig months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4 Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: 360-379-5086 Faz360-385-7675 • • • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-046R-1 Issued: 04/1703 Parcel Number: 948 304 801 Job Address: 1679 Jackman Street Zoning: R-II Type: V-N Occupancy: R-3 Total Occupant Load: No Change Nature of Work: Revision #1: change 2900 psi concrete to 2500, lumber grade from spruce to select. Details provided on crawl space venting and roof framing layout. Owner: Robert Kime & Robert Harrison Contractor: Seraphim Builders-SERPHI984CH GENERAL CONDITIONS APPLY: See below SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 NOTE: See original inspection record BLD03-046 for other inspections. RE UIRED INSPECTIONS APPROVED/DATE No changes to required inspections Refer to original inspection record GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 2 Building Pemvt #03-046R-1 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits ezpire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2